Return to search results   -   Start a new search   -   Comment on this application

Planning Application: 6/2026/0477/FULL




FULL PERMISSION
Under Consultation
Mr James Wells
j.wells@welhat.gov.uk
University Of Hertfordshire College Lane Campus College Lane Hatfield AL10 9AB
Installation of plant and machinery comprising Air Source Heat Pumps (ASHP), Electrical Panels and Variable Refrigerant Flow (VRF) systems to serve the Film, Music and Media Building at the College Lane Campus at University of Hertfordshire to contribute towards the University's decarbonisation programme
521422
207573

  • Hatfield South West

  • Councillor Timothy Rowse
  • Councillor Helena Goldwater
  • Councillor Karthik Bonkur
Hatfield
100081151555
16/03/2026
25/03/2026
27/05/2026
Savills (UK) Ltd
University of Hertfordshire
Unex House 132-134 Hills Road Cambridge CB2 8PA
c/o Agent AL10 9AB
Description Distance
Minerals Safeguarding Area 0.00
Parish 0.00
Rights of Way 27.30
University of Hertfordshire 0.00
Watling Chase Community Forest 0.00
Article 4 HMO Direction 0.00
Article 4 Additional Storeys 0.00
Cycle Paths 0.74
Flood Zone Surface Water 1000mm 0.00
Chalk Mine Buffer 0.00
Chalk Mine Zone 0.00
Hertfordshire Ecological Network 0.00
Sand and Gravel Belt 0.00
Hatfield Heritage Assesment Areas 0.00
Great Crested Newts DLL Risk Zones 0.00
NATS Safeguarding Area Wind Turbine Development 0.00
LLA Aerodrome Safeguarding Area 0.00
London Heathrow Safeguarding Area 0.00
Elstree Aerodrome Safeguarding Area 0.00
Delegated

To download a selection of individual documents place a tick alongside each of the relevant rows and then click on Download selected files. To download all of the documents place a tick in the box alongside the header row and all of the files will be selected, then click on Download selected files. To view individual documents click on the File for the required row.

File Description Date Uploaded
Application Form - Without Personal Information
File: ApplicationFormRedacted.pdf (405 kb) Description: Applicationformredacted Created Date: 16/03/2026
Block Plan
File: Proposed - Block Plan.pdf (417 kb) Description: Proposed Block Plan Created Date: 25/03/2026
Location Plan
File: Existing - Site Plan.pdf (688 kb) Description: Existing Site Plan Created Date: 25/03/2026
Plans
File: Existing - Block Plan.pdf (416 kb) Description: Existing Block Plan Created Date: 25/03/2026
File: Existing - East Elevation.pdf (341 kb) Description: Existing East Elevation Created Date: 25/03/2026
File: Existing - Ground Floor.pdf (319 kb) Description: Existing - Ground Floor Created Date: 25/03/2026
File: Existing - North Elevation.pdf (445 kb) Description: Existing North Elevation Created Date: 25/03/2026
File: Existing - South Elevation.pdf (439 kb) Description: Existing South Elevation Created Date: 25/03/2026
File: Existing - West Elevation.pdf (259 kb) Description: Existing West Elevation Created Date: 25/03/2026
File: Proposed - East Elevation.pdf (290 kb) Description: Proposed East Elevation Created Date: 25/03/2026
File: Proposed - Ground Floor.pdf (344 kb) Description: Proposed Ground Floor Created Date: 25/03/2026
File: Proposed - North Elevation.pdf (439 kb) Description: Proposed North Elevation Created Date: 25/03/2026
File: Proposed - Section.pdf (465 kb) Description: Proposed Section Created Date: 25/03/2026
File: Proposed - Site Plan.pdf (688 kb) Description: Proposed Site Plan Created Date: 25/03/2026
File: Proposed - South Elevation.pdf (438 kb) Description: Proposed South Elevation Created Date: 25/03/2026
File: Proposed - West Elevation.pdf (256 kb) Description: Proposed West Elevation Created Date: 25/03/2026
