Return to search results
-
Start a new search
- The consultation period for this application has now closed
Planning Application: N6/2014/0708/DS
DISCHARGE OF CONDITIONS
|
Decided - Split
|
Ms Rachael Collard
|
|
The Frythe, 5 Digswell Hill, Welwyn, AL6 9AR
|
Discharge of condition 9 (Phasing of development), 17 (Drainage), 18 (Piled Foundations), 21 (Flood Risk Assessment) and 23 (Overland flow routes) of planning permission N6/2012/1778/OP
|
522463
|
214977
|
|
|
|
200003856031
|
01/04/2014
|
01/04/2014
|
|
|
|
|
Mr R Weaver
|
Mr R Weaver
|
Linden Homes Chiltern
Linden House
Harefield
UB9 6TQ
|
Linden Homes Chiltern
Linden House
Harefield
UB9 6TQ
|
There are no constraints associated with this application
Part Approved / Part Refused
|
20/04/2015
|
20/04/2015
|
Delegated
|
|
To download a selection of individual documents place a tick alongside each of the relevant rows and then click on Download selected files. To download all of the documents place a tick in the box alongside the header row and all of the files will be selected, then click on Download selected files. To view individual documents click on the File for the required row.
File | Description | Date Uploaded | |
---|---|---|---|
Decision Notice PDF | |||
File: plan_rcol_02-12-2015_13-50-18.pdf (803 kb) | Description: Decision Letter 20/4/15 | Created Date: 02/12/2015 |
Organisation | Name | Sent | Reply Due | Reply Received |
---|---|---|---|---|
Environment Agency | Natasha Smith | 27/06/2014 | 18/07/2014 |
There are no neighbours associated with this application
Application Number | Proposal | Decision | Distance |
---|---|---|---|
N6/2012/1778/OP | Planning permission is sought for the provision of site access, central spine road and the local widening of the access road footway and means of perimeter enclosure. Outline permission is sought for up to 27,773sqm of new residential floorspace, excluding garages, (Use Class C3) (GEA) with a built footprint of up to 18,500sqm, providing up to 182 residential units of up to 3.5 residential storeys, together with the retention and conversion of the Frythe building providing up to 14 units (to provide a total of up to 196 units across the site), implementation of Sustainable Urban Drainage Systems and remodelling and ecological enhancements to the existing pond, service diversions and associated connections and ancillary structures, means of perimeter enclosure and associated structures, the laying out of footpaths and associated access points, bus infrastructure and car parking, provision of soft and hard landscape schemes, including the boundary buffer treatment, playspace and lighting | Approval Subject to s106 |
There are no NMAs associated with this application