Return to search results   -   Start a new search   -   The consultation period for this application has now closed

Planning Application: N6/2013/1994/DE




DETAILED PERMISSION
Decided - Granted
Mr D Manhertz
The Frythe, 5 Digswell Hill, Welwyn, AL6 9AR
Approval of reserved matters (access, appearance, landscaping, layout & scale) for residential development involving the erection of 24 houses (6 × 3 bedroom, 5 × 4 bedroom and 13 × 5 bedroom units) within phase 1 together with the discharge of conditions 9 and 26 of planning permission N6/2012/1778/OP
522463
214977

  • Welwyn West

  • Councillor Tony Kingsbury
  • Councillor Sunny Thusu
  • Councillor Alex Bardett
Welwyn
200003856031
24/09/2013
24/09/2013
06/11/2013
21/11/2013
Mr P Allin
Linden Wates (The Frythe) Ltd
Boyer Planning UK House Twickenham TW1 4BW
C/O Boyer Planning UK House Twickenham TW1 4BW

There are no constraints associated with this application

Granted
22/01/2014
22/01/2014
Delegated

To download a selection of individual documents place a tick alongside each of the relevant rows and then click on Download selected files. To download all of the documents place a tick in the box alongside the header row and all of the files will be selected, then click on Download selected files. To view individual documents click on the File for the required row.

File Description Date Uploaded
Plans
File: D2152.L.300-C.PDF (0 kb) Description: Plant Schedule Created Date: 20/04/2016
File: D2152.L.310--.PDF (0 kb) Description: Planting Plan Created Date: 20/04/2016
Design & Access Statement
File: 01347839.pdf (0 kb) Description: Miscellaneous (DMS Info Document: 783293 Page No(s).: 1) Created Date:
Consultee Response
File: 01353265.pdf (0 kb) Description: HEALTH AND SAFETY EXECUTIVE (DMS Info Document: 787913 Page No(s).: 1,2) Created Date:
File: 01354978.pdf (0 kb) Description: HERTS CONSTABULARY (DMS Info Document: 792246 Page No(s).: 1) Created Date:
File: 01354985.pdf (0 kb) Description: THAMES WATER (DMS Info Document: 792252 Page No(s).: 1,2) Created Date:
File: 01354990.pdf (0 kb) Description: ENVIRONMENT AGENCY (DMS Info Document: 792254 Page No(s).: 1,2,3) Created Date:
File: 01355014.pdf (0 kb) Description: OBJECT - J SHEAD 136 COLE GREEN LANE (DMS Info Document: 792271 Page No(s).: 1) Created Date: 22/10/2013
File: 01355861.pdf (0 kb) Description: OBJECT - S JUPP 1 NORTH RIDE (DMS Info Document: 792905 Page No(s).: 1) Created Date: 23/10/2013
File: 01356178.pdf (0 kb) Description: NATURAL ENGLAND (DMS Info Document: 793147 Page No(s).: 1,2,3,4,5) Created Date:
File: 01356685.pdf (0 kb) Description: Miscellaneous (DMS Info Document: 793487 Page No(s).: 1) Created Date:
File: 01356857.pdf (0 kb) Description: Miscellaneous (DMS Info Document: 793609 Page No(s).: 1,2) Created Date: 30/10/2013
File: 01366456.pdf (0 kb) Description: updated response - no objection to phase 1 but site wide condition cannot be discharge until further information is agreed (DMS Info Document: 799699 Page No(s).: 1) Created Date:
File: 01374541.msg (0 kb) Description: HCC Historic Environment Unit - 9 January 2014 (DMS Info Document: 804557 Page No(s).: 1) Created Date:
File: 01376807.pdf (0 kb) Description: HBRC comments 7 January 2014 (DMS Info Document: 806147 Page No(s).: 1) Created Date:
Officer Report
File: 2013-1994.pdf (0 kb) Description: Created Date: 24/02/2016
Amended Plans
File: PHASING PLAN - DRG NO. 2030 - A - 1007 REV A - DAT.PDF (0 kb) Description: PHASING PLAN - DRG NO. 2030 - A - 1007 REV A - DATED 24/09/13 (DMS Info Document: 783585 Page No(s).: 1) Created Date:
File: FLOOR PLANS AND ELEVATIONS - DRG NO. 2030 - A - 31.PDF (0 kb) Description: FLOOR PLANS AND ELEVATIONS - DRG NO. 2030 - A - 3121 REV F - DATED 24/09/13 (DMS Info Document: 783593 Page No(s).: 1) Created Date:
File: 2030-C-1122-D (STREET ELEVATIONS C & D) 27-11-13.PDF (0 kb) Description: 2030-C-1122-D (STREET ELEVATIONS C & D) 27/11/13 (DMS Info Document: 798258 Page No(s).: 1) Created Date:
File: 2030-C-1120-D (DETAILED STREET ELEVATIONS A & C) -.PDF (0 kb) Description: 2030-C-1120-D (DETAILED STREET ELEVATIONS A & C) - 27/11/13 (DMS Info Document: 798259 Page No(s).: 1) Created Date:
File: cover letter re- amendments - 27-11-13.PDF (0 kb) Description: cover letter re: amendments - 27/11/13 (DMS Info Document: 798261 Page No(s).: 1) Created Date:
File: Arboricultural Addendum Statement - Appendix 5.PDF (0 kb) Description: Arboricultural Addendum Statement - Appendix 5 (DMS Info Document: 798263 Page No(s).: 1) Created Date:
File: tree planting diagram - D2152.L301 RevA - 27-11-13.PDF (0 kb) Description: tree planting diagram - D2152.L301 RevA - 27/11/13 (DMS Info Document: 798269 Page No(s).: 1) Created Date:
File: 2030-A-3185-B 5BH6 (PLOT 27) - 27-11-13.PDF (0 kb) Description: 2030-A-3185-B 5BH6 (PLOT 27) - 27/11/13 (DMS Info Document: 798270 Page No(s).: 1) Created Date:
File: 2030-A-3180-B 5BH5 (PLOT 26) - 27-11-13.PDF (0 kb) Description: 2030-A-3180-B 5BH5 (PLOT 26) - 27/11/13 (DMS Info Document: 798272 Page No(s).: 1) Created Date:
File: 2030-A-3170-H 3BH4, 3BH5 (PLOTS 21 22) - 27-11-13 .PDF (0 kb) Description: 2030-A-3170-H 3BH4, 3BH5 (PLOTS 21 22) - 27/11/13 SUPERSEDED 15-1-14 (DMS Info Document: 798274 Page No(s).: 1) Created Date:
File: 2030-A-3160-K 5BH3 (PLOT 20) - 27-11-13.PDF (0 kb) Description: 2030-A-3160-K 5BH3 (PLOT 20) - 27/11/13 (DMS Info Document: 798275 Page No(s).: 1) Created Date:
File: 2030-A-3150-G 3BH4, 3BH4+ (PLOTS 16,17+18) - 27-11.PDF (0 kb) Description: 2030-A-3150-G 3BH4, 3BH4+ (PLOTS 16,17+18) - 27/11/13 (DMS Info Document: 798276 Page No(s).: 1) Created Date:
File: 2030-A-3141-A 5BH2-A (PLOTS 24,25) - 27-11-13.PDF (0 kb) Description: 2030-A-3141-A 5BH2-A (PLOTS 24,25) - 27/11/13 (DMS Info Document: 798278 Page No(s).: 1) Created Date:
File: 2030-A-3100-H 3BH4+ (PLOT 9) - 27-11-13.PDF (0 kb) Description: 2030-A-3100-H 3BH4+ (PLOT 9) - 27/11/13 (DMS Info Document: 798282 Page No(s).: 1) Created Date:
File: 2030-A-3110-F 4BH2 (PLOTS 10+11) - 27-11-13.PDF (0 kb) Description: 2030-A-3110-F 4BH2 (PLOTS 10+11) - 27/11/13 (DMS Info Document: 798283 Page No(s).: 1) Created Date:
File: 2030-A-3120-J 4BH3 (PLOT12) - 27-11-13.PDF (0 kb) Description: 2030-A-3120-J 4BH3 (PLOT12) - 27/11/13 (DMS Info Document: 798284 Page No(s).: 1) Created Date:
File: 2030-A-3130-H 4BH2 4BH2+ (PLOTS 13+14) - 27-11-13.PDF (0 kb) Description: 2030-A-3130-H 4BH2 4BH2+ (PLOTS 13+14) - 27/11/13 (DMS Info Document: 798285 Page No(s).: 1) Created Date:
File: 2030-A-1105 REV P - Site Layout - 10 January 2014 .PDF (0 kb) Description: 2030-A-1105 REV P - Site Layout - 10 January 2014 SUPERSEDED 15-1-14 (DMS Info Document: 804858 Page No(s).: 1) Created Date:
File: 2030-C-1116 REV D - Parking Allocation Plan - 10 J.PDF (0 kb) Description: 2030-C-1116 REV D - Parking Allocation Plan - 10 January 2014 (DMS Info Document: 804860 Page No(s).: 1) Created Date:
File: 2030-A-3140 REV C - Plots 23 and 28 - 10 January 2.PDF (0 kb) Description: 2030-A-3140 REV C - Plots 23 and 28 - 10 January 2014 (DMS Info Document: 804865 Page No(s).: 1) Created Date:
File: 2030-A-3142- REV B - Plot 31 - 10 January 2014.PDF (0 kb) Description: 2030-A-3142- REV B - Plot 31 - 10 January 2014 (DMS Info Document: 804867 Page No(s).: 1) Created Date:
File: 2030-A-3143 REV A - Plots 15, 19, 32 - 10 January .PDF (0 kb) Description: 2030-A-3143 REV A - Plots 15, 19, 32 - 10 January 2014 (DMS Info Document: 804870 Page No(s).: 1) Created Date:
File: 2030-A-3144 REV A - Plot 30 - 10 January 2014.PDF (0 kb) Description: 2030-A-3144 REV A - Plot 30 - 10 January 2014 (DMS Info Document: 804872 Page No(s).: 1) Created Date:
File: 2030-A-3145 REV A - Plot 29 - 10 January 2014.PDF (0 kb) Description: 2030-A-3145 REV A - Plot 29 - 10 January 2014 (DMS Info Document: 804875 Page No(s).: 1) Created Date:
File: D1252-L100 REV E - Combined Hard and Soft Landscap.PDF (0 kb) Description: D1252-L100 REV E - Combined Hard and Soft Landscaping - B and W 2030-A-1105 REV P - Site Layout - 10 January 2014 SUPERSEDED 21-1-14 (DMS Info Document: 804877 Page No(s).: 1) Created Date:
File: D1252-L100 REV E - Combined Hard and Soft Landscap.PDF (0 kb) Description: D1252-L100 REV E - Combined Hard and Soft Landscaping - Colour Version - 10 January 2014 SUPERSEDED 21-1-14 (DMS Info Document: 804881 Page No(s).: 1) Created Date:
File: SK01 P5 (1-2) - Refuse Tracking - 10 January 2014.PDF (0 kb) Description: SK01 P5 (1/2) - Refuse Tracking - 10 January 2014 (DMS Info Document: 804883 Page No(s).: 1) Created Date:
File: SK01-(2-2) - Refuse Tracking - 10 January 2013.PDF (0 kb) Description: SK01-(2/2) - Refuse Tracking - 10 January 2013 (DMS Info Document: 804886 Page No(s).: 1) Created Date:
File: Amended Drawing List - Drawings to be determined -.PDF (0 kb) Description: Amended Drawing List - Drawings to be determined - 10 January 2014 (DMS Info Document: 804895 Page No(s).: 1) Created Date:
File: PHASE 1 PLANT SCHEDULE - DRG NO D2152 L.300 - DATE.PDF (0 kb) Description: PHASE 1 PLANT SCHEDULE - DRG NO D2152 L.300 - DATED 13-1-14 SUPERSEDED 21-1-14 (DMS Info Document: 805060 Page No(s).: 1) Created Date:
File: 2030-A-3170 REV J - Plots 21 and 22 Plans and Elev.PDF (0 kb) Description: 2030-A-3170 REV J - Plots 21 and 22 Plans and Elevations (DMS Info Document: 806279 Page No(s).: 1) Created Date:
File: 2030-C-1121-REV E (Street elevations A and B).PDF (0 kb) Description: 2030-C-1121-REV E (Street elevations A and B) (DMS Info Document: 806282 Page No(s).: 1) Created Date:
File: 2030-A-1105-R - Phase 1 site layout received 22 Ja.PDF (0 kb) Description: 2030-A-1105-R - Phase 1 site layout received 22 January 2014 (DMS Info Document: 806360 Page No(s).: 1) Created Date:
File: Revised Landscape Masterplan - Received 22 January.PDF (0 kb) Description: Revised Landscape Masterplan - Received 22 January 2014 (DMS Info Document: 806362 Page No(s).: 1) Created Date:
File: PHASING PLAN - DRG NO. 2030 - A - 1007 REV A - DAT.PDF (0 kb) Description: PHASING PLAN - DRG NO. 2030 - A - 1007 REV A - DATED 24/09/13 (DMS Info Document: 783585 Page No(s).: 1) Created Date:
File: FLOOR PLANS AND ELEVATIONS - DRG NO. 2030 - A - 31.PDF (0 kb) Description: FLOOR PLANS AND ELEVATIONS - DRG NO. 2030 - A - 3121 REV F - DATED 24/09/13 (DMS Info Document: 783593 Page No(s).: 1) Created Date:
Decision Notice
File: 01377349.pdf (0 kb) Description: Decision Notice (DMS Info Document: 806576 Page No(s).: 1) Created Date:
Report
File: 01347836.pdf (0 kb) Description: PHASE 1 ARBORICULTURAL DEVELOPMENT REPORT SEPT 2013 PART 1 OF 3 (DMS Info Document: 783290 Page No(s).: 1) Created Date:
File: 01347837.pdf (0 kb) Description: PHASE 1 ARBORICULTURAL DEVELOPMENT REPORT SEPT 2013 PART 2 OF 3 (DMS Info Document: 783291 Page No(s).: 1) Created Date:
File: 01347838.pdf (0 kb) Description: PHASE 1 ARBORICULTURAL DEVELOPMENT REPORT SEPT 2013 PART 3 OF 3 (DMS Info Document: 783292 Page No(s).: 1) Created Date:
Site Notice
File: 2030-A-1000-Rev C Site Location Plan - DATED 24-09.PDF (0 kb) Description: 2030-A-1000-Rev C Site Location Plan - DATED 24/09/13 (DMS Info Document: 783584 Page No(s).: 1) Created Date:
File: 2030-A-1000-Rev C Site Location Plan - DATED 24-09.PDF (0 kb) Description: 2030-A-1000-Rev C Site Location Plan - DATED 24/09/13 (DMS Info Document: 783584 Page No(s).: 1) Created Date:
Superseded Plans
File: REFUSE STRATEGY PLAN, PHASE 1 - DATED 24-09-13 SUP.PDF (0 kb) Description: REFUSE STRATEGY PLAN, PHASE 1 - DATED 24/09/13 SUPERSEDED 9-1-14 (DMS Info Document: 783586 Page No(s).: 1) Created Date:
File: FLOOR PLANS AND ELEVATIONS - DRG NO. 2030 - A - 31.PDF (0 kb) Description: FLOOR PLANS AND ELEVATIONS - DRG NO. 2030 - A - 3100 REV F - DATED 24/09/13 SUPERSEDED 9-1-14 (DMS Info Document: 783589 Page No(s).: 1) Created Date:
File: FLOOR PLANS AND ELEVATIONS - DRG NO. 2030 - A - 31.PDF (0 kb) Description: FLOOR PLANS AND ELEVATIONS - DRG NO. 2030 - A - 3110 REV E - DATED 24/09/13 SUPERSEDED 9-1-14 (DMS Info Document: 783590 Page No(s).: 1) Created Date:
File: FLOOR PLANS AND ELEVATIONS - DRG NO. 2030 - A - 31.PDF (0 kb) Description: FLOOR PLANS AND ELEVATIONS - DRG NO. 2030 - A - 3120 REV F - DATED 24/09/13 SUPERSEDED 9-1-14 (DMS Info Document: 783592 Page No(s).: 1) Created Date:
File: FLOOR PLANS AND ELEVATIONS - DRG NO. 2030 - A - 31.PDF (0 kb) Description: FLOOR PLANS AND ELEVATIONS - DRG NO. 2030 - A - 3122 - REV D - DATED 24/09/13 SUPERSEDED 9-1-14 (DMS Info Document: 783594 Page No(s).: 1) Created Date:
File: FLOOR PLANS AND ELEVATIONS - DRG NO. 2030 - A - 31.PDF (0 kb) Description: FLOOR PLANS AND ELEVATIONS - DRG NO. 2030 - A - 3123 REV D - DATED 24/09/13 SUPERSEDED 9-1-14 (DMS Info Document: 783595 Page No(s).: 1) Created Date:
File: FLOOR PLANS AND ELEVATIONS - DRG NO. 2030 - A - 31.PDF (0 kb) Description: FLOOR PLANS AND ELEVATIONS - DRG NO. 2030 - A - 3130 REV F - DATED 24/09/13 SUPERSEDED 9-1-14 (DMS Info Document: 783597 Page No(s).: 1) Created Date:
File: FLOOR PLANS AND ELEVATIONS - DRG NO. 2030 - A - 31.PDF (0 kb) Description: FLOOR PLANS AND ELEVATIONS - DRG NO. 2030 - A - 3150 REV F - DATED 24/09/13 SUPERSEDED 9-1-14 (DMS Info Document: 783598 Page No(s).: 1) Created Date:
File: FLOOR PLANS AND ELEVATIONS - DRG NO. 2030 - A - 31.PDF (0 kb) Description: FLOOR PLANS AND ELEVATIONS - DRG NO. 2030 - A - 3160 REV J - DATED 24/09/13 SUPERSEDED 9-1-14 (DMS Info Document: 783600 Page No(s).: 1) Created Date:
File: FLOOR PLANS AND ELEVATIONS - DRG NO. 2030 - A - 31.PDF (0 kb) Description: FLOOR PLANS AND ELEVATIONS - DRG NO. 2030 - A - 3170 REV F - DATED 24/09/13 SUPERSEDED 9-1-14 (DMS Info Document: 783601 Page No(s).: 1) Created Date:
File: SITE LAYOUT - DRG NO. 2030 - C- 1005 REV T - DATED.PDF (0 kb) Description: SITE LAYOUT - DRG NO. 2030 - C- 1005 REV T - DATED 24/09/13 SUPERSEDED 9-1-14 (DMS Info Document: 783602 Page No(s).: 1) Created Date:
File: SITE LAYOUT - PHASE 1 - DRG NO. 2030 - C - 1105 RE.PDF (0 kb) Description: SITE LAYOUT - PHASE 1 - DRG NO. 2030 - C - 1105 REV J - DATED 24/09/13 SUPERSEDED 9-1-14 (DMS Info Document: 783603 Page No(s).: 1) Created Date:
File: PARKING ALLOCATION PLAN - DRG NO. 2030 - C - 1116 .PDF (0 kb) Description: PARKING ALLOCATION PLAN - DRG NO. 2030 - C - 1116 REV A - DATED 24/09/13 SUPERSEDED 9-1-14 (DMS Info Document: 783604 Page No(s).: 1) Created Date:
File: STREET ELEVATION PHASE 1 - DRG NO. 2030 - C - 1120.PDF (0 kb) Description: STREET ELEVATION PHASE 1 - DRG NO. 2030 - C - 1120 REV C - DATED 24/09/13 SUPERSEDED 9-1-14 (DMS Info Document: 783605 Page No(s).: 1) Created Date:
File: STREET ELEVATIONS A AND B PHASE 1 - DRG NO. 2030 -.PDF (0 kb) Description: STREET ELEVATIONS A AND B PHASE 1 - DRG NO. 2030 - C - 1121 REV C - DATE 24/09/13 SUPERSEDED 9-1-14 (DMS Info Document: 783606 Page No(s).: 1) Created Date:
File: STREET ELEVATIONS PHASE 1 C AND D - DRG NO. 2030 -.PDF (0 kb) Description: STREET ELEVATIONS PHASE 1 C AND D - DRG NO. 2030 - C - 1122 - REV C - DATED 24/09/13 SUPERSEDED 9-1-14 (DMS Info Document: 783607 Page No(s).: 1) Created Date:
File: HARD AND SOFT GENERAL ARRANGEMENT PLAN PHASE 1 - D.PDF (0 kb) Description: HARD AND SOFT GENERAL ARRANGEMENT PLAN PHASE 1 - DATED 24/09/13 SUPERSEDED 9-1-14 (DMS Info Document: 783608 Page No(s).: 1) Created Date:
File: PLANT SCHEDULE PHASE 1 - DATED 24-09-13 SUPERSEDED.PDF (0 kb) Description: PLANT SCHEDULE PHASE 1 - DATED 24/09/13 SUPERSEDED 9-1-14 (DMS Info Document: 783609 Page No(s).: 1) Created Date:
File: SUPERSEDED 10-1-14.PDF (0 kb) Description: SUPERSEDED 10-1-14 (DMS Info Document: 798254 Page No(s).: 1) Created Date:
File: 2030-C-1121-D (STREET ELEVATIONS A & B) - 27-11-13.PDF (0 kb) Description: 2030-C-1121-D (STREET ELEVATIONS A & B) - 27/11/13 SUPERSEDED 15-1-14 (DMS Info Document: 798256 Page No(s).: 1) Created Date:
File: SUPERSEDED 10-1-14.PDF (0 kb) Description: SUPERSEDED 10-1-14 (DMS Info Document: 798277 Page No(s).: 1) Created Date:
File: SUPERSEDED 10-1-14.PDF (0 kb) Description: SUPERSEDED 10-1-14 (DMS Info Document: 798281 Page No(s).: 1) Created Date:
File: SUPERSEDED 10-1-14.PDF (0 kb) Description: SUPERSEDED 10-1-14 (DMS Info Document: 798588 Page No(s).: 1) Created Date:
File: SUPERSEDED 10-1-14.PDF (0 kb) Description: SUPERSEDED 10-1-14 (DMS Info Document: 798600 Page No(s).: 1) Created Date:
File: REFUSE STRATEGY PLAN, PHASE 1 - DATED 24-09-13 SUP.PDF (0 kb) Description: REFUSE STRATEGY PLAN, PHASE 1 - DATED 24/09/13 SUPERSEDED 9-1-14 (DMS Info Document: 783586 Page No(s).: 1) Created Date:
File: FLOOR PLANS AND ELEVATIONS - DRG NO. 2030 - A - 31.PDF (0 kb) Description: FLOOR PLANS AND ELEVATIONS - DRG NO. 2030 - A - 3100 REV F - DATED 24/09/13 SUPERSEDED 9-1-14 (DMS Info Document: 783589 Page No(s).: 1) Created Date:
File: FLOOR PLANS AND ELEVATIONS - DRG NO. 2030 - A - 31.PDF (0 kb) Description: FLOOR PLANS AND ELEVATIONS - DRG NO. 2030 - A - 3110 REV E - DATED 24/09/13 SUPERSEDED 9-1-14 (DMS Info Document: 783590 Page No(s).: 1) Created Date:
File: FLOOR PLANS AND ELEVATIONS - DRG NO. 2030 - A - 31.PDF (0 kb) Description: FLOOR PLANS AND ELEVATIONS - DRG NO. 2030 - A - 3120 REV F - DATED 24/09/13 SUPERSEDED 9-1-14 (DMS Info Document: 783592 Page No(s).: 1) Created Date:
File: FLOOR PLANS AND ELEVATIONS - DRG NO. 2030 - A - 31.PDF (0 kb) Description: FLOOR PLANS AND ELEVATIONS - DRG NO. 2030 - A - 3122 - REV D - DATED 24/09/13 SUPERSEDED 9-1-14 (DMS Info Document: 783594 Page No(s).: 1) Created Date:
File: FLOOR PLANS AND ELEVATIONS - DRG NO. 2030 - A - 31.PDF (0 kb) Description: FLOOR PLANS AND ELEVATIONS - DRG NO. 2030 - A - 3123 REV D - DATED 24/09/13 SUPERSEDED 9-1-14 (DMS Info Document: 783595 Page No(s).: 1) Created Date:
File: FLOOR PLANS AND ELEVATIONS - DRG NO. 2030 - A - 31.PDF (0 kb) Description: FLOOR PLANS AND ELEVATIONS - DRG NO. 2030 - A - 3130 REV F - DATED 24/09/13 SUPERSEDED 9-1-14 (DMS Info Document: 783597 Page No(s).: 1) Created Date:
File: FLOOR PLANS AND ELEVATIONS - DRG NO. 2030 - A - 31.PDF (0 kb) Description: FLOOR PLANS AND ELEVATIONS - DRG NO. 2030 - A - 3150 REV F - DATED 24/09/13 SUPERSEDED 9-1-14 (DMS Info Document: 783598 Page No(s).: 1) Created Date:
File: FLOOR PLANS AND ELEVATIONS - DRG NO. 2030 - A - 31.PDF (0 kb) Description: FLOOR PLANS AND ELEVATIONS - DRG NO. 2030 - A - 3160 REV J - DATED 24/09/13 SUPERSEDED 9-1-14 (DMS Info Document: 783600 Page No(s).: 1) Created Date:
File: FLOOR PLANS AND ELEVATIONS - DRG NO. 2030 - A - 31.PDF (0 kb) Description: FLOOR PLANS AND ELEVATIONS - DRG NO. 2030 - A - 3170 REV F - DATED 24/09/13 SUPERSEDED 9-1-14 (DMS Info Document: 783601 Page No(s).: 1) Created Date:
File: SITE LAYOUT - DRG NO. 2030 - C- 1005 REV T - DATED.PDF (0 kb) Description: SITE LAYOUT - DRG NO. 2030 - C- 1005 REV T - DATED 24/09/13 SUPERSEDED 9-1-14 (DMS Info Document: 783602 Page No(s).: 1) Created Date:
File: SITE LAYOUT - PHASE 1 - DRG NO. 2030 - C - 1105 RE.PDF (0 kb) Description: SITE LAYOUT - PHASE 1 - DRG NO. 2030 - C - 1105 REV J - DATED 24/09/13 SUPERSEDED 9-1-14 (DMS Info Document: 783603 Page No(s).: 1) Created Date:
File: PARKING ALLOCATION PLAN - DRG NO. 2030 - C - 1116 .PDF (0 kb) Description: PARKING ALLOCATION PLAN - DRG NO. 2030 - C - 1116 REV A - DATED 24/09/13 SUPERSEDED 9-1-14 (DMS Info Document: 783604 Page No(s).: 1) Created Date:
File: STREET ELEVATION PHASE 1 - DRG NO. 2030 - C - 1120.PDF (0 kb) Description: STREET ELEVATION PHASE 1 - DRG NO. 2030 - C - 1120 REV C - DATED 24/09/13 SUPERSEDED 9-1-14 (DMS Info Document: 783605 Page No(s).: 1) Created Date:
File: STREET ELEVATIONS A AND B PHASE 1 - DRG NO. 2030 -.PDF (0 kb) Description: STREET ELEVATIONS A AND B PHASE 1 - DRG NO. 2030 - C - 1121 REV C - DATE 24/09/13 SUPERSEDED 9-1-14 (DMS Info Document: 783606 Page No(s).: 1) Created Date:
File: STREET ELEVATIONS PHASE 1 C AND D - DRG NO. 2030 -.PDF (0 kb) Description: STREET ELEVATIONS PHASE 1 C AND D - DRG NO. 2030 - C - 1122 - REV C - DATED 24/09/13 SUPERSEDED 9-1-14 (DMS Info Document: 783607 Page No(s).: 1) Created Date:
File: HARD AND SOFT GENERAL ARRANGEMENT PLAN PHASE 1 - D.PDF (0 kb) Description: HARD AND SOFT GENERAL ARRANGEMENT PLAN PHASE 1 - DATED 24/09/13 SUPERSEDED 9-1-14 (DMS Info Document: 783608 Page No(s).: 1) Created Date:
File: PLANT SCHEDULE PHASE 1 - DATED 24-09-13 SUPERSEDED.PDF (0 kb) Description: PLANT SCHEDULE PHASE 1 - DATED 24/09/13 SUPERSEDED 9-1-14 (DMS Info Document: 783609 Page No(s).: 1) Created Date:
Organisation Name Sent Reply Due Reply Received
Herts & Middlesex Wildlife Trust 08/10/2013 29/10/2013
East & North Herts Clinical Commissioning Group Chis Badger 08/10/2013 29/10/2013
Natural England Consultation Service 08/10/2013 29/10/2013 22/10/2013
Welwyn Hatfield Borough Council Councillor Nick Taylor 08/10/2013 29/10/2013
Hertfordshire County Council - S106 Obligations Denise Headland 08/10/2013 29/10/2013
EDF Energy (Potters Bar) EDF Energy (Potters Bar) 08/10/2013 29/10/2013
Lead Local Flood Authority Fiona Lai 08/10/2013 29/10/2013
Hazardous Installations Directorate Gerard Adderley 08/10/2013 29/10/2013 14/10/2013
Hertfordshire Constabulary Gerry Brophy 08/10/2013 29/10/2013 21/10/2013
Hertfordshire County Council Hertfordshire Transport Programmes & Strategy 08/10/2013 29/10/2013 28/10/2013
Hertfordshire County Council Historic Environment Advisor 08/10/2013 29/10/2013
Welwyn Hatfield Borough Council Landscapes Department 08/10/2013 29/10/2013
WHBC - Client Services Lorraine Davis 08/10/2013 29/10/2013
Hertfordshire Ecology Martin Hicks 08/10/2013 29/10/2013
Hertfordshire County Council - Waste & Minerals Martin Wells 08/10/2013 29/10/2013 25/10/2013
Welwyn Hatfield Access Group Mr B Wilson 08/10/2013 29/10/2013
Herts Fire & Rescue Service Mr John Parker 08/10/2013 29/10/2013
Environment Agency Natasha Smith 08/10/2013 29/10/2013 18/10/2013
Thames Water, Development Control Nicky McHugh 08/10/2013 29/10/2013 18/10/2013
Welwyn Hatfield Borough Council Planning Policy 08/10/2013 29/10/2013
Affinity Water Ltd Planning Team 08/10/2013 29/10/2013
WHBC - Public Health and Protection Public Health and Protection 08/10/2013 29/10/2013
Transco Transco 08/10/2013 29/10/2013
Address Date Sent Expiry Date Date Reconsulted Reconsult Expiry Date
17 Whitehill Ayot St Peter WELWYN AL6 9AE 08/10/2013 29/10/2013
Application Number Proposal Decision Distance
6/2025/0335/HOUSE Proposed loft conversion with installation of roof lights to the front, side and rear roofslopes, new window within the front gable elevation and rear dormer 0
6/2024/2414/LAWP Certificate of lawfulness for the installation of solar photovoltaic panels on the roof Granted 0
6/2024/1295/TPO Covered by TPO 976 (2023) W1 T1. Oak - Cut back the branches by 2-3 metres in line with the brick wall from the Oak Tree overhanging from the conifer hedge. Granted 0
6/2024/0482/HOUSE Installation of rooflights and a front dormer window to facilitate a loft conversion Granted 0
6/2024/0080/FULL Addition of 14 visitor parking bays 0
6/2023/2292/HOUSE Installation of 6 roof light windows and a small dormer window to facilitate a loft conversion Refused 0
6/2023/2145/TPO T3 (3488) Wellingtonia - Longitudinal crack at 17m with little supporting wood, creating weak point - reduce height only by 7 metres. G7 (346) Wellingtonia - Low vitality, in significant decline and almost dead - fell to ground level. TPO 450 (2010) Granted 0
6/2023/0886/TPO T448 Scots Pine - Remove to ground level. G3 Ash - Remove to ground level Refused 0
6/2023/0784/HOUSE Installation of external air conditioning units and the retention of the erection of summer house Granted 0
6/2022/2725/HOUSE Retention of an elevated playhouse around oak tree (TPO 450) Granted 0
6/2022/1950/HOUSE Changes to fenestration including insertion of a windows to side elevations and a rooflight to rear slope of the roof Granted 0
6/2022/2074/COND Submission of details pursuant to condition 2 (landscaping) on planning permission N6/2013/1994/DE 0
6/2022/2075/COND Submission of details pursuant to condition 2 (hard and soft landscaping) on planning permission N6/2013/2563/DE 0
6/2022/0917/TPO TPO 450 T175 (2010) 1 x Lime to reduce branches by around 2m overhanging play area of no 15 Reeves Court. Tree overhangs child's play area leaving lots of debris and bird droppings on play equipment Granted 0
6/2022/0589/TPO Erection of elevated play house adjacent to Oak Tree (TPO450T176 Oak), elevated timber deck will surround the tree trunk. Withdrawn 0
6/2022/0562/HOUSE Installation of 2 side windows to facilitate conversion of garage into habitable space and installation of rear gable end with 5 rooflights to facilitate conversion of loft to habitable space. Granted 0
6/2021/2046/COND Submission of details pursuant to condition 2 (landscaping and play area) on planning permission N6/2014/0208/DE Granted 0
6/2021/1580/TPO Lift canopy of 1 x Oak tree to 4m above ground level Granted 0
6/2021/1485/HOUSE Loft conversion with velux roof lights to side & rear elevations & new window in front gable. Granted 0
6/2021/1498/HOUSE Erection of a single storey rear extension and part garage conversion including insertion of new suntube into side elevation roof. Granted 0
6/2020/2831/HOUSE Retention of children's climbing frame in rear garden (retrospective) Refused 0
6/2020/2840/HOUSE Retention of a wooden bar and seating area (retrospective) Granted 0
6/2020/3156/LAWP Certificate of lawfulness for the demolition of the existing single storey buildings/ structures as shown in red on the enclosed building demolition plan. Refused 0
6/2020/2156/HOUSE Proposed loft conversion to rooflights and rear window. Granted 0
6/2020/1907/HOUSE Loft conversion including a small dormer to the rear and rooflights to the front, side and rear Granted 0
6/2020/0253/HOUSE Erection of rear conservatory Granted 0
6/2020/0377/HOUSE Installation of 4x rooflights to facilitate loft conversion and doors at 2nd floor level with juliet balcony. Granted 0
6/2020/0095/HOUSE Installation of heat pump/air conditioning unit with external fan unit Granted 0
6/2019/2486/HOUSE Erection of a pagoda, installation of 2 side rooflights and 2 ground floor side windows Granted 0
6/2019/1615/TPO Fell 1x Corsican Pine (TPO 450 T183) Refused 0
6/2019/0992/HOUSE Erection of a single storey rear extension, replacement of a rooflight and insertion of two ground floor windows and two side rooflights Granted 0
6/2018/2021/COND Submission of details pursuant to condition 1 (colour of roof light) on planning permission 6/2018/1515/HOUSE Granted
6/2018/1981/HOUSE Erection of single storey rear glass room Refused 0
6/2018/1515/HOUSE Installation of 1 x rear rooflight, 1 x front dome rigid pipe sun tunnels and 1 x side dome rigid pipe sun tunnels Granted
6/2018/1194/HOUSE Installation of side window Granted
6/2017/1325/HOUSE Retention of timber boundary fence part 1.72m high and retention of glazed balustrade 1.12m high Refused
6/2017/1160/MAJ Planning permission for 6 x 1-bedroom and 10 x 2-bedroom apartments in the Eastern building (Plots 197-212), 5 x 1-bedroom and 9 x 2-bedroom apartments in the Western building (Plots 214-226) and associated parking and refuse storage Granted
6/2017/0815/HOUSE Installation of 5 rooflights, dormer window, rear patio doors for a juliet balcony to facilitate loft conversion Granted
6/2017/0810/HOUSE Erection of a single storey rear glazed conservatory extension Granted
6/2017/0339/TPO Fell Pine tree covered by TPO 450 (2011) Withdrawn
6/2017/0175/COND Approval of details reserved by condition 6 (Tree Retention & Removal) on planning permission N6/2012/1778/OP Granted
6/2017/0176/COND Approval of details reserved by conditions 2a (Finished Levels) 2b (Boundary Treatments) 2e (Planting Plans) 2f (Lighting Locations) 2g (Management & Maintenance) & 2h (LAP) on planning permission N6/2013/1994/DE Part Approved / Part Refused
6/2017/0177/COND Approval of details reserved by conditions 2a (Finished Levels) 2d (Tree Protection) 2e (Planting Plans) 2f (Open Space for Local Area or Local Equipped Area for play ) and 2g (Management & Maintenance) on planning permission N6/2013/2563/DE Part Approved / Part Refused
6/2016/0011/VAR Variation of condition 1 (drawings) on planning permission N6/2013/2727/DE Granted
6/2015/1832/COND Approval of details reserved by condition 3 (Materials) of planning permission N6/2013/2727/DE - Approval of reserved matters (access, appearance, landscaping, layout & scale) for the conversion and alterations to The Frythe to provide 12 new dwellings (Phase 3) of planning permission N6/2012/1778/OP Granted
N6/2015/1039/DS Approval of details reserved by condition 26 (noise levels) of planning permission N6/2012/1778/OP Granted
N6/2015/0698/DS Approval of details reserved by condition 2a(finished & surface levels), 2b & c (tree protection details) and 2e (planting plans) of planning permission N6/2013/2563/DE Refused
N6/2015/0699/DS Approval of details reserved by condition 2a (proposed finished levels), 2b & c (proposed finishes and boundary treatment) 2d (planting plans) and 2e (service runs) of planning permission N6/2013/2727/DE Part Discharged
N6/2015/0700/DS Approval of details reserved by condition 2a (finished floor levels), 2b & c (proposed finishes & boundary treatment), 2d (tree protection & fencing), 2e (planting plans & 4 (bin & cycle storage) of planning permission N6/2014/0208/DE Granted
N6/2015/0498/DS Approval of details reserved by condition 9 (phasing), condition 10 (highway works) and condition 19 (buffer zone) on planning permission N6/2012/1778/OP Granted
N6/2014/2518/DS Approval of details reserved by condition 3 (materials) of N6/2014/0208/DE Granted
N6/2014/0538/DS Discharge of condition 3 (materials) of planning permission N6/2013/1994/DE Granted
N6/2014/0208/DE Approval of reserved matters (access, appearance, landscaping, layout & scale) for the erection of 104 new 2,3,4 and 5 bedroom dwellings (Phase 4) of planning permission N6/2012/1778/OP Granted
N6/2013/2727/DE Approval of reserved matters (access, appearance, landscaping, layout & scale) for the conversion and alterations to The Frythe to provide 12 new dwellings (Phase 3) of planning permission N6/2012/1778/OP Granted
N6/2013/2563/DE Approval of reserved matters (access, appearance, landscaping, layout & scale) for residential development involving the erection of 54 houses within phase 2 of planning permission N6/2012/1778/OP Granted
N6/2012/1778/OP Planning permission is sought for the provision of site access, central spine road and the local widening of the access road footway and means of perimeter enclosure. Outline permission is sought for up to 27,773sqm of new residential floorspace, excluding garages, (Use Class C3) (GEA) with a built footprint of up to 18,500sqm, providing up to 182 residential units of up to 3.5 residential storeys, together with the retention and conversion of the Frythe building providing up to 14 units (to provide a total of up to 196 units across the site), implementation of Sustainable Urban Drainage Systems and remodelling and ecological enhancements to the existing pond, service diversions and associated connections and ancillary structures, means of perimeter enclosure and associated structures, the laying out of footpaths and associated access points, bus infrastructure and car parking, provision of soft and hard landscape schemes, including the boundary buffer treatment, playspace and lighting Approval Subject to s106
N6/2012/0413/OP Provision of site access, the central spine road and the local widening of the access road footway. Outline permission is sought for a total of 184 units of up to 3.5 residential storeys comprising 170 residential units of up to 26,625sqm of residential floorspace (Use Class C3)(GEA) with a built footprint of up to 18,500sqm, together with the retention and conservation of the Frythe building providing up to 14 units (included within the total of 184 units across the site), implementation of Sustainable Urban Drainage Systems and remodelling and ecological enhancements to the existing pond, service diversions and associated connections and ancillary structures, means of perimeter enclosure and associated structures, the laying out of footpaths and associated access points, bus infrastructure and car parking, provision of soft and hard landscape scheme, including the boundary buffer treatment, playspace and lightning Withdrawn
N6/2011/2595/MA Demolition of all buildings and structures (with the exception of The Frythe building) and the breaking out of hardstanding, implementation of appropriate remediation where required, bulk earthworks to ground formation levels, tree removal and tree protection works Granted
N6/2002/1597/OP VARIATION OF CONDITON 3 (TIME LIMIT) OF OUTLINE PERMISSION N6/0843/97/OP TO EXTEND THE EXPIRY DATE OF ORIGINAL OUTLINE PLANNING PERMISSION N6/0049/94/OP TO 5 YEARS Granted
N6/1998/0510/FP Installation of 2 No. windows to ground floor of existing research building 18 and addition of external cladding to one bay at the rear Granted
N6/1994/0049/OP Outline application for 8,095 sq mts of research and development space to replace existing unimplemented planning permissions Granted
N6/1990/1001/FP Formation of 119 space car park Granted
N6/1987/0646/FP Single storey front extension and rear infill to provide additional storage in building K Granted
N6/1981/0416/ Sheep shed Granted

There are no NMAs associated with this application