Air Quality Statement
File: 13542-R03 University of Hertfordshire (FMM Building) - Air Quality Assessment 130226 (p) (002).pdf (1597 kb) Description: Air Quality Assessment Created Date: 16/03/2026
Noise Impact Assessment
File: UH FMM NIA Report Rev1 (1) (003).pdf (2640 kb) Description: Noise Impact Assessment Created Date: 16/03/2026
Superseded Plans
File: Existing - Site Plan.pdf (639 kb) Description: Existing Site Plan Created Date: 16/03/2026
File: Existing - Block Plan.pdf (367 kb) Description: Existing Block Plan Created Date: 16/03/2026
File: Existing - East Elevation.pdf (292 kb) Description: Existing East Elevation Created Date: 16/03/2026
File: Existing - West Elevation.pdf (220 kb) Description: Existing West Elevation Created Date: 16/03/2026
File: Existing - North Elevation.pdf (404 kb) Description: Existing North Elevation Created Date: 16/03/2026
File: Existing - South Elevation.pdf (398 kb) Description: Existing South Elevation Created Date: 16/03/2026
File: Proposed - Block Plan.pdf (367 kb) Description: Proposed Block Plan Created Date: 16/03/2026
File: Proposed - Site Plan.pdf (638 kb) Description: Proposed Site Plan Created Date: 16/03/2026
File: Proposed - East Elevation.pdf (240 kb) Description: Proposed East Elevation Created Date: 16/03/2026
File: Proposed - West Elevation.pdf (210 kb) Description: Proposed West Elevation Created Date: 16/03/2026
File: Proposed - North Elevation.pdf (395 kb) Description: Proposed North Elevation Created Date: 16/03/2026
File: Proposed - South Elevation.pdf (394 kb) Description: Proposed South Elevation Created Date: 16/03/2026
File: Proposed - Ground Floor.pdf (295 kb) Description: Proposed Ground Floor Created Date: 16/03/2026
File: Proposed - Section.pdf (422 kb) Description: Proposed Section Created Date: 16/03/2026
Supporting Information
File: Covering Letter - FINAL_Redacted.pdf (210 kb) Description: Cover Letter Redcated Created Date: 16/03/2026
File: 13542-R13-IA- University of Hertfordshire (FMM Building) - EcIA 170326 (p).pdf (1052 kb) Description: Ecological Impact Assessment Created Date: 25/03/2026
File: Covering Letter II 25.03.26- FINAL_Redacted.pdf (176 kb) Description: Cover Letter Redacted Created Date: 25/03/2026
Organisation Name Sent Reply Due Reply Received
Welwyn Hatfield Borough Council Councillor Helena Goldwater 05/05/2026 26/05/2026
Welwyn Hatfield Borough Council Councillor Karthik Bonkur 05/05/2026 26/05/2026
Welwyn Hatfield Borough Council Councillor Timothy Rowse 05/05/2026 26/05/2026
The Ramblers' Association Ian Hardy 05/05/2026 26/05/2026
Hatfield Town Council Jonah Anthony 05/05/2026 26/05/2026
Welwyn Hatfield Borough Council Landscapes/Tree Officer 05/05/2026 26/05/2026
Hertfordshire Ecology Martin Hicks 05/05/2026 26/05/2026
WHBC - Public Health and Protection Public Health and Protection 05/05/2026 26/05/2026
Welwyn Hatfield Borough Council WHBC S106 and CIL Officer 05/05/2026 26/05/2026
Address Date Sent Expiry Date Date Reconsulted Reconsult Expiry Date
120 College Lane Hatfield AL10 9PA 05/05/2026 27/05/2026
Application Number Proposal Decision Distance
6/2026/0798/COND Submission of details pursuant to Condition 3 (Construction Method Statement), condition 4 (Surface Water Drainage) on planning permission 6/2025/1974/MAJ
6/2025/1974/MAJ Erection of university building and associated landscaping and infrastructure works, following demolition of various existing buildings Granted
6/2024/2288/FULL Demolition of existing university buildings and associated works Granted 0
6/2024/0366/COND Submission of details pursuant of condition 6 (Landscapes) on planning permission 6/2020/2526/MAJ Granted
