Planning Application: 6/2023/1618/MAJ




MAJOR DEVELOPMENT
Decided - Granted
Mr William Myers
w.myers@welhat.gov.uk
Hertfordshire Data Centre Mundells Welwyn Garden City AL7 1GE
Construction of a new Data Centre building with ancillary office space, provision of parking, vehicular circulation, sprinkler tanks, landscaping and other ancillary/associated works and the retention of 2 existing substations, following the demolition of the existing former, redundant, vacant Data Centre
525124
213670

  • Haldens

  • Councillor Lucy Musk
  • Councillor Astrid Scott
  • Councillor Matthew Hobbs
10014211971
04/08/2023
24/08/2023
27/09/2023
02/02/2024
25/09/2023
Mr Andy James
Capital and Ascends REIT
St Pauls Place 40 St Pauls Square Birmingham B3 1FQ
c/o Agent ..
Description Distance
Sand and Gravel Minerals Safeguarding Area 0.00
Employment Area 0.00
Green Belt 22.50
Rights of Way 35.15
Rights of Way 32.00
Cycle Paths 2.01
Flood Zone Surface Water 30mm 0.00
Flood Zone Surface Water 30mm 0.00
Flood Zone Surface Water 30mm 0.00
Flood Zone Surface Water 30mm 0.00
Flood Zone Surface Water 30mm 0.00
Flood Zone Surface Water 30mm 0.00
Flood Zone Surface Water 30mm 0.00
Flood Zone Surface Water 30mm 0.00
Flood Zone Surface Water 30mm 0.00
Flood Zone Surface Water 100mm 0.00
Flood Zone Surface Water 100mm 0.00
Flood Zone Surface Water 100mm 0.00
Flood Zone Surface Water 100mm 0.00
Flood Zone Surface Water 100mm 0.00
Flood Zone Surface Water 100mm 0.00
Flood Zone Surface Water 100mm 0.00
Flood Zone Surface Water 100mm 0.00
Flood Zone Surface Water 100mm 0.00
Flood Zone Surface Water 100mm 0.00
Flood Zone Surface Water 1000mm 0.00
Flood Zone Surface Water 1000mm 0.00
Flood Zone Surface Water 1000mm 0.00
Flood Zone Surface Water 1000mm 0.00
Flood Zone Surface Water 1000mm 0.00
Flood Zone Surface Water 1000mm 0.00
Hertfordshire Ecological Network 0.00
Hertfordshire Ecological Network 0.00
Sand and Gravel Belt 0.00
Article 4 Direction Employment Sites 0.00
Granted
02/07/2024
02/07/2024
Delegated

To download a selection of individual documents place a tick alongside each of the relevant rows and then click on Download selected files. To download all of the documents place a tick in the box alongside the header row and all of the files will be selected, then click on Download selected files. To view individual documents click on the File for the required row.

File Description Date Uploaded
Application Form - Without Personal Information
File: ApplicationFormRedacted.pdf (0 kb) Description: Applicationformredacted Created Date: 04/08/2023
Block Plan
File: A22-021-PL-002 - EXISTING SITE PLAN.pdf (0 kb) Description: Existing Site Plan Created Date: 04/08/2023
File: A22-021-PL-003B - PROPOSED SITE PLAN.pdf (0 kb) Description: Proposed Site Plan Created Date: 18/01/2024
Elevation and Floor Plans
File: A22-021-PL-004 - EXISTING GROUND FLOOR PLAN.pdf (0 kb) Description: Existing Ground Floor Plan Created Date: 04/08/2023
File: A22-021-PL-005 - PROPOSED GROUND FLOOR GA PLAN.pdf (0 kb) Description: Proposed Ground Floor Plan Created Date: 04/08/2023
File: A22-021-PL-006 - PROPOSED FIRST FLOOR GA PLAN.pdf (0 kb) Description: Proposed First Floor Plan Created Date: 04/08/2023
File: A22-021-PL-007 - PROPOSED SECOND FLOOR (OFFICE ONLY).pdf (0 kb) Description: Proposed Second Floor (office Only) Created Date: 04/08/2023
File: A22-021-PL-009 - EXISTING ELEVATIONS.pdf (0 kb) Description: Existing Elevations Created Date: 04/08/2023
File: A22-021-PL-011A - PROPOSED SECTIONS.pdf (0 kb) Description: Proposed Sections Created Date: 24/11/2023
File: A22-021-PL-010C - PROPOSED ELEVATIONS.pdf (0 kb) Description: Proposed Elevations Created Date: 01/02/2024
Location Plan
File: A22-021-PL-001A - LOCATION PLAN.pdf (0 kb) Description: Location Plan Created Date: 24/08/2023
Plans
File: A22-021-PL-012 - SPRINKLER TANK DETAILS.pdf (0 kb) Description: Proposed Sprinkler Tank Details Created Date: 04/08/2023
File: A22-021-PL-013 - EXTERNAL WORKS DETAILS.pdf (0 kb) Description: Cycle Shelter - Proposed External Works Details Created Date: 04/08/2023
File: External Lighting Assessment - 1941-ESC-00-ZZ-DR-E-2100 P1.pdf (0 kb) Description: External Lighting Layout Created Date: 04/08/2023
File: Landscape Proposals - 8175.ASP4.LSP_C.pdf (0 kb) Description: Landscape Strategy Plan Created Date: 21/09/2023
File: SBK-22-144-DR-C-532 P01 - EXISTING DRAINAGE.pdf (0 kb) Description: Existing Drainage Created Date: 15/01/2024
File: SBK-22-144-DR-C-530 P04 - CONCEPT DRAINAGE STRATEGY.pdf (0 kb) Description: Concept Drainage Strategy Created Date: 15/01/2024
File: SBK-22-144-DR-C-510 P05 - CONCEPT LEVELS STRATEGY.pdf (0 kb) Description: Concept Levels Strategy Created Date: 15/01/2024
File: SBK-22-144-DR-C-531 P01 - EXCEEDANCE FLOW ROUTE.pdf (0 kb) Description: Exceedance Flow Route Created Date: 15/01/2024
