Return to search results   -   Start a new search   -   The consultation period for this application has now closed

Planning Application: 6/2025/0387/MAJ




MAJOR DEVELOPMENT
Decided - Refused
Mr Raymond Lee
r.lee@welhat.gov.uk
57 New Road Digswell Welwyn AL6 0AL
Demolition of the existing house and outbuilding and construction of a new residential apartment building to provide 12 x 2-bedroom and 3 x 3-bedroom apartments, construction of access, landscape planting and ancillary development
525163
215768

  • Welwyn East

  • Councillor Roger Trigg
  • Councillor Julie Cragg
  • Councillor Terry Mitchinson
Welwyn
100080989726
27/02/2025
04/03/2025
09/04/2025
14/11/2025
16/04/2025
Mr Tim Waller
Hawksbury Homes Digswell Ltd
Suite C 19-25 Salisbury Square Old Hatfield AL9 5BT
13 Buckhurst Moors Amen Corner Binfield Berkshire RG12 8TD
Description Distance
Sand and Gravel Minerals Safeguarding Area 0.00
Parish 0.00
Flood Zone Surface Water 100mm 0.00
Flood Zone Surface Water 100mm 0.00
Flood Zone Surface Water 1000mm 0.00
Flood Zone Surface Water 1000mm 0.00
Flood Zone Surface Water 1000mm 0.00
Flood Zone Surface Water 1000mm 0.00
Hertfordshire Ecological Network 0.00
Hertfordshire Ecological Network 0.00
Sand and Gravel Belt 0.00
LEADS Ecology Consultation Area 0.00
Great Crested Newts DLL Risk Zones 0.00
NATS Safeguarding Area Wind Turbine Development 0.00
LLA Aerodrome Safeguarding Area 0.00
Refused
21/11/2025
21/11/2025
Committee
18/11/2025

To download a selection of individual documents place a tick alongside each of the relevant rows and then click on Download selected files. To download all of the documents place a tick in the box alongside the header row and all of the files will be selected, then click on Download selected files. To view individual documents click on the File for the required row.

File Description Date Uploaded
Application Form - Without Personal Information
File: ApplicationFormRedacted.pdf (0 kb) Description: Applicationformredacted Created Date: 27/02/2025
Landscape Plans
File: Landscape Plan.pdf (0 kb) Description: Landscape Plan Created Date: 27/02/2025
Location Plan
File: 22-J4113-LP02 - Location Plan.pdf (0 kb) Description: Location Plan Created Date: 27/02/2025
Plans
File: 22-J4113-CP202.1 - Context Plan.pdf (0 kb) Description: Context Plan Created Date: 27/02/2025
File: 22-J4113-201 - Floor Plans.pdf (0 kb) Description: Proposed Floor Plans Created Date: 27/02/2025
File: 22-J4113-203 - Elevations 2 of 2.pdf (0 kb) Description: Apartment Elevations 2 of 2 Created Date: 27/02/2025
File: 22-J4113-205 - Street Scene EE.pdf (0 kb) Description: Street Scene E:E Created Date: 27/02/2025
File: 22-J4113-202 - Elevations 1 of 2.pdf (0 kb) Description: Apartment Elevations 1 of 2 Created Date: 27/02/2025
File: 22-J4113-204 - Street Scene.pdf (0 kb) Description: Street Scene Created Date: 27/02/2025
File: 22-J4113-206 - Bins and Cycle Store Plan and Elevations.pdf (0 kb) Description: Bins And Cycle Stores Created Date: 27/02/2025
File: ST-3477-500-E- Indicative Drainage Strategy.pdf (0 kb) Description: Indicative Drainage Strategy Created Date: 30/05/2025
File: ST-3477- 502-Risk of Flooding Surface Water Plan.pdf (0 kb) Description: Risk of Flooding Surface Water Plan Created Date: 30/05/2025
Design & Access Statement
File: Design and Access Statement.pdf (0 kb) Description: Design And Access Statement Created Date: 27/02/2025