6/2022/2464/COND Submission of details pursuant to condition 5 (external surface materials) on planning permission 6/2020/2526/MAJ Granted
6/2022/2366/COND Submission of details pursuant of condition 5 (materials) on planning permission 6/2020/2526/MAJ Granted
6/2022/1478/COND Submission of details pursuant to condition 5 - part discharge (materials) on planning permission 6/2020/2526/MAJ Granted
6/2022/0906/COND Submission of details pursuant to condition 5 (sample of materials) on planning application 6/2020/2526/MAJ Granted
6/2022/0755/FULL Erection of single storey glasshouse and associated single storey plant growth room Granted 0
6/2021/3176/COND Submission of details pursuant to condition 7 (swift nestling bricks / bird boxes), 8 (cycle parking), and 12 (travel plan) on planning application 6/2020/2526/MAJ Granted
6/2021/3195/PN15 Prior approval for the installation of proposed 16.0m Phase 8 Monopole C/W wraparound Cabinet at base and associated ancillary works. Prior Approval Required and Granted
6/2021/3093/COND Submission of details pursuant of condition 16 (piling and other intrusive groundworks) from planning permission 6/2020/2526/MAJ Granted
6/2021/2913/FULL Re-provision of drainage works Granted
6/2021/2759/COND Submission of details pursuant to condion 1 (construction management plan), 2 (delivery and services plan), and 4 (remediation strategy) on planning application 6/2020/2526/MAJ. Granted
6/2021/2628/VAR Variation of condition 18 (drawing numbers) on planning permission 6/2020/2526/MAJ Withdrawn
6/2021/2306/COND Submission of details pursuant to conditions 3 (surface water drainage) and 15 (drainage systems) on planning permission 6/2020/2526/MAJ Granted
6/2021/0440/ADV Installation of a window display advertisements Granted
6/2020/2526/MAJ Erection of a five-storey academic building (Class F1(a) use) with roof plant level, landscaping and associated development. Granted
6/2017/1303/VAR Variation of condition 2 (approved plans) on planning permission S6/2012/1928/PP dated 30/01/2013 Granted
6/2017/1033/FULL Erection of Glasshouse, fencing, hard landscaping and ancillary works. Granted
6/2017/0884/FULL Partial demolition of CP Snow building, alterations to CP Snow psychology wing, demolition of associated outbuildings, landscaping and ancillary works Granted
6/2017/0237/COND Approval of details reserved by condition 5d (verification plan for longer-term monitoring of pollutant linkages, maintenance and arrangements for contingency action) on planning permission S6/2012/1181/MA Granted
6/2016/1896/COND Approval of details reserved by condition 8 Part iii (Implementation of Approved Remediation Scheme) and Part iv (Reporting of unexpected Contamination) on planning permission S6/2013/0435/MA Granted
6/2016/1552/COND Approval of details reserved by condition 8 (external lighting details) and condition 12 (landscaping) on planning permission S6/2012/1928/PP Granted
6/2015/2456/COND Approval of details reserved by condition 13(c) (validation report) on planning permission S6/2012/1928/PP Granted
6/2015/2388/FULL Change of use of land for holding up to and including 15 wedding receptions during the months from 1 March to 30 September each year, with camping for a maximum of 50 wedding guests to take place on the same date that a wedding reception takes place. Granted
6/2015/1744/COND Approval of details reserved by condition 12 (landscaping scheme) on planning permission S6/2012/1928/PP Granted
6/2015/1624/ADV Installation of 1no freestanding illuminated sign Granted