File: SBK-22-144-DR-C-533 P01 - SuDS Maintenance Access.pdf (0 kb) Description: SUDs Maintenance Access Created Date: 15/01/2024
File: SBK-22-144-DR-C-511 P04 - CONCEPT LEVELS SECTIONS.pdf (0 kb) Description: Concept Levels Sections Created Date: 15/01/2024
File: A22-021-PL-014B - PROPOSED GENERATOR SCREEN ELEVATIONS.pdf (0 kb) Description: Proposed Generator Screen Elevations Created Date: 01/02/2024
File: A22-021-PL-015C - PROPOSED SITE CONTEXT ELEVATIONS.pdf (0 kb) Description: Proposed Site Context Elevations Created Date: 01/02/2024
File: A22-021-PL-016B - PROPOSED STREET SCENE - SITE CONTEXT.pdf (0 kb) Description: Proposed Street Scene Created Date: 01/02/2024
Design & Access Statement
File: Design and Access Statement 22-021-DAS-01.pdf (0 kb) Description: Design And Access Statement Created Date: 04/08/2023
Planning Statement
File: FINAL HTP 231 - Capita Land - Welywn - planning statement - Rev 1_Redacted.pdf (0 kb) Description: Planning Statement Redacted Created Date: 21/09/2023
Consultee Response
File: Reply to client 12412023.pdf (0 kb) Description: Support - Hertfordshire Constabulary - attachment Created Date: 01/09/2023
File: Comments.pdf (0 kb) Description: Support - Hertfordshire Constabulary Created Date: 01/09/2023
File: LPA Reference_ 6_2023_1618_MAJ Skip to tabbed content No Comment (below threshold) Response.pdf (0 kb) Description: Comment - Active Travel England Created Date: 04/09/2023
File: 6_2023_1618_MAJ- Fire hydrants.pdf (0 kb) Description: Comment - HCC Water Officer Created Date: 04/09/2023
File: 3rd Party Planning Application - 6_2023_1618_MAJ.pdf (0 kb) Description: Comment- Thames Water Created Date: 12/09/2023
File: Ref_ 6_2023_1618_MAJ (JP) Planning Application Holding Objection.pdf (0 kb) Description: Objection- Cadent gas (holding objection) Created Date: 12/09/2023
File: cadent gas.pdf (0 kb) Description: Comment- Cadent gas Created Date: 14/09/2023
File: CAD_SP_SSW_22 _ feb 2023 (002).pdf (0 kb) Description: Comment- Cadent gas- attachment Created Date: 14/09/2023
File: attachment 1 pdf.pdf (0 kb) Description: Comment- Cadent gas- attachment 2 Created Date: 14/09/2023
File: attachment 2 pdf.pdf (0 kb) Description: Comment- Cadent gas- attachment 3 Created Date: 14/09/2023
File: attachment 3.pdf (0 kb) Description: Comment- Cadent gas- attachment 4 Created Date: 14/09/2023
File: Response_6-2023-1618-MAJ (002).pdf (0 kb) Description: Comment- HCC Highways Created Date: 15/09/2023
File: 620231618MAJ_18092023.pdf (0 kb) Description: Comments - Affinity Water Created Date: 19/09/2023
File: 620231618MAJ_HERef_P01565308_L435935_Redacted.pdf (0 kb) Description: Comment- Histoc England Redacted Created Date: 21/09/2023
File: WK140777 - Hertfordshire Data Centre.pdf (0 kb) Description: Conditional Response- Public Health & Protection- WK140777 - Hertfordshire Data Centre.pdf Created Date: 21/09/2023
File: Comments(1).pdf (0 kb) Description: Conditional Response- Public Health and Protection - WHBC - Public Health and Protection Created Date: 21/09/2023
File: 6_2023_1618_MAJ Hertfordshire Data Centre Mundells Welwyn Garden City.pdf (0 kb) Description: Comment- Conservation Officer- Plave Services- Built Heritage Advice Created Date: 22/09/2023
File: Comments(2).pdf (0 kb) Description: Comment-Conservation Officer - Place Services Created Date: 22/09/2023
File: LPA Reference_ 6_2023_1618_MAJ No Comment (below threshold) Response.pdf (0 kb) Description: Comment- Active England Created Date: 22/09/2023
File: W_HERef_P01565308_436029_620231618MAJ_Redacted.pdf (0 kb) Description: Comment - Historic England - redacted Created Date: 25/09/2023
File: Response_6-2023-1618-MAJ (26-9-23).pdf (0 kb) Description: Comments - HCC Highways Created Date: 26/09/2023
File: Comments(3).pdf (0 kb) Description: Comment - WHBC - Client Services Created Date: 02/10/2023
File: NE Response - 451615 (002).pdf (0 kb) Description: Comments - Natural England Created Date: 19/10/2023
File: 6 2023 1618 MAJ - 2023-19-24.pdf (0 kb) Description: Comment- HCC Minerals and Waste Created Date: 24/10/2023
File: 6-23-1618-1.pdf (0 kb) Description: Comment- HCC Historic Environment Advisor Created Date: 30/10/2023
File: Herts Data Centre Welwyn AL7 1GE (6-2023-1618-MAJ).pdf (0 kb) Description: Comment- Herts Ecology Created Date: 23/11/2023
File: From_Redacted(1).pdf (0 kb) Description: Comment- Thames Water Redacted Created Date: 27/11/2023
File: 620231618MAJ_HERef_P01565308_D185316 (002).pdf (0 kb) Description: Comment- Historic England Created Date: 27/11/2023
File: LPA Reference_ 6_2023_1618_MAJ No Comment Response.pdf (0 kb) Description: Comment- Active Travel England Created Date: 01/12/2023
File: 136130-02.pdf (0 kb) Description: Comment - Environment Agency Created Date: 04/12/2023
