Return to search results
  -  
Start a new search
	  -   The consultation period for this application has now closed
	
		
			
	
		
	
	
		
				
	
	
	
		
			
	
		
	
	
		
				
	
	
		
				
	
	
		
				
	
	
		
	
		
		
	
	
		
				
	
	
                        
                    Planning Application: S6/1986/0354/FP
| 
		
			 
				FULL PERMISSION
			 
	 | 
		
	
		
			 
				Decided - Granted
			 
	 | 
	
| 
		
			 | 
		
	
		
			 | 
	
| 
		
			 
				A1001, near Travellers Lane, South Way, Hatfield
			 
	 | 
		
	
		
			 
				Erection of foot/cycle bridge
			 
	 | 
	
| 
	 | 
		
	 | 
	
| 
			 | 
		
			 | 
	
| 
		
			 | 
		
	
		
			 | 
	
| 
	
	 
		01/01/1986
	 
 | 
		
	
	 
		01/01/1986
	 
 | 
	
| 
	
	 | 
		
	
	 | 
	
| 
	
	 | 
	|
| 
		
			 | 
		
	
		
			 | 
	
| 
		
			 | 
		
	
		
			 | 
	
There are no constraints associated with this application
| 
		
			 
				Granted
			 
	 | 
		
	
	 
		03/07/1986
	 
 | 
	
| 
	
	 
		03/07/1986
	 
 | 
		
	
		
			 
				Delegated
			 
	 | 
	
| 
	
	 | 
	
There are no documents associated with this application
There are no consultees associated with this application
There are no neighbours associated with this application
| Application Number | Proposal | Decision | Distance | 
|---|---|---|---|
| 6/2023/1475/TPO | T2 - TPO385 T3- Reduce Hornbeam tree by about 30%, removing no more than 2.5 meters growth all round. T6 - TPO385 T2 - Lift the canopy of the Oak tree to about 3-4 meters and reduce back the lowest lateral limb overhanging the property by removing no more than 2 meters growth. T9 - TPO385 T1 - Remove the lowest 3 limbs of the Oak tree that overhang the carpark to lift the canopy to about 3-4 meters(Car park side only). | Granted | 0 | 
| S6/2011/2570/CD | Demolition of existing library and training buildings and construction and operation of a Recycling and Energy Recovery Facility (RERF) for the treatment of Municipal, Commercial and Industrial Wastes together with ancillary infrastructure, including bulking/transfer facilities, administration/visitor centre, landscaping, habitat creation, drainage and highway improvement works. RERF facility will comprise of (i) Mechanical Pre - Treatment (MPT) process for the further recovery of recyclables from incoming residual wastes and; (ii) an Energy Recovery Facility (ERF) for the remaining residual waste fraction | Objection | 
There are no NMAs associated with this application