S6/2015/1468/DS Approval of details reserved by condition 3 (materials) of planning permission S6/2014/1902/FP - Erection of 2no Substations and associated landscaping Granted
S6/2015/1380/FULL Installation of timber fence, formation of footpath and associated landscaping works Granted
S6/2015/1296/DS Approval of details reserved by condition 3 (external materials schedule) of planning permission S6/2013/0435/MA - Erection of new science building, associated works and new service road Granted
S6/2015/1188/DS Approval of details reserved by condition 19 (sustainable transport measures and facilities) for planning application S6/2012/1928/PP Granted
S6/2015/0847/DS Approval of details reserved by condition 6 (drainage strategy), 7 (fowl water drainage) & 14 (flood risk assessment) of planning permission S6/2012/1928/FP Granted
S6/2015/0345/NM Non material amendment following approval of planning permission S6/2012/1928/PP - Variation on roof heights Granted
S6/2015/0297/DS Approval of details reserved by condition 5 (travel plan) on planning application S6/2012/1928/PP Granted
S6/2015/0303/LUP Certificate of Lawfulness for proposed banking unit within Hutton Hub Granted
S6/2015/0102/DS Approval of details reserved by condition 3 (materials), 4 (oil and petrol separators) and 5 (hard and soft landscaping) of planning permission S6/2014/1085/MA Granted
S6/2014/1902/FP Erection of 2no Substations and associated landscaping Granted
S6/2014/2030/S73A Variation of condition 24 (delivery of Energy Centre) of planning permission S6/2012/1928/PP - Demolition of existing student residences comprising 1059 bedspace (Roberts Way, Butler Hall, Fern Hall, Chapman Hall, Broad Hall and Coales Hall). Erection of 2511 new student bedrooms arranged in 21 accommodation buildings; retention and extension of existing Telford Court; Provision of social, administration, sports facilities (comprising sports pitch and multi-use games area); combined heat and power energy centre, and associated parking and landscaping Withdrawn
S6/2014/2031/DS Approval of details reserved by conditions 6 (drainage), 7 (foul water drainage) and 14 (surface water drainage) of planning permission S6/2012/1928/PP Granted
S6/2014/1879/DS Approval of details reserved by condition 8 (CCTV Installation) of planning permission S6/2012/1928/PP Granted
S6/2014/1833/AD Installation of one mesh banner sign Granted
S6/2014/1678/DS Approval of details reserved by condition 9 (archaeology evaluation) of planning permission S6/2012/1928/PP Granted
S6/2014/1573/DS Approval of details reserved by condition 6 (drainage) & 7 (foul water drainage) & 11 (acoustic report) & 14 (surface water drainage) of planning permision S6/2012/1928/OP Granted
S6/2014/1470/NM Non material amendment following approval of plnning permission S6/2012/1928/FP - Upper floors reduced from 3m to 2.775m, roof overhangs reduced, height of roof above accommodation reduced, corridors reduced in width and stepped pods shown to reduce GIFA, cladding panels to the side of the townhouse windows changed from timber cladding to metallic grey, hub first floor wall position amended to SE requirements and townhouse canopies omitted Granted
S6/2014/1085/MA Reconfiguration and minor redevelopment of existing surface car park to create an additional 51 parking spaces including revised lighting, pedestrian access and new bin store and storage shed Granted
S6/2014/0713/DS Discharge of condition 12 (landscaping scheme and means of enclosure) of planning permission S6/2012/1928/PP Granted
S6/2014/0545/NM Non material application following approval of planning permission S6/2012/1181/MA - Alterations to Price Edward Hall, Hutton hall and Hutton building.