File: 620231618MAJ_04122023.pdf (0 kb) Description: Comment - Affinity Water Created Date: 04/12/2023
File: NE Response - 451615.pdf (0 kb) Description: Comment - Natural England Created Date: 14/12/2023
File: 6-2023-1618-MAJ - LLFA Technical response - 18.12.2023.pdf (0 kb) Description: Objection - Lead Local Flood Authority - Technical response Created Date: 18/12/2023
File: 6-2023-1618-MAJ - LLFA letter - 18.12.2023.pdf (0 kb) Description: Objection - Lead Local Flood Authority - Letter Created Date: 18/12/2023
File: Herts Data Centre Welwyn AL7 1GE (6-2023-1618-MAJ)(2).pdf (0 kb) Description: Comment- Herts Ecology Created Date: 08/01/2024
File: Comments(4).pdf (0 kb) Description: Comment - Hertfordshire Constabulary Created Date: 24/01/2024
File: 620231618MAJ_HERef_P01565308_D187993_Redacted.pdf (0 kb) Description: Comment - Historic England - redacted Created Date: 24/01/2024
File: Herts Data Centre Welwyn AL7 1GE (6-2023-1618-MAJ)(3).pdf (0 kb) Description: Comment - Hetfordshire Ecology Created Date: 25/01/2024
File: 136130-04_Redacted.pdf (0 kb) Description: Comment - Environment Agency - redacted Created Date: 25/01/2024
File: LPA Reference_ 6_2023_1618_MAJ No Comment (below threshold) Response(1).pdf (0 kb) Description: Comment- Active England Created Date: 30/01/2024
File: Original Message_Redacted.pdf (0 kb) Description: Comment Thames Water Redacted Created Date: 30/01/2024
File: NE RESPONSE - 465117 6_2023_1618_MAJ_Redacted.pdf (0 kb) Description: Comment- Natural England - Redacted Created Date: 02/02/2024
File: 6-2023-1618-MAJ - LLFA 12.02.2024.pdf (0 kb) Description: Comment- LLFA Created Date: 12/02/2024
File: 6-2023-1618-MAJ - LLFA 12.02.2024(1).pdf (0 kb) Description: Comment- Hertfordshire County Council Created Date: 15/02/2024
File: 6-23-1618-2.pdf (0 kb) Description: Comment- Historic Environment Advisor Created Date: 26/06/2024
Neighbour Representation - Without Personal Information
File: Unit 2, Sterling Court, Mundells, Welwyn Garden City, AL7 1FT Objection 01-10-2023-Redacted.pdf (0 kb) Description: Objection - Unit 2 Sterling Court Mundells Welwyn Garden City AL7 1FT -Redacted Created Date: 01/10/2023
Legal Agreement
File: Mundells S106_Redacted(1).pdf (0 kb) Description: S106 - 2nd July 2024 - redacted Created Date: 12/11/2024
Decision Notice PDF
File: Decision Notice_620231618MAJ.pdf (0 kb) Description: Decision Notice Created Date: 02/07/2024
Officer Report PDF
File: Delegated Report_620231618MAJ(5).pdf (0 kb) Description: Delegated Report Created Date: 02/07/2024
Application Documents
File: A22-021-PL-018B - LIFE SAFETY GENERATOR DETAILS.pdf (0 kb) Description: Proposed Life Safety Generator Details Created Date: 01/02/2024
Air Quality Statement
File: 100654[00] Air Quality Assessment - Final.pdf (0 kb) Description: Air Quality Assessment Created Date: 19/09/2023
Flood Impact Assessment
File: Drainage Strategy and FRA - SBK-22-144-RP-C-01 P03 - FRA_Redacted.pdf (0 kb) Description: Drainage Strategy & Framework Redacted Created Date: 21/09/2023
Land Contamination Assessment
File: AG3508-23-AQ51-Issue 2_Redacted.pdf (0 kb) Description: Desk Study Report Redacted Created Date: 07/08/2023
Noise Impact Assessment
File: 100654[00] Noise Assessment - Final.pdf (0 kb) Description: Noise Assessment Created Date: 19/09/2023
Roof Plans
File: A22-021-PL-008A - PROPOSED ROOF GA PLAN.pdf (0 kb) Description: Proposed Roof Plan Created Date: 24/11/2023
Site Notice
File: Site Notice_620231618MAJ.pdf (0 kb) Description: Site Notice Created Date: 04/09/2023
Superseded Plans
File: A22-021-PL-003 - PROPOSED SITE PLAN.pdf (0 kb) Description: Proposed Site Plan Created Date: 04/08/2023
File: A22-021-PL-008 - PROPOSED ROOF GA PLAN.pdf (0 kb) Description: Proposed Roof Plan Created Date: 04/08/2023
File: A22-021-PL-010 - PROPOSED ELEVATIONS.pdf (0 kb) Description: Proposed Elevations Created Date: 04/08/2023
File: A22-021-PL-011 - PROPOSED SECTIONS.pdf (0 kb) Description: Proposed Sections Created Date: 04/08/2023
File: A22-021-PL-014 - PROPOSED GENERATOR SCREEN ELEVATIONS.pdf (0 kb) Description: Proposed Generator Screen Elevations Created Date: 04/08/2023
File: A22-021-PL-015 - PROPOSED SITE CONTEXT ELEVATIONS.pdf (0 kb) Description: Proposed Site Context Elevations Created Date: 04/08/2023
File: A22-021-PL-003A - PROPOSED SITE PLAN.pdf (0 kb) Description: Proposed Site Plan Created Date: 24/08/2023
File: A22-021-PL-010A - PROPOSED ELEVATIONS.pdf (0 kb) Description: Proposed Elevations Created Date: 24/11/2023
File: A22-021-PL-016 - PROPOSED STREET SCENE.pdf (0 kb) Description: Proposed Street Scene Created Date: 04/12/2023
File: A22-021-PL-010B - PROPOSED ELEVATIONS.pdf (0 kb) Description: Proposed Elevations Created Date: 18/01/2024
