Return to search results
-
Start a new search
- The consultation period for this application has now closed
Planning Application: S6/1997/0692/FP
FULL PERMISSION
|
Decided - Granted
|
|
|
University of Herts, College Lane, Hatfield
|
Installation of new external lighting masts to existing car parks
|
|
|
|
|
Hatfield
|
|
01/01/1997
|
11/08/1997
|
|
|
|
|
University of Hertfordshire, Estates Department
|
University of Hertfordshire, Estates Department
|
College Lane
Hatfield
|
College Lane
Hatfield
|
There are no constraints associated with this application
Granted
|
06/10/1997
|
06/10/1997
|
Delegated
|
|
There are no documents associated with this application
There are no consultees associated with this application
There are no neighbours associated with this application
Application Number | Proposal | Decision | Distance |
---|---|---|---|
S6/2015/1468/DS | Approval of details reserved by condition 3 (materials) of planning permission S6/2014/1902/FP - Erection of 2no Substations and associated landscaping | Granted | |
S6/2015/1380/FULL | Installation of timber fence, formation of footpath and associated landscaping works | Granted | |
S6/2015/1296/DS | Approval of details reserved by condition 3 (external materials schedule) of planning permission S6/2013/0435/MA - Erection of new science building, associated works and new service road | Granted | |
S6/2015/0847/DS | Approval of details reserved by condition 6 (drainage strategy), 7 (fowl water drainage) & 14 (flood risk assessment) of planning permission S6/2012/1928/FP | Granted | |
S6/2015/0102/DS | Approval of details reserved by condition 3 (materials), 4 (oil and petrol separators) and 5 (hard and soft landscaping) of planning permission S6/2014/1085/MA | Granted | |
S6/2014/1902/FP | Erection of 2no Substations and associated landscaping | Granted | |
S6/2014/2030/S73A | Variation of condition 24 (delivery of Energy Centre) of planning permission S6/2012/1928/PP - Demolition of existing student residences comprising 1059 bedspace (Roberts Way, Butler Hall, Fern Hall, Chapman Hall, Broad Hall and Coales Hall). Erection of 2511 new student bedrooms arranged in 21 accommodation buildings; retention and extension of existing Telford Court; Provision of social, administration, sports facilities (comprising sports pitch and multi-use games area); combined heat and power energy centre, and associated parking and landscaping | Withdrawn | |
S6/2014/2031/DS | Approval of details reserved by conditions 6 (drainage), 7 (foul water drainage) and 14 (surface water drainage) of planning permission S6/2012/1928/PP | Granted | |
S6/2014/1879/DS | Approval of details reserved by condition 8 (CCTV Installation) of planning permission S6/2012/1928/PP | Granted | |
S6/2014/1833/AD | Installation of one mesh banner sign | Granted | |
S6/2014/1678/DS | Approval of details reserved by condition 9 (archaeology evaluation) of planning permission S6/2012/1928/PP | Granted | |
S6/2014/1573/DS | Approval of details reserved by condition 6 (drainage) & 7 (foul water drainage) & 11 (acoustic report) & 14 (surface water drainage) of planning permision S6/2012/1928/OP | Granted | |
S6/2014/1470/NM | Non material amendment following approval of plnning permission S6/2012/1928/FP - Upper floors reduced from 3m to 2.775m, roof overhangs reduced, height of roof above accommodation reduced, corridors reduced in width and stepped pods shown to reduce GIFA, cladding panels to the side of the townhouse windows changed from timber cladding to metallic grey, hub first floor wall position amended to SE requirements and townhouse canopies omitted | Granted | |
S6/2014/0491/DS | Dischage of conditions 13 (Surface Water Drainage Scheme) and 14 (Drainage Strategy) of S6/2013/0435/MA | Granted | |
S6/2014/0038/DS | Discharge of Condition 7 (Construction Method Statement) S6/2013/0435/MA | Granted | |
S6/2012/1928/PP | Demolition of existing student residences comprising 1059 bedspace (Roberts Way, Butler Hall, Fern Hall, Chapman Hall, Broad Hall and Coales Hall). Erection of 2511 new student bedrooms arranged in 21 accommodation buildings; retention and extension of existing Telford Court; Provision of social, administration, sports facilities (comprising sports pitch and multi-use games area); combined heat and power energy centre, and associated parking and landscaping | Approval Subject to s106 | |
S6/2012/1181/MA | Alterations comprising refurbishment and extension to Prince Edward Hall to provide a new reception area and student/visitor cafe, refurbish and extension to the Hutton Building and Hutton Hall to accommodate the consolidation and co-location of staff and student facilities, including a new extension within the existing quadrant. Alterations to pedestrian routes and the landscaped setting of the buildings, including an improved heritage walkway linking these two focuses of activity (Comprising Phase 1 of the development identified in the University of Hertfordshire 2020 Estate Vision) | Granted | |
S6/2012/1022/FP | Installation of 2 wind turbines and 27 photovoltaic panels on roof | Granted | |
S6/2011/0702/FP | Extension to existing service yard and installation of 3 compactors and 1 bailer | Granted | |
S6/2011/0324/FP | Installation prototype/demonstrator single occupancy sustainable student residence unit | Granted | |
S6/2011/0242/MA | Erection of student accommodation comprising of 401 study bedrooms with en-suite shower rooms (including 10 disabled rooms) grouped in clusters (a total of 69) each with a kitchen/commercial lounge. The accommodation is located in 5 buildings; each block has a storey height of 5 storeys, plus lower ground floor level, creating 6 levels. Provision of 12 car parking spaces (10 for the disabled rooms) and 5 motorcycle spaces accessed via revised vehicular access from College Lane, together with the provision of secure cycle storage, private amenity space, hard and soft landscaping and new boundary treatment, all following demolition of 9 existing dwellings. The development will affect a public right of way. | Refused | |
S6/2010/1947/FP | Reorganisation and formalisation of existing waste compound comprising; removal of existing garage, hard surfacing of the compound, reconfiguration of existing storage containers and skips, erection of new fencing, new security hut, new fuel store, installation of waste compactor and associated landscaping | Granted | |
S6/2010/1559/FP | Alterations to include installation of door, ramp and railings and 3 windows | Granted | |
S6/2008/0890/MA | CONSTRUCTION OF PLANT ROOM | Granted |
There are no NMAs associated with this application