Return to search results
-
Start a new search
- The consultation period for this application has now closed
Planning Application: S6/1985/0627/DE
DETAILED PERMISSION
|
Decided - Granted
|
|
|
Welham Green Depot, Marshmoor Sidings, Welham Green, Hatfield
|
Distribution centre and ancillary parking
|
|
|
|
|
|
|
01/01/1985
|
01/01/1985
|
|
|
|
|
|
|
|
|
There are no constraints associated with this application
Granted
|
22/11/1985
|
22/11/1985
|
Delegated
|
|
To download a selection of individual documents place a tick alongside each of the relevant rows and then click on Download selected files. To download all of the documents place a tick in the box alongside the header row and all of the files will be selected, then click on Download selected files. To view individual documents click on the File for the required row.
File | Description | Date Uploaded | |
---|---|---|---|
History | |||
File: 543244.pdf (1341 kb) | Description: Miscellaneous (DMS Info Document: 543244 Page No(s).: 1) | Created Date: 25/05/2011 | |
File: 543245.pdf (2729 kb) | Description: Miscellaneous (DMS Info Document: 543245 Page No(s).: 1) | Created Date: 25/05/2011 | |
File: 543246.pdf (1969 kb) | Description: Miscellaneous (DMS Info Document: 543246 Page No(s).: 1) | Created Date: 25/05/2011 | |
File: 543247.pdf (954 kb) | Description: Miscellaneous (DMS Info Document: 543247 Page No(s).: 1) | Created Date: 25/05/2011 |
There are no consultees associated with this application
There are no neighbours associated with this application
Application Number | Proposal | Decision | Distance |
---|---|---|---|
6/2020/1481/TELEC | Installation of 2 x BTS3900A cabinets adjacent to existing cabinets and associated ancillary works | No Information | 0 |
6/2018/1885/MAJ | Restructure of site entrance, installation of turnstile pedestrian entrance and erection of 2.4m boundary paladin fencing | Granted | |
6/2017/1613/MAJ | Erection of lightweight demountable structures for covered loading and storage areas | Granted | |
S6/2011/2570/CD | Demolition of existing library and training buildings and construction and operation of a Recycling and Energy Recovery Facility (RERF) for the treatment of Municipal, Commercial and Industrial Wastes together with ancillary infrastructure, including bulking/transfer facilities, administration/visitor centre, landscaping, habitat creation, drainage and highway improvement works. RERF facility will comprise of (i) Mechanical Pre - Treatment (MPT) process for the further recovery of recyclables from incoming residual wastes and; (ii) an Energy Recovery Facility (ERF) for the remaining residual waste fraction | Objection | |
1980/0002 | Residental caravan | Closed |
There are no NMAs associated with this application