File: A22-021-PL-014A - PROPOSED GENERATOR SCREEN ELEVATIONS.pdf (0 kb) Description: Proposed Generator Screen Elevations Created Date: 18/01/2024
File: A22-021-PL-015A - PROPOSED SITE CONTEXT ELEVATIONS.pdf (0 kb) Description: Proposed Site Context Elevations Created Date: 18/01/2024
File: A22-021-PL-016A - PROPOSED STREET SCENE - SITE CONTEXT.pdf (0 kb) Description: Proposed Street Scene Created Date: 18/01/2024
File: A22-021-PL-018 - LIFE SAFETY GENERATOR DETAILS.pdf (0 kb) Description: Proposed Life Safety Generator Details Created Date: 18/01/2024
Supporting Information
File: BREEAM 2010 D.C. Pre-Assessment - 23.05.24 Rev A.pdf (0 kb) Description: Breeam 2010 NC Data Centre Pre Assessment Created Date: 04/08/2023
File: Demolition Statement - SF09-03-10 Main Method Statement_Redacted.pdf (0 kb) Description: Demolition Statement- Main Method Statement Redacted Created Date: 04/08/2023
File: Landscape Visual Assessment - 8175.LVA.002.DV (1)_Redacted.pdf (0 kb) Description: Landscape Proposals Redacted Created Date: 04/08/2023
File: 230824 J327291 TA 001 Rev B_Redacted.pdf (0 kb) Description: Transport Assessment Redacted Created Date: 19/09/2023
File: 2347 HW23 Welwyn Data Centre Welwyn Garden City Herts DBA_Redacted.pdf (0 kb) Description: Archaeological Desk Based Assessment Redacted Created Date: 21/09/2023
File: Arboricultural Impact Assessment - 11697_AIA.001 Rev A_Redacted.pdf (0 kb) Description: Aboricultural Impact Assessment Redacted Created Date: 21/09/2023
File: Landscape Visual Assessment - 8175.LVA.003.DV (1)_Redacted.pdf (0 kb) Description: Landscape & Visual Assessment Redacted Created Date: 21/09/2023
File: Utilities Review - 1941-ESC-00-ZZ-RP-Z-0016 - 20230831_Redacted.pdf (0 kb) Description: Utilities Review Redacted Created Date: 21/09/2023
File: Ecological Appraisal - 11630 EcoApp Final-RevA-Issued.pdf (0 kb) Description: Ecological Appraisal Created Date: 14/11/2023
File: 11630 - 4.0 BNG Metric - Rev C - CH - 24.07.23.xlsx (0 kb) Description: Metric Table Excel Created Date: 14/11/2023
File: 11630 EcoApp Rev B - Issued (002)_Redacted.pdf (0 kb) Description: Ecological Appraisal Dec 2023 Redacted Created Date: 05/12/2023
File: 2024-01-11 - STORM WATER NETWORK.pdf (0 kb) Description: Storm Water Network Document 3 Created Date: 15/01/2024
File: 2024-01-11 - Half Drain Times.pdf (0 kb) Description: Half Drain Times Created Date: 15/01/2024
File: SBK-22-144-RP-C-01 P04 - FRA_Redacted.pdf (0 kb) Description: Flood Risk Assessment & Sustainable Drainage Strategy Redacted Created Date: 15/01/2024
File: 2024-01-12 - SBK Response to LLFA Comments dated 18.12.2023.pdf (0 kb) Description: Notes on Response to Formal LLFA Comments Created Date: 15/01/2024
File: 2024-01-11 - STORM WATER NETWORK - 3.33.pdf (0 kb) Description: Storm Water Network Document 1 Created Date: 15/01/2024
File: 2024-01-11 - STORM WATER NETWORK - 6 hour.pdf (0 kb) Description: Storm Water Network Document 2 Created Date: 15/01/2024
Travel Plan
File: Framework Travel Plan - 230825 J327291 FTP 001 Rev B.pdf (0 kb) Description: Workplace Travel Plan Created Date: 21/09/2023
Organisation Name Sent Reply Due Reply Received
Hertfordshire County Council - Rights of Way North 31/08/2023 21/09/2023
Active Travel England 31/08/2023 21/09/2023 04/09/2023
UK Power Networks 31/08/2023 21/09/2023
UK Power Networks 21/09/2023 01/10/2023
Hertfordshire County Council - Rights of Way North 21/09/2023 01/10/2023
Active Travel England 21/09/2023 01/10/2023 22/09/2023
UK Power Networks 24/11/2023 04/12/2023
Hertfordshire County Council - Rights of Way North 24/11/2023 04/12/2023
Active Travel England 24/11/2023 04/12/2023
UK Power Networks 23/01/2024 02/02/2024
Hertfordshire County Council - Rights of Way North 23/01/2024 02/02/2024
Active Travel England 23/01/2024 02/02/2024
UK Power Networks 02/07/2024
Hertfordshire County Council - Rights of Way North 02/07/2024
Active Travel England 02/07/2024
Herts & Middlesex Wildlife Trust 02/07/2024
Herts & Middlesex Wildlife Trust 23/01/2024 02/02/2024
Herts & Middlesex Wildlife Trust 24/11/2023 04/12/2023
Herts & Middlesex Wildlife Trust 21/09/2023 01/10/2023
Herts & Middlesex Wildlife Trust 31/08/2023 21/09/2023
Place Services Conservation Officer 31/08/2023 21/09/2023 22/09/2023
Place Services Conservation Officer 21/09/2023 01/10/2023
Place Services Conservation Officer 24/11/2023 04/12/2023
Place Services Conservation Officer 23/01/2024 02/02/2024
Place Services Conservation Officer 02/07/2024
Natural England Consultation Service 02/07/2024
Natural England Consultation Service 23/01/2024 02/02/2024
Natural England Consultation Service 24/11/2023 04/12/2023 14/12/2023
Natural England Consultation Service 21/09/2023 01/10/2023 19/10/2023
Natural England Consultation Service 31/08/2023 21/09/2023