S6/2014/0479/NM Non material amendment following approval of planning permission S6/2012/1928/FP - Chimneys: Height to be reduced by 1575mm, 3030mm and 3575mm. Positions to be amended plus diameter of 3 no. Chimneys to be increased and 3 no.reduced. East Elevation: 2 no. Additional louvres to be added and louvre locations to be amended plus door to be added at ground floor. North Elevation: Lovres on this elevation to be reduced in size. West Elevation: Roller shutters to be reduced in height by 2m (from 7m to 5m) louvres abobe roller shutters to be increased in height, central door location to be changed and increased in size, lovres to be added at first floor level plus lovres to replace doors at ground level. Plan changes: Green wall to be extended alond grid line A across the entire East elevation. External wall on gridline 1 extended to meet the corner of the green wall and to make enclosure for equipment required for energy centre. Granted
S6/2014/0491/DS Dischage of conditions 13 (Surface Water Drainage Scheme) and 14 (Drainage Strategy) of S6/2013/0435/MA Granted
S6/2014/0382/DS Discharge of condition 4 (materials) & 9 (hard landscaping) of planning permission S6/2012/1181/MA Granted
S6/2014/0071/DS Discharge of condition 9 (archaeology evaluation) of planning permission S6/2012/1928/FP Granted
S6/2014/0038/DS Discharge of Condition 7 (Construction Method Statement) S6/2013/0435/MA Granted
S6/2013/2697/DS Discharge of Conditions 4 (Archaeological Scheme of Investigation) & 8i (Site Characterisation) of planning permission S6/2013/0435/MA Granted
S6/2013/2587/DS Discharge of conditions 6 (Verification Report) 7 (Ground Investigation) of planning permission S6/2013/1181/MA Granted
S6/2013/2050/DS Discharge of condition 12 (Investigation & Stabilisation/ Method Statement/Specification) of planning permission S6/2012/1181/MA - Alterations comprising refurbishment and extension to Prince Edward Hall to provide a new reception area and student/visitor cafe, refurbish and extension to the Hutton Building and Hutton Hall to accommodate the consolidation and co-location of staff and student facilities, including a new extension within the existing quadrant. Alterations to pedestrian routes and the landscaped setting of the buildings, including an improved heritage walkway linking these two focuses of activity (Comprising Phase 1 of the development identified in the University of Hertfordshire 2020 Estate Vision) Granted
S6/2013/1908/DS Discharge of condition 7 (ground investingation) and 12 (trial grouting) of planning permission S6/2012/1181/MA Granted
S6/2013/1850/DS Discharge of condition 7 (Ground Investigation) of planning permission S6/2012/1181/MA - Alterations comprising refurbishment and extension to Prince Edward Hall to provide a new reception area and student/visitor cafe, refurbish and extension to the Hutton Building and Hutton Hall to accommodate the consolidation and co-location of staff and student facilities, including a new extension within the existing quadrant. Alterations to pedestrian routes and the landscaped setting of the buildings, including an improved heritage walkway linking these two focuses of activity (Comprising Phase 1 of the development identified in the University of Hertfordshire 2020 Estate Vision) Granted
S6/2013/1852/DS Discharge of condition 8 of planning permission S6/2012/1181/MA - Alterations comprising refurbishment and extension to Prince Edward Hall to provide a new reception area and student/visitor cafe, refurbish and extension to the Hutton Building and Hutton Hall to accommodate the consolidation and co-location of staff and student facilities, including a new extension within the existing quadrant. Alterations to pedestrian routes and the landscaped setting of the buildings, including an improved heritage walkway linking these two focuses of activity (Comprising Phase 1 of the development identified in the University of Hertfordshire 2020 Estate Vision) Granted
