Return to search results
-
Start a new search
- The consultation period for this application has now closed
Planning Application: 6/2021/2306/COND
|
APPROVAL OF DETAILS RESERVED BY CONDITION
|
Decided - Granted
|
|
Mr Mark Peacock
|
m.peacock@welhat.gov.uk
|
|
Land to the west of the Learning Resource Centre, University of Hertfordshire
College Lane
Hatfield
AL10 9AB
|
Submission of details pursuant to conditions 3 (surface water drainage) and 15 (drainage systems) on planning permission 6/2020/2526/MAJ
|
|
521433
|
207482
|
|
|
|
|
|
100081151555
|
|
02/08/2021
|
02/08/2021
|
|
|
29/09/2021
|
|
|
|
|
Mr Wai-kit Cheung
|
University of Hertfordshire
|
|
First Floor, 41-43 Maddox Street
London
W1S 2PD
|
c/o Turnberry Planning Limited
41-43 Maddox Street
London
W1S 2PD
|
There are no constraints associated with this application
|
Granted
|
08/10/2021
|
|
08/10/2021
|
Delegated
|
|
|
To download a selection of individual documents place a tick alongside each of the relevant rows and then click on Download selected files. To download all of the documents place a tick in the box alongside the header row and all of the files will be selected, then click on Download selected files. To view individual documents click on the File for the required row.
| File | Description | Date Uploaded | |
|---|---|---|---|
| Application Form - Without Personal Information | |||
| File: ApplicationFormRedacted.pdf (94 kb) | Description: Applicationformredacted | Created Date: 02/08/2021 | |
| Plans | |||
| File: P120-ACM-ZZ-ZZ-ZZ-D-C-100010 P01 - Below Ground Drainage Construction Details (Sheet 1 of 3).pdf (534 kb) | Description: Below Ground Drainage Construction Details (sheet 1 Of 3) | Created Date: 02/08/2021 | |
| File: P120-ACM-ZZ-ZZ-ZZ-D-C-100012 P01 - Below Ground Drainage Construction Details (Sheet 3 of 3).pdf (862 kb) | Description: Below Ground Drainage Construction Details (sheet 3 Of 3) | Created Date: 02/08/2021 | |
| File: P120-ACM-ZZ-ZZ-ZZ-D-C-100005 P01 - Exceedance flow routes.pdf (2259 kb) | Description: Exceedance Flow Routes | Created Date: 02/08/2021 | |
| File: P120-ACM-ZZ-ZZ-ZZ-D-C-100011 P01 - Below Ground Drainage Construction Details (Sheet 2 of 3).pdf (522 kb) | Description: Below Ground Drainage Construction Details (sheet 2 Of 3) | Created Date: 02/08/2021 | |
| File: P120-ACM-ZZ-ZZ-ZZ-D-C-100003 P02 - Below Ground Drainage - Main Works (Sheet 1).pdf (2365 kb) | Description: Below Ground Drainage Main Works (sheet 1) | Created Date: 02/08/2021 | |
| File: P120-ACM-ZZ-ZZ-ZZ-D-C-100004 P02 - Below Ground Drainage - Main Works (Sheet 2).pdf (2824 kb) | Description: Below Ground Drainage Main Works (sheet 2) | Created Date: 02/08/2021 | |
| Consultee Response | |||
| File: Environment Agency comments.pdf (78 kb) | Description: Environment Agency response | Created Date: 28/09/2021 | |
| File: LLFA response 620212306COND - LLFA 30.09.21.pdf (71 kb) | Description: Lead Local Flood Authoirty Response | Created Date: 30/09/2021 | |
| Decision Notice PDF | |||
| File: Conditions Response Letter_620212306COND.pdf (48 kb) | Description: Decision Notice PDF | Created Date: 08/10/2021 | |
| Correspondence | |||
| File: Cover Letter - 30 July 2021.pdf (218 kb) | Description: Cover Letter 30 July 2021 | Created Date: 02/08/2021 | |
| Report | |||
| File: UoH SPECS - Proposed Drainage Operation and Maintenance Strategy.pdf (407 kb) | Description: Uoh Specs Proposed Drainage Operation And Maintenance Strategy | Created Date: 02/08/2021 | |
| Supporting Information | |||
| File: External Consultation Checklist for LPAs.pdf (240 kb) | Description: EA Consulatation Checklist | Created Date: 08/09/2021 | |
| File: UoH SPECS - Stage 4 design development - SW Rev 1 - full results.pdf (1505 kb) | Description: Uoh Specs Stage 4 Design Development Sw Rev 1 Full Results | Created Date: 02/08/2021 | |
| File: UoH SPECS - Stage 4 design development - SW Rev 1 - consecutive events(1).pdf (468 kb) | Description: Uoh Specs Stage 4 Design Development Sw Rev 1 Consecutive Events | Created Date: 02/08/2021 | |
| Organisation | Name | Sent | Reply Due | Reply Received |
|---|---|---|---|---|
| Lead Local Flood Authority | Fiona Lai | 08/09/2021 | 29/09/2021 | 30/09/2021 |
| Environment Agency | Natasha Smith | 08/09/2021 | 29/09/2021 | 28/09/2021 |
There are no neighbours associated with this application
| Application Number | Proposal | Decision | Distance |
|---|---|---|---|
| 6/2025/1974/MAJ | Erection of university building and associated landscaping and infrastructure works, following demolition of various existing buildings |
There are no NMAs associated with this application