Environmental Impact Assessment
File: Preliminary Ecological Appraisdal and Bat Roost Assessment.pdf (0 kb) Description: Preliminary Ecological Appraisal And Bat Roost Assessment Created Date: 27/02/2025
Planning Statement
File: Supporting Planning Statement.pdf (0 kb) Description: Supporting Planning Statement Created Date: 27/02/2025
Transport Statement
File: Transport Statement.pdf (0 kb) Description: Transport Statement Created Date: 27/02/2025
Consultee Response
File: 6-25-0387-1.pdf (0 kb) Description: Comment - Historic Environment Advisor Created Date: 13/03/2025
File: Application - 6_2025_0387_MAJ_Redacted.pdf (0 kb) Description: Comment - Thames Water-Redacted Created Date: 13/03/2025
File: Call in - Councillor Julie Cragg.pdf (0 kb) Description: Call in - Councillor Julie Cragg Created Date: 14/03/2025
File: LPA Reference_ 6_2025_0387_MAJ No Comment (below threshold) Response.pdf (0 kb) Description: Comment - Active Travel England Created Date: 14/03/2025
File: Response_6-2025-0387-MAJ.pdf (0 kb) Description: Comment - HCC Growth & Infrastructure Unit Created Date: 27/03/2025
File: WK149976 - 57 New Rd.pdf (0 kb) Description: Conditional - WHBC - Public Health and Protection - attachment WK149976 - 57 New Rd.pdf Created Date: 28/03/2025
File: Comments.pdf (0 kb) Description: Conditional - WHBC - Public Health and Protection Created Date: 28/03/2025
File: Consultation response 6_2025_0387_MAJ_Redacted.pdf (0 kb) Description: Comment - Affinity Water - Redacted Created Date: 31/03/2025
File: LPA Reference_ 6_2025_0387_MAJ No Comment (below threshold) Response(1).pdf (0 kb) Description: Comment - Active Travel England Created Date: 01/04/2025
File: Comments(1).pdf (0 kb) Description: Objection - Welwyn Parish Council Created Date: 01/04/2025
File: 6-25-0387-2.pdf (0 kb) Description: Comment - Historic Environment Advisor Created Date: 01/04/2025
File: Fw_ 6_2025_0387_MAJ 57 New Road Digswell Welwyn AL6 0AL _Redacted.pdf (0 kb) Description: Comment - Growth & Infrastructure Unit - Redacted Created Date: 04/04/2025
File: Comments(2).pdf (0 kb) Description: Client Services- Lorraine Davis - WHBC - Client Services Created Date: 07/04/2025
File: Consultation response 6_2025_0387_MAJ_Redacted(1).pdf (0 kb) Description: Comment- Affinity Water Redacted Created Date: 07/04/2025
File: 6 2025 0387 MAJ 57 New Road Digswell.pdf (0 kb) Description: Comment- Minerals & Waste Created Date: 08/04/2025
File: 620250387MAJ - LLFA - 14.04.2025.pdf (0 kb) Description: Objection - LLFA Created Date: 16/04/2025
File: Response_6-2025-0387-MAJ(1).pdf (0 kb) Description: Comment - HCC Highways Created Date: 24/04/2025
File: Detail on Major Objection to 57 New Road_compressed.pdf (0 kb) Description: Objection - Welwyn Parish Council Created Date: 09/05/2025
File: 6-2025-0387-MAJ mh1.pdf (0 kb) Description: Comments - Hert Ecology Created Date: 19/06/2025
File: 6-2025-0387 MAJ - LLFA - 20.06.pdf (0 kb) Description: Objection - Lead Local Flood Authority Created Date: 20/06/2025
File: 0387MAJ NHS comment_Redacted.pdf (0 kb) Description: Comment - NHS Trust -Redacted Created Date: 25/06/2025
File: 5.2025.0387.MAJ – 57 New Road Digswell Welwyn AL6 0AL.pdf (0 kb) Description: Comment- Landscapes Department- Landscapes consultation MEMO Created Date: 15/08/2025
File: Comments(9).pdf (0 kb) Description: Comment- Landscapes Department - WELHAT Offices, Campus East, Welwyn Garden City, AL8 6AE Created Date: 15/08/2025