S6/2013/1722/DS Discharge of condition 4: phase 1 (materials) of planning permission S6/2012/1928/PP Granted
S6/2013/0600/DS Discharge of conditions 3 (Phasing Plan), 6, 7 and 14 (External Drainage Surface & Foul Water Drainage Layout), 9 (Archaeology Evaluations), 13 (Site Investigation Reports) and 15 (Construction Management Plan) from planning application S6/2012/1928/PP Part Approved / Part Refused
S6/2013/0498/MA Proposed extension to existing car park 9 and erection of single decked car park to create an additional 80 spaces Granted
S6/2013/0502/DS Discharge of conditions 4 (External Materials) and 9 (Surface Materials) from planning permission S6/2012/1181/MA Part Approved / Part Refused
S6/2013/0435/MA Erection of new science building, associated works and new service road Granted
S6/2013/0164/NM Non material amendment following approval of planning permission S6/2012/1181/MA - Amended site plans, landscape plans and elevations Granted
S6/2013/0117/DS Discharge of conditions 4 (External Surfaces) and 9 (Surface Material) from planning permission S6/2012/1181/MA Granted
S6/2012/2676/DS Discharge of condition 11 (Surface Water Drainage) from planning permission S6/2012/1181/MA Granted
S6/2012/2630/DS Discharge of condition 7 (Ground Investigation) from planning permission S6/2012/1181/MA Part Approved / Part Refused
S6/2012/2631/DS Discharge of condition 8 (Demolition) from planning permission S6/2012/1181/MA Withdrawn
S6/2012/2596/DS Discharge of condition 12 (Borehole Investigation) from planning permission S6/2012/1181/MA Part Discharged
S6/2012/2248/DS Discharge of condition 3 (Phasing Diagram) and 5 (Remediation Strategy) from planning permission S6/2012/1181/MA Granted
S6/2012/2229/DS Discharge of conditions 3 (Phasing Diagram), 5 (Remediation Strategy), from planning permission S6/2012/1181/MA Withdrawn
S6/2012/2234/NM Non material amendment following approval of planning application S6/2012/1181/MA - Amendments to Hutton Hub floor plans, proposed floor plan and external lighting layout Granted
S6/2012/1758/EI Request for Environmental Impact Assessment Screening Opinion Granted
S6/2012/1181/MA Alterations comprising refurbishment and extension to Prince Edward Hall to provide a new reception area and student/visitor cafe, refurbish and extension to the Hutton Building and Hutton Hall to accommodate the consolidation and co-location of staff and student facilities, including a new extension within the existing quadrant. Alterations to pedestrian routes and the landscaped setting of the buildings, including an improved heritage walkway linking these two focuses of activity (Comprising Phase 1 of the development identified in the University of Hertfordshire 2020 Estate Vision) Granted
S6/2012/1022/FP Installation of 2 wind turbines and 27 photovoltaic panels on roof Granted
S6/2011/1814/FP External alterations comprising of the installation of door, glazing, ramp and railings to the west elevation of the Hutton building Granted
S6/2011/1753/EI EIA Screening Report
S6/2010/0744/MA Erection of student accommodation comprising 548 study bedrooms with en-suite bathrooms (including 19 disabled rooms) grouped in clusters (a total of 66) each with a kitchen/communal room. The accommodation is located in 3 blocks, each block has a maximum storey height of 5 storeys, plus an additional lower ground level, creating a maximum of 6 levels. Provision of 7 parking spaces (including 2 disabled) accessed from a new vehicular access from College Lane, together with the provision of cycle spaces, private amenity space, hard and soft landscaping and new boundary treatment, all following the demolition of 11 existing dwellings Refused 0