Welwyn Hatfield Borough Council Councillor Alastair Hellyer 31/08/2023 21/09/2023
Welwyn Hatfield Borough Council Councillor Alastair Hellyer 21/09/2023 01/10/2023
Welwyn Hatfield Borough Council Councillor Alastair Hellyer 24/11/2023 04/12/2023
Welwyn Hatfield Borough Council Councillor Alastair Hellyer 23/01/2024 02/02/2024
Welwyn Hatfield Borough Council Councillor Alastair Hellyer 02/07/2024
Welwyn Hatfield Borough Council Councillor Astrid Scott 02/07/2024
Welwyn Hatfield Borough Council Councillor Astrid Scott 23/01/2024 02/02/2024
Welwyn Hatfield Borough Council Councillor Astrid Scott 24/11/2023 04/12/2023
Welwyn Hatfield Borough Council Councillor Astrid Scott 21/09/2023 01/10/2023
Welwyn Hatfield Borough Council Councillor Astrid Scott 31/08/2023 21/09/2023
Welwyn Hatfield Borough Council Councillor Lucy Musk 31/08/2023 21/09/2023
Welwyn Hatfield Borough Council Councillor Lucy Musk 21/09/2023 01/10/2023
Welwyn Hatfield Borough Council Councillor Lucy Musk 24/11/2023 04/12/2023
Welwyn Hatfield Borough Council Councillor Lucy Musk 23/01/2024 02/02/2024
Welwyn Hatfield Borough Council Councillor Lucy Musk 02/07/2024
HCC - Rights of Way (South) Dawn West 02/07/2024
HCC - Rights of Way (South) Dawn West 23/01/2024 02/02/2024
HCC - Rights of Way (South) Dawn West 24/11/2023 04/12/2023
HCC - Rights of Way (South) Dawn West 21/09/2023 01/10/2023
HCC - Rights of Way (South) Dawn West 31/08/2023 21/09/2023
Welwyn Hatfield Borough Council Economic Development 31/08/2023 21/09/2023
Welwyn Hatfield Borough Council Economic Development 21/09/2023 01/10/2023
Welwyn Hatfield Borough Council Economic Development 24/11/2023 04/12/2023
Welwyn Hatfield Borough Council Economic Development 23/01/2024 02/02/2024
Welwyn Hatfield Borough Council Economic Development 02/07/2024
Hertfordshire County Council Emma Chapman - Spatial Planning & Economy Team 02/07/2024
Hertfordshire County Council Emma Chapman - Spatial Planning & Economy Team 23/01/2024 02/02/2024
Hertfordshire County Council Emma Chapman - Spatial Planning & Economy Team 24/11/2023 04/12/2023
Hertfordshire County Council Emma Chapman - Spatial Planning & Economy Team 21/09/2023 01/10/2023
Hertfordshire County Council Emma Chapman - Spatial Planning & Economy Team 31/08/2023 21/09/2023
Lead Local Flood Authority Fiona Lai 31/08/2023 21/09/2023
Lead Local Flood Authority Fiona Lai 21/09/2023 01/10/2023
Lead Local Flood Authority Fiona Lai 24/11/2023 04/12/2023 18/12/2023
Lead Local Flood Authority Fiona Lai 15/01/2024 05/02/2024
Lead Local Flood Authority Fiona Lai 23/01/2024 02/02/2024
Lead Local Flood Authority Fiona Lai 02/07/2024
Hertfordshire Constabulary Gerry Brophy 02/07/2024
Hertfordshire Constabulary Gerry Brophy 23/01/2024 02/02/2024 24/01/2024
Hertfordshire Constabulary Gerry Brophy 24/11/2023 04/12/2023
Hertfordshire Constabulary Gerry Brophy 21/09/2023 01/10/2023
Hertfordshire Constabulary Gerry Brophy 31/08/2023 21/09/2023 01/09/2023
Hertfordshire County Council HCC Minerals and Waste Team 31/08/2023 21/09/2023
Hertfordshire County Council HCC Minerals and Waste Team 21/09/2023 01/10/2023 24/10/2023
Hertfordshire County Council HCC Minerals and Waste Team 24/11/2023 04/12/2023
Hertfordshire County Council HCC Minerals and Waste Team 23/01/2024 02/02/2024
Hertfordshire County Council HCC Minerals and Waste Team 02/07/2024
Hertfordshire Fire and Rescue Service HCC Water Officer 02/07/2024
Hertfordshire Fire and Rescue Service HCC Water Officer 23/01/2024 02/02/2024
Hertfordshire Fire and Rescue Service HCC Water Officer 24/11/2023 04/12/2023
Hertfordshire Fire and Rescue Service HCC Water Officer 21/09/2023 01/10/2023
Hertfordshire Fire and Rescue Service HCC Water Officer 31/08/2023 21/09/2023 04/09/2023
Hertfordshire County Council Hertfordshire Transport Programmes & Strategy 31/08/2023 21/09/2023 15/09/2023
Hertfordshire County Council Hertfordshire Transport Programmes & Strategy 22/09/2023 02/10/2023 26/09/2023
Hertfordshire County Council Hertfordshire Transport Programmes & Strategy 21/09/2023 01/10/2023
Hertfordshire County Council Hertfordshire Transport Programmes & Strategy 24/11/2023 04/12/2023
Hertfordshire County Council Hertfordshire Transport Programmes & Strategy 23/01/2024 02/02/2024
Hertfordshire County Council Hertfordshire Transport Programmes & Strategy 02/07/2024
Hertfordshire County Council Historic Environment Advisor 02/07/2024
Hertfordshire County Council Historic Environment Advisor 23/01/2024 02/02/2024
Hertfordshire County Council Historic Environment Advisor 24/11/2023 04/12/2023
Hertfordshire County Council Historic Environment Advisor 21/09/2023 01/10/2023
Hertfordshire County Council Historic Environment Advisor 31/08/2023 21/09/2023
The Ramblers' Association Ian Hardy 31/08/2023 21/09/2023