File: 6-2025-0387-MAJ - LLFA - 29.08.2025_Redacted.pdf (0 kb) Description: Comment - Lead Local Flood Authority - redacted Created Date: 01/09/2025
File: 6-2025-0387-MAJ mh2 .pdf (0 kb) Description: Comment - Hertfordshire Ecology Created Date: 19/09/2025
File: LPA Reference_ 6_2025_0387_MAJ No Comment (below threshold) Response(2).pdf (0 kb) Description: Comment - Active Travel Created Date: 17/10/2025
File: RE_ 6_2025_0387_MAJ 57 New Road Digswell Welwyn AL6 0AL_Redacted.pdf (0 kb) Description: Conditional - Herts Fire & Rescue_Redacted Created Date: 21/10/2025
File: LPA Reference_ 6_2025_0387_MAJ No Comment (below threshold) Response(3).pdf (0 kb) Description: Comment - Active Travel England Created Date: 24/10/2025
File: 6-25-0387-3.pdf (0 kb) Description: Comment- Historic Environment Advisor Created Date: 27/10/2025
File: Thames Water Comment _Redacted.pdf (0 kb) Description: Comment- Thames Water Redacted Created Date: 27/10/2025
File: Comment Herts Ecology 0387MAJ_Redacted.pdf (0 kb) Description: Comment - Hertfordshire Ecology - redacted Created Date: 28/10/2025
File: Water Officer Comment_Redacted.pdf (0 kb) Description: Comment- Water Officer Redacted Created Date: 29/10/2025
File: Response_6-2025-0387-MAJ(2).pdf (0 kb) Description: Comment- Growth Team Created Date: 29/10/2025
File: Comments(10).pdf (0 kb) Description: Late Representation - Major Objection - Welwyn Parish Council Created Date: 12/11/2025
File: Comments(11).pdf (0 kb) Description: Late Representation - Comment - WHBC Public Health and Protection Created Date: 12/11/2025
File: Holding Objection - Cadent Gas.pdf (0 kb) Description: Late Representation - Holding Objection - Cadent Gas Created Date: 13/11/2025
File: 39388643_CadentGas.pdf (0 kb) Description: Late Representation - Holding Objection - Cadent Gas Attachment Created Date: 13/11/2025
File: No Comment - Active Travel England.pdf (0 kb) Description: Late Representation - Comment - Active Travel England Created Date: 13/11/2025
File: Comment - Affinity Water_Redacted.pdf (0 kb) Description: Late Representation - Comment - Affinity Water_Redacted Created Date: 13/11/2025
File: Response_6-2025-0387-MAJ(3).pdf (0 kb) Description: Comment - HCC Highways Created Date: 14/11/2025
File: 0387MAJ Cadent Gas_Redacted.pdf (0 kb) Description: Objection removed - Cadent Gas - redacted Created Date: 20/11/2025
Neighbour Representation - Without Personal Information
File: 57 New Road New application #2_Redacted.pdf (0 kb) Description: Objection - 8 Mornington Digswell Welwyn AL6 0AJ - Objection - redacted Created Date: 24/03/2025
File: 8 Mornington, Digswell, Welwyn, AL6 0AJ Objection 24-03-2025-Redacted.pdf (0 kb) Description: Objection - 8 Mornington Digswell Welwyn AL6 0AJ -Redacted Created Date: 24/03/2025
File: 23 Mornington, Digswell, Welwyn, AL6 0AJ Objection 29-03-2025-Redacted.pdf (0 kb) Description: Objection - 23 Mornington Digswell Welwyn AL6 0AJ -Redacted Created Date: 29/03/2025
File: WHDC - Objection to the Revised Proposed Development at No 57 New Road.pdf (0 kb) Description: Objection - 23 Mornington Digswell Welwyn AL6 0AJ Created Date: 29/03/2025
File: 10 Mornington, Digswell, Welwyn, AL6 0AJ Objection 01-04-2025-Redacted.pdf (0 kb) Description: Objection - 10 Mornington Digswell Welwyn AL6 0AJ -Redacted Created Date: 01/04/2025
