Return to search results   -   Start a new search   -   The consultation period for this application has now closed

Planning Application: N6/2014/0706/DS




DISCHARGE OF CONDITIONS
Decided - Granted
Ms Rachael Collard
The Frythe, 5 Digswell Hill, Welwyn, AL6 9AR
Discharge of condition 6 (retention/protection of trees) of planning permission N6/2012/1778/OP
522463
214977


200003856031
01/04/2014
01/04/2014
Mr R Weaver
Mr R Weaver
Linden Homes Chiltern Linden House Harefield UB9 6TQ
Linden Homes Chiltern Linden House Harefield UB9 6TQ

There are no constraints associated with this application

Granted
27/01/2015
27/01/2015
Delegated

To download a selection of individual documents place a tick alongside each of the relevant rows and then click on Download selected files. To download all of the documents place a tick in the box alongside the header row and all of the files will be selected, then click on Download selected files. To view individual documents click on the File for the required row.

File Description Date Uploaded
Decision Notice
File: 01452217.pdf (66 kb) Description: WHBC Decision letter - 27 January 2015 (DMS Info Document: 863514 Page No(s).: 1) Created Date:
Organisation Name Sent Reply Due Reply Received
Welwyn Hatfield Borough Council Landscapes Department 24/04/2014 15/05/2014

There are no neighbours associated with this application

Application Number Proposal Decision Distance
N6/2012/1778/OP Planning permission is sought for the provision of site access, central spine road and the local widening of the access road footway and means of perimeter enclosure. Outline permission is sought for up to 27,773sqm of new residential floorspace, excluding garages, (Use Class C3) (GEA) with a built footprint of up to 18,500sqm, providing up to 182 residential units of up to 3.5 residential storeys, together with the retention and conversion of the Frythe building providing up to 14 units (to provide a total of up to 196 units across the site), implementation of Sustainable Urban Drainage Systems and remodelling and ecological enhancements to the existing pond, service diversions and associated connections and ancillary structures, means of perimeter enclosure and associated structures, the laying out of footpaths and associated access points, bus infrastructure and car parking, provision of soft and hard landscape schemes, including the boundary buffer treatment, playspace and lighting Approval Subject to s106

There are no NMAs associated with this application