The Ramblers' Association Ian Hardy 21/09/2023 01/10/2023
The Ramblers' Association Ian Hardy 24/11/2023 04/12/2023
The Ramblers' Association Ian Hardy 23/01/2024 02/02/2024
The Ramblers' Association Ian Hardy 02/07/2024
Welwyn Hatfield Borough Council Landscapes Department 02/07/2024
Welwyn Hatfield Borough Council Landscapes Department 23/01/2024 02/02/2024
Welwyn Hatfield Borough Council Landscapes Department 24/11/2023 04/12/2023
Welwyn Hatfield Borough Council Landscapes Department 21/09/2023 01/10/2023
Welwyn Hatfield Borough Council Landscapes Department 31/08/2023 21/09/2023
WHBC - Client Services Lorraine Davis 21/09/2023 01/10/2023
WHBC - Client Services Lorraine Davis 31/08/2023 21/09/2023 02/10/2023
WHBC - Client Services Lorraine Davis 24/11/2023 04/12/2023
WHBC - Client Services Lorraine Davis 23/01/2024 02/02/2024
WHBC - Client Services Lorraine Davis 02/07/2024
Hertfordshire Ecology Martin Hicks 02/07/2024
Hertfordshire Ecology Martin Hicks 23/01/2024 02/02/2024 24/01/2024
Hertfordshire Ecology Martin Hicks 05/12/2023 26/12/2023
Hertfordshire Ecology Martin Hicks 24/11/2023 04/12/2023 08/01/2024
Hertfordshire Ecology Martin Hicks 14/11/2023 24/11/2023
Hertfordshire Ecology Martin Hicks 21/09/2023 01/10/2023
Hertfordshire Ecology Martin Hicks 31/08/2023 21/09/2023
Cadent Gas Limited Mr S Carter 31/08/2023 21/09/2023 12/09/2023
Cadent Gas Limited Mr S Carter 21/09/2023 01/10/2023
Cadent Gas Limited Mr S Carter 24/11/2023 04/12/2023
Cadent Gas Limited Mr S Carter 23/01/2024 02/02/2024
Cadent Gas Limited Mr S Carter 02/07/2024
Environment Agency Natasha Smith 02/07/2024
Environment Agency Natasha Smith 23/01/2024 02/02/2024 25/01/2024
Environment Agency Natasha Smith 21/09/2023 01/10/2023
Environment Agency Natasha Smith 24/11/2023 04/12/2023 04/12/2023
Environment Agency Natasha Smith 31/08/2023 21/09/2023
Thames Water, Development Control Nicky McHugh 31/08/2023 21/09/2023 12/09/2023
Thames Water, Development Control Nicky McHugh 21/09/2023 01/10/2023
Thames Water, Development Control Nicky McHugh 24/11/2023 04/12/2023
Thames Water, Development Control Nicky McHugh 23/01/2024 02/02/2024
Thames Water, Development Control Nicky McHugh 02/07/2024
Welwyn Hatfield Borough Council Parking Services 02/07/2024
Welwyn Hatfield Borough Council Parking Services 23/01/2024 02/02/2024
Welwyn Hatfield Borough Council Parking Services 24/11/2023 04/12/2023
Welwyn Hatfield Borough Council Parking Services 21/09/2023 01/10/2023
Welwyn Hatfield Borough Council Parking Services 31/08/2023 21/09/2023
Welwyn Hatfield Borough Council Planning Policy 31/08/2023 21/09/2023 15/03/2024
Welwyn Hatfield Borough Council Planning Policy 21/09/2023 01/10/2023 15/03/2024
Welwyn Hatfield Borough Council Planning Policy 24/11/2023 04/12/2023 15/03/2024
Welwyn Hatfield Borough Council Planning Policy 23/01/2024 02/02/2024
Welwyn Hatfield Borough Council Planning Policy 02/07/2024
Affinity Water Ltd Planning Team 02/07/2024
Affinity Water Ltd Planning Team 23/01/2024 02/02/2024 15/03/2024
Affinity Water Ltd Planning Team 24/11/2023 04/12/2023 04/12/2023
Affinity Water Ltd Planning Team 21/09/2023 01/10/2023
Affinity Water Ltd Planning Team 31/08/2023 21/09/2023 18/09/2023
WHBC - Public Health and Protection Public Health and Protection 31/08/2023 21/09/2023
WHBC - Public Health and Protection Public Health and Protection 19/09/2023 29/09/2023 21/09/2023
WHBC - Public Health and Protection Public Health and Protection 21/09/2023 01/10/2023
WHBC - Public Health and Protection Public Health and Protection 23/01/2024 02/02/2024
WHBC - Public Health and Protection Public Health and Protection 24/11/2023 04/12/2023
WHBC - Public Health and Protection Public Health and Protection 02/07/2024
Historic England Tom Goodman 02/07/2024
Historic England Tom Goodman 23/01/2024 02/02/2024 24/01/2024
Historic England Tom Goodman 21/09/2023 01/10/2023
Historic England Tom Goodman 31/08/2023 21/09/2023
Historic England Tom Goodman 24/11/2023 04/12/2023 27/11/2023
Welwyn Garden Heritage Trust Tony Skottowe 21/09/2023 01/10/2023
Welwyn Garden Heritage Trust Tony Skottowe 31/08/2023 21/09/2023
Welwyn Garden Heritage Trust Tony Skottowe 24/11/2023 04/12/2023
Welwyn Garden Heritage Trust Tony Skottowe 23/01/2024 02/02/2024
Welwyn Garden Heritage Trust Tony Skottowe 02/07/2024
Address Date Sent Expiry Date Date Reconsulted Reconsult Expiry Date
1 Mundells Court Welwyn Garden City AL7 1EN 31/08/2023 21/09/2023 23/01/2024 02/02/2024
10 Mundells Court Welwyn Garden City AL7 1EN 31/08/2023 21/09/2023 23/01/2024 02/02/2024
11 Mundells Court Welwyn Garden City AL7 1EN 31/08/2023 21/09/2023 23/01/2024 02/02/2024
2 Mundells Court Welwyn Garden City AL7 1EN 31/08/2023 21/09/2023 23/01/2024 02/02/2024
3 Mundells Court Welwyn Garden City AL7 1EN 31/08/2023 21/09/2023 23/01/2024 02/02/2024
4 Mundells Court Welwyn Garden City AL7 1EN 31/08/2023 21/09/2023 23/01/2024 02/02/2024
5 Mundells Court Welwyn Garden City AL7 1EN 31/08/2023 21/09/2023 23/01/2024 02/02/2024
9 Mundells Court Welwyn Garden City AL7 1EN 31/08/2023 21/09/2023 23/01/2024 02/02/2024
Hertfordshire Business Services Mundells Welwyn Garden City AL7 1FT 31/08/2023 21/09/2023 23/01/2024 02/02/2024
Unit 1 Quadrant Park Mundells Welwyn Garden City AL7 1FS 31/08/2023 21/09/2023 23/01/2024 02/02/2024
Unit 2 Quadrant Park Mundells Welwyn Garden City AL7 1FS 31/08/2023 21/09/2023 23/01/2024 02/02/2024
Unit 3 Quadrant Park Mundells Welwyn Garden City AL7 1FS 31/08/2023 21/09/2023 23/01/2024 02/02/2024
Unit 4 Quadrant Park Mundells Welwyn Garden City AL7 1FS 31/08/2023 21/09/2023 23/01/2024 02/02/2024
Unit 5 Quadrant Park Mundells Welwyn Garden City AL7 1FS 31/08/2023 21/09/2023 23/01/2024 02/02/2024
Unit 6 Quadrant Park Mundells Welwyn Garden City AL7 1FS 31/08/2023 21/09/2023 23/01/2024 02/02/2024
Unit 7 Quadrant Park Mundells Welwyn Garden City AL7 1FS 31/08/2023 21/09/2023 23/01/2024 02/02/2024
Unit 8 Quadrant Park Mundells Welwyn Garden City AL7 1FS 31/08/2023 21/09/2023 23/01/2024 02/02/2024
Unit 9 Quadrant Park Mundells Welwyn Garden City AL7 1FS 31/08/2023 21/09/2023 23/01/2024 02/02/2024
Unit 10 Quadrant Park Mundells Welwyn Garden City AL7 1FS 31/08/2023 21/09/2023 23/01/2024 02/02/2024
Unit 11 Quadrant Park Mundells Welwyn Garden City AL7 1FS 31/08/2023 21/09/2023 23/01/2024 02/02/2024
6-7 Mundells Court Welwyn Garden City AL7 1EN 31/08/2023 21/09/2023 23/01/2024 02/02/2024
The Management Suite Bellmont Lodge Mundells Welwyn Garden City AL7 1FX 31/08/2023 21/09/2023 23/01/2024 02/02/2024
1 Bellmont Lodge Mundells Welwyn Garden City AL7 1FX 31/08/2023 21/09/2023 23/01/2024 02/02/2024
2 Bellmont Lodge Mundells Welwyn Garden City AL7 1FX 31/08/2023 21/09/2023 23/01/2024 02/02/2024
3 Bellmont Lodge Mundells Welwyn Garden City AL7 1FX 31/08/2023 21/09/2023 23/01/2024 02/02/2024
4 Bellmont Lodge Mundells Welwyn Garden City AL7 1FX 31/08/2023 21/09/2023 23/01/2024 02/02/2024
5 Bellmont Lodge Mundells Welwyn Garden City AL7 1FX 31/08/2023 21/09/2023 23/01/2024 02/02/2024
6 Bellmont Lodge Mundells Welwyn Garden City AL7 1FX 31/08/2023 21/09/2023 23/01/2024 02/02/2024
7 Bellmont Lodge Mundells Welwyn Garden City AL7 1FX 31/08/2023 21/09/2023 23/01/2024 02/02/2024
8 Bellmont Lodge Mundells Welwyn Garden City AL7 1FX 31/08/2023 21/09/2023 23/01/2024 02/02/2024
9 Bellmont Lodge Mundells Welwyn Garden City AL7 1FX 31/08/2023 21/09/2023 23/01/2024 02/02/2024
10 Bellmont Lodge Mundells Welwyn Garden City AL7 1FX 31/08/2023 21/09/2023 23/01/2024 02/02/2024
11 Bellmont Lodge Mundells Welwyn Garden City AL7 1FX 31/08/2023 21/09/2023 23/01/2024 02/02/2024
12 Bellmont Lodge Mundells Welwyn Garden City AL7 1FX 31/08/2023 21/09/2023 23/01/2024 02/02/2024
13 Bellmont Lodge Mundells Welwyn Garden City AL7 1FX 31/08/2023 21/09/2023 23/01/2024 02/02/2024
14 Bellmont Lodge Mundells Welwyn Garden City AL7 1FX 31/08/2023 21/09/2023 23/01/2024 02/02/2024
15 Bellmont Lodge Mundells Welwyn Garden City AL7 1FX 31/08/2023 21/09/2023 23/01/2024 02/02/2024
16 Bellmont Lodge Mundells Welwyn Garden City AL7 1FX 31/08/2023 21/09/2023 23/01/2024 02/02/2024
17 Bellmont Lodge Mundells Welwyn Garden City AL7 1FX 31/08/2023 21/09/2023 23/01/2024 02/02/2024
18 Bellmont Lodge Mundells Welwyn Garden City AL7 1FX 31/08/2023 21/09/2023 23/01/2024 02/02/2024
19 Bellmont Lodge Mundells Welwyn Garden City AL7 1FX 31/08/2023 21/09/2023 23/01/2024 02/02/2024
20 Bellmont Lodge Mundells Welwyn Garden City AL7 1FX 31/08/2023 21/09/2023 23/01/2024 02/02/2024
21 Bellmont Lodge Mundells Welwyn Garden City AL7 1FX 31/08/2023 21/09/2023 23/01/2024 02/02/2024
22 Bellmont Lodge Mundells Welwyn Garden City AL7 1FX 31/08/2023 21/09/2023 23/01/2024 02/02/2024
23 Bellmont Lodge Mundells Welwyn Garden City AL7 1FX 31/08/2023 21/09/2023 23/01/2024 02/02/2024
24 Bellmont Lodge Mundells Welwyn Garden City AL7 1FX 31/08/2023 21/09/2023 23/01/2024 02/02/2024
25 Bellmont Lodge Mundells Welwyn Garden City AL7 1FX 31/08/2023 21/09/2023 23/01/2024 02/02/2024
26 Bellmont Lodge Mundells Welwyn Garden City AL7 1FX 31/08/2023 21/09/2023 23/01/2024 02/02/2024
28 Bellmont Lodge Mundells Welwyn Garden City AL7 1FX 31/08/2023 21/09/2023 23/01/2024 02/02/2024
29 Bellmont Lodge Mundells Welwyn Garden City AL7 1FX 31/08/2023 21/09/2023 23/01/2024 02/02/2024
30 Bellmont Lodge Mundells Welwyn Garden City AL7 1FX 31/08/2023 21/09/2023 23/01/2024 02/02/2024
31 Bellmont Lodge Mundells Welwyn Garden City AL7 1FX 31/08/2023 21/09/2023 23/01/2024 02/02/2024
32 Bellmont Lodge Mundells Welwyn Garden City AL7 1FX 31/08/2023 21/09/2023 23/01/2024 02/02/2024
33 Bellmont Lodge Mundells Welwyn Garden City AL7 1FX 31/08/2023 21/09/2023 23/01/2024 02/02/2024
34 Bellmont Lodge Mundells Welwyn Garden City AL7 1FX 31/08/2023 21/09/2023 23/01/2024 02/02/2024
35 Bellmont Lodge Mundells Welwyn Garden City AL7 1FX 31/08/2023 21/09/2023 23/01/2024 02/02/2024
36 Bellmont Lodge Mundells Welwyn Garden City AL7 1FX 31/08/2023 21/09/2023 23/01/2024 02/02/2024
37 Bellmont Lodge Mundells Welwyn Garden City AL7 1FX 31/08/2023 21/09/2023 23/01/2024 02/02/2024
38 Bellmont Lodge Mundells Welwyn Garden City AL7 1FX 31/08/2023 21/09/2023 23/01/2024 02/02/2024
39 Bellmont Lodge Mundells Welwyn Garden City AL7 1FX 31/08/2023 21/09/2023 23/01/2024 02/02/2024
40 Bellmont Lodge Mundells Welwyn Garden City AL7 1FX 31/08/2023 21/09/2023 23/01/2024 02/02/2024
41 Bellmont Lodge Mundells Welwyn Garden City AL7 1FX 31/08/2023 21/09/2023 23/01/2024 02/02/2024
42 Bellmont Lodge Mundells Welwyn Garden City AL7 1FX 31/08/2023 21/09/2023 23/01/2024 02/02/2024
43 Bellmont Lodge Mundells Welwyn Garden City AL7 1FX 31/08/2023 21/09/2023 23/01/2024 02/02/2024
44 Bellmont Lodge Mundells Welwyn Garden City AL7 1FX 31/08/2023 21/09/2023 23/01/2024 02/02/2024
45 Bellmont Lodge Mundells Welwyn Garden City AL7 1FX 31/08/2023 21/09/2023 23/01/2024 02/02/2024
46 Bellmont Lodge Mundells Welwyn Garden City AL7 1FX 31/08/2023 21/09/2023 23/01/2024 02/02/2024
47 Bellmont Lodge Mundells Welwyn Garden City AL7 1FX 31/08/2023 21/09/2023 23/01/2024 02/02/2024
Unit 2 Sterling Court Mundells Welwyn Garden City AL7 1FT 31/08/2023 21/09/2023 23/01/2024 02/02/2024
Application Number Proposal Decision Distance
6/2024/1482/COND Submission of details pursuant of condition 1 (Surface Water Management Plan), condition 2 (Demolition & Environmental Management Plan), condition 3 (Construction & Environment Management Plan (Ecology), condition 4 (Waste Management Plan) and condition 6 (Tree Protection Measures) on planning permission 6/2023/1618/MAJ Granted 0
6/2023/1570/EIA Request for a screening opinion in relation to a proposed replacement data centre Determined
767 (2018) for the continued amenity of the area following a review of the landscape. 0
C6/1987/7012/AD 3 illuminated signs and 1 non illuminated sign Granted 0
N6/2013/1104/FP Replacement gates Granted 0
N6/2007/0917/MA ERECTION OF DATA CENTRE WITH ANCILLARY OFFICE AND PLANT Approval Subject to s106 0
N6/2007/0182/MA ERECTION OF DATA CENTRE WITH ANCILLARY OFFICE AND PLANT Approval Subject to s106 0
N6/2006/1029/FP VARIATION OF CONDITION 1 (TIME LIMIT) OF PREVIOUS PLANNING PERMISSION N6/2002/862/FP Granted 0
N6/2002/0862/FP REDEVELOPMENT OF SITE; DEMOLITION OF ALL EXISTING BUILDINGS AND ERECTION OF NEW BUILDINGS FOR B2 AND/OR B8 PURPOSES, FORMATION OF PARKING AREAS AND LANDSCAPING Approval Subject to s106 0
N6/2000/1154/FP INSTALLATION OF SEVEN ADDITIONAL COMMUNICATION DISHES Granted 0
N6/2000/0542/FP THREE MICROWAVE DISHES TOGETHER WITH ANCILLARY DEVELOPMENT Granted 0
N6/1999/0047/FP Formation of telecommunications base station including installation of one 0.3 metre dish Granted 0
N6/1996/0405/FP Installation of two microwave dishes to an existing telecommunications position on roof Granted 0
N6/1993/0505/FP Retention of temporary portakabin for storage purposes (Renewal of planning permission Ref N6/0069/91/FP) Granted 0
N6/1993/0506/FP Continued temporary siting of a waste compactor (Renewal of planning permission Ref N6/0363/92/FP) Granted 0
N6/1992/0429/FP Erection of replacement 2.5 metre fencing Granted 0
N6/1992/0363/FP Temporary siting of waste compactor (renewal of consent N6/172/91/FP) Granted 0
N6/1991/0724/FP Erection of new goods inwards canopy Granted 0
N6/1991/0660/FP Decontamination shower building Granted 0
N6/1991/0172/FP Temporary siting of waste compactor Granted 0
N6/1991/0069/FP Renewal of planning permission for portakabin ref: C6/0582/86 Granted 0
N6/1990/0875/FP Erection of cradle systems Granted 0
N6/1989/7005/AD Illuminated signs Granted 0
C6/1988/0529/FP Single storey extension to laboratory Granted 0
C6/1987/0230/FP Extension to modular building for use as storage Granted 0
C6/1986/0582/FP Erection of a new storage cabin Granted 0
C6/1986/0161/ Construction of a store building mundells Granted 0
N6/1983/0145/ Fire escape staircase Granted 0
N6/1980/0301/ Extension to existing restaurant/dining room facilities Granted 0
N6/1977/0082/ Extension to existing cafeteria Granted 0
N6/1977/0567/ Extension to existing warehouse canopy Granted 0
N6/1977/0625/ Extension to provide a tablet production building Granted 0
N6/1976/0629/ Animal acommodation Granted 0
N6/1974/0502/ Sprinkler tank and chemical store Granted 0
N6/1974/0787/ Enclosure for existing alternator seat Granted 0

There are no NMAs associated with this application