S6/2010/0375/DS DISCHARGE OF CONDITIONS 4 (MICROGRAVITY SURVEY) & 5 (SOFT & HARD LANDSCAPING DETAILS) FROM PLANNING PERMISSION S6/2009/2697/FP Not Determined
S6/2009/2752/MA PROPOSED SITING OF 5 BLOCKS OF TEMPORARY BUILDINGS OF 2 STOREYS TO PROVIDE 240 STUDENT BEDROOMS Withdrawn
S6/2009/2697/FP ENTRANCE AND RECEPTION REMODELLING COMPRISING PARTIAL DEMOLITION OF EXISTING BUILDING, ERECTION OF NEW EXTENSION AND ASSOCIATED LANDSCAPING Granted
S6/2009/1470/FP AMENDMENT TO PLANNING PERMISSION S6/2007/0273/MA COMPRISING REFURBISHMENT OF ELE HOUSE INVOLVING ALTERATIONS TO THE ELEVATIONS AND THE ADDITION OF PLANT TO THE ROOF Granted
S6/2009/1472/FP AMENDMENT TO PLANNING PERMISSION S6/2007/0273/MA COMPRISING REFURBISHMENT OF HUTTON HALL INVOLVING ALTERATIONS TO EXTERNAL ELEVATIONS Granted
S6/2009/1395/DS DISCHARGE OF CONDITIONS 2 ( MATERIALS TO BE USED IN CONSTUCTION), 22 (UPDATE OF TRAVEL PLAN), 23 (DEMOLITION OF EXISTING BUS INTERCHANGE, ARRANGEMENTS WITH HCC PASSENGER TRANSPORT UNIT) AND 24 (NEW BUS INTERCHANGE) Granted
S6/2009/1016/DS DISCHARGE OF CONDITIONS Granted
S6/2009/0342/DS DISCHARGE OF CONDITIONS 2 (EXTERNAL MATERIALS) AND 21 (WASTE & RECYCLED MATERIALS) OF PLANNING PERMISSION S6/2007/273/MA Granted
S6/2009/0292/AD ERECTION OF ONE EXTERNALLY ILLUMINATED FASCIA SIGN AND THREE INTERNALLY ILLUMINATED FASCIA SIGNS Granted
S6/2009/0254/FP PROPOSED REAR EXTENSION TO FIRST FLOOR LEVEL Granted
S6/2009/0075/DS DISCHARGE OF CONDITIONS 2 (LANDSCAPING), 3 (FENCE), 4 (FOUNDATIONS), 5 (SAMPLES OF MATERIALS), 6 ( LEVELS), 7 (PROTECTING FENCING), 8 (PARKING & STORAGE), 9 (VEHICLES) AND 10 (VEHICLES LEAVING SITE) Part Approved / Part Refused
S6/2008/2423/DS DISCHARGE OF CONDITION 4 (LIGHTING) OF PLANNING PERMISSION S6/2008/1127/MA Prior Approval Not Required
S6/2008/1714/DS DISCHARGE OF CONDITIONS 2 (MATERIALS), 3 (LEVELS), 4 (ACOUSTIC SCREENING), 12 (LANDSCAPING), 16 (SUSTAINABILITY) OF PLANNING PERMISSION S6/2007/0273/MA Granted
S6/2008/1092/AD INSTALLATION OF NON-ILLUMINATED FASCIA SIGN Granted
S6/2008/1127/MA ERECTION OF THREE STOREY CAR PARK Granted
S6/2008/0890/MA CONSTRUCTION OF PLANT ROOM Granted
S6/2007/0273/MA Erection of replacement student entertainment venue, 3 storey car park, single storey nursery, refurbishment and alterations to existing buildings, formation of new Vehicular access and bus interchange facility, with other external works, including associated landscaping, following demolition of existing buildings and structures Granted
S6/2006/1702/FP PROPOSED PRAYER ROOM EXTENSION TO EXISTING KEY CENTRE Granted
S6/2006/0330/FP REPLACEMENT OF EXISTING WINDOWS AND CLADDING PANELS TO TWO HALLS OF RESIDENCE Granted
S6/2006/0265/FP PROPOSED NEW ENTRANCE LOBBY, PROPOSED NEW EXTERNAL PLANT AREA AND MINOR ALTERATIONS AT ROOF LEVEL TO CP SNOW BUILDING Granted
S6/2005/1485/FP FORMATION OF EXTENSION TO EXISTING CAR PARK Withdrawn
S6/2005/1032/FP PROPOSED DISABLED ACCESS LIFT Granted
S6/2004/1875/FP NEW FOUR STOREY TEACHING & ADMINISTRATION BUILDING FOR FACILITY OF HEALTH & HUMAN SCIENCES Granted
S6/2004/1827/FP EXTERNAL LIFT SHAFT TO EXISTING PHYSICAL SCIENCE BUILDING Granted
S6/2004/1717/FP ERECTION OF NEW COMPUTER TEACHING FACILITY Granted
S6/2004/1089/FP INSTALLATION OF EXTERNAL ATM Granted
S6/2004/0713/FP ERECTION OF SINGLE STOREY EXTENSION TO CATERING BUILDING, NEW BOTTLE STORE AND FENCING. Granted
S6/1996/0918/FP Erection of security fence to perimeter of Hatfield Campus Granted
S6/1994/0465/FP Erection of new building to accommodate library, computer and media services Approval Subject to s106
S6/1986/0294/OP Site for high tech light industrial unit with associated parking Granted
1964/0002 Change Of Use - car breaking operations and wood cutting activities Closed

There are no NMAs associated with this application