File: 7 Mornington, Digswell, Welwyn, AL6 0AJ Objection 01-04-2025-Redacted.pdf (0 kb) Description: Objection - 7 Mornington Digswell Welwyn AL6 0AJ -Redacted Created Date: 01/04/2025
File: Objection 57 New Road.pdf (0 kb) Description: Objection - 7 Mornington Digswell Welwyn AL6 0AJ Created Date: 01/04/2025
File: Comments - Planning Application 57 New Road.pdf (0 kb) Description: Objection- 64 New Road - Objection Comments Created Date: 05/04/2025
File: 64 New Road, Digswell, Welwyn, AL6 0AN Objection 05-04-2025-Redacted.pdf (0 kb) Description: Objection- 64 New Road Digswell Welwyn AL6 0AN -Redacted Created Date: 05/04/2025
File: Comments-Redacted.pdf (0 kb) Description: Objection - 53 New Road, Digswell, AL6 0AQ -Redacted Created Date: 21/04/2025
File: Comments-Redacted(2).pdf (0 kb) Description: Objection - 1 Mornington Digswell Welwyn AL6 0AJ - Redacted Created Date: 22/04/2025
File: Planning Application 6 2025 0387 MAJ.pdf (0 kb) Description: Objection - 1 Mornington Digswell Welwyn AL6 0AJ Attachment Created Date: 22/04/2025
File: Comments-Redacted(3).pdf (0 kb) Description: Objection - 3 The Dell Welwyn AL6 0BQ -Redacted Created Date: 23/04/2025
File: Comments 57 New Road_Redacted.pdf (0 kb) Description: Objection - 18 Cubitts Close Digswell Welwyn AL6 0DZ - redacted Created Date: 28/04/2025
File: Soper Wildlife Sanctuary.pdf (0 kb) Description: Objection - 18 Cubitts Close Digswell Welwyn AL6 0DZ - Soper Wildlife Sanctuary Created Date: 28/04/2025
File: Objections.pdf (0 kb) Description: Objection - 6 Mornington, Welwyn, AL6 0AJ - Objections.pdf Created Date: 04/05/2025
File: Comments-Redacted(4).pdf (0 kb) Description: Objection - 6 Mornington, Welwyn, AL6 0AJ-Redacted Created Date: 04/05/2025
File: Comments-Redacted(5).pdf (0 kb) Description: Objection - 19B Station Road, Digswell, Welwyn, Herts -Redacted Created Date: 06/05/2025
Decision Notice PDF
File: Decision Notice_620250387MAJ(1).pdf (0 kb) Description: Decision Notice Created Date: 21/11/2025
Officer Report PDF
File: 6-2025-0387-MAJ 57 New Road.pdf (0 kb) Description: Officer report Created Date: 21/11/2025
Biodiversity Survey & Report
File: Biodiversity Net Gain Calculation Report.pdf (0 kb) Description: Biodiversity Net Gain Calculation Report Created Date: 27/02/2025
File: Copy of ECO3479d_BNG.xlsx (0 kb) Description: BNG Metric Created Date: 04/09/2025
Neighbour Representation
File: 57 New Road DRA obj 0525.pdf (0 kb) Description: Objection - 19B Station Road, Digswell, Welwyn, Herts - attachment Created Date: 06/05/2025
Report
File: Drainage Statement.pdf (0 kb) Description: Drainage Statement Created Date: 27/02/2025
Site Notice
File: Site Notice_620250387MAJ.pdf (0 kb) Description: Site Notice Created Date: 26/03/2025
Site Plan
File: 22-J4113-200.1 - Coloured Site Layout Plan.pdf (0 kb) Description: Coloured Site Layout Plan Created Date: 27/02/2025
File: 22-J4113-200 - Site Layout Plan.pdf (0 kb) Description: Proposed Site Plan Created Date: 27/02/2025
Supporting Information
File: E25-367 - 57 New Road, Digswell - Benchmarking Fee Proposal.pdf (0 kb) Description: Viability Rebuttal letter Created Date: 13/10/2025
File: 2505-LLFA Response.pdf (0 kb) Description: Response to the LLFA’s comments Created Date: 30/05/2025
File: 2507-LLFA Response.pdf (0 kb) Description: Stomor Response to the LLFA Created Date: 29/07/2025
File: Viability Statement.pdf (0 kb) Description: Viability Statement Created Date: 27/02/2025
File: 250514 57 New Road Digswell FVA_Welwyn Hatfield BC_Report_v2.pdf (0 kb) Description: AV Viability Appraisal Created Date: 13/10/2025
File: 250811 57 New Road_Rebuttal Letter_v1(1)_Redacted.pdf (0 kb) Description: AV Rebuttal Letter - Redacted Created Date: 24/10/2025
Tree Survey
File: Arboricultural Impact Assessment.pdf (0 kb) Description: Arboricultural Impact Assessment Created Date: 27/02/2025
Organisation Name Sent Reply Due Reply Received
Active Travel England 12/03/2025 02/04/2025 14/03/2025
Active Travel England 31/03/2025 21/04/2025 31/03/2025
Active Travel England 15/10/2025
Active Travel England 22/10/2025
Active Travel England 24/10/2025 14/11/2025 24/10/2025
Active Travel England 10/11/2025
Active Travel England 21/11/2025
Welwyn Parish Council Arooj Afzal 21/11/2025
Welwyn Parish Council Arooj Afzal 10/11/2025
Welwyn Parish Council Arooj Afzal 24/10/2025 14/11/2025 12/11/2025
Welwyn Parish Council Arooj Afzal 22/10/2025
Welwyn Parish Council Arooj Afzal 31/03/2025 21/04/2025 09/05/2025
Welwyn Parish Council Arooj Afzal 15/10/2025
Welwyn Parish Council Arooj Afzal 12/03/2025 02/04/2025 01/04/2025
Welwyn Hatfield Borough Council Councillor Julie Cragg 12/03/2025 02/04/2025 14/03/2025
Welwyn Hatfield Borough Council Councillor Julie Cragg 31/03/2025 21/04/2025
Welwyn Hatfield Borough Council Councillor Julie Cragg 22/10/2025
Welwyn Hatfield Borough Council Councillor Julie Cragg 15/10/2025
Welwyn Hatfield Borough Council Councillor Julie Cragg 24/10/2025 14/11/2025
Welwyn Hatfield Borough Council Councillor Julie Cragg 10/11/2025
Welwyn Hatfield Borough Council Councillor Julie Cragg 21/11/2025
Welwyn Hatfield Borough Council Councillor Roger Trigg 10/11/2025
Welwyn Hatfield Borough Council Councillor Roger Trigg 21/11/2025
Welwyn Hatfield Borough Council Councillor Roger Trigg 24/10/2025 14/11/2025
Welwyn Hatfield Borough Council Councillor Roger Trigg 22/10/2025
Welwyn Hatfield Borough Council Councillor Roger Trigg 31/03/2025 21/04/2025
Welwyn Hatfield Borough Council Councillor Roger Trigg 15/10/2025
Welwyn Hatfield Borough Council Councillor Roger Trigg 12/03/2025 02/04/2025
Welwyn Hatfield Borough Council Councillor Terry Mitchinson 12/03/2025 02/04/2025
Welwyn Hatfield Borough Council Councillor Terry Mitchinson 31/03/2025 21/04/2025
Welwyn Hatfield Borough Council Councillor Terry Mitchinson 22/10/2025
Welwyn Hatfield Borough Council Councillor Terry Mitchinson 15/10/2025
Welwyn Hatfield Borough Council Councillor Terry Mitchinson 24/10/2025 14/11/2025
Welwyn Hatfield Borough Council Councillor Terry Mitchinson 10/11/2025
Welwyn Hatfield Borough Council Councillor Terry Mitchinson 21/11/2025
Hertfordshire County Council - S106 Obligations Denise Headland 21/11/2025
Hertfordshire County Council - S106 Obligations Denise Headland 10/11/2025
Hertfordshire County Council - S106 Obligations Denise Headland 24/10/2025 14/11/2025
Hertfordshire County Council - S106 Obligations Denise Headland 22/10/2025
Hertfordshire County Council - S106 Obligations Denise Headland 15/10/2025
Hertfordshire County Council - S106 Obligations Denise Headland 12/03/2025 02/04/2025
Hertfordshire County Council - S106 Obligations Denise Headland 31/03/2025 21/04/2025
Lead Local Flood Authority Fiona Lai 31/03/2025 21/04/2025
Lead Local Flood Authority Fiona Lai 12/03/2025 02/04/2025
Lead Local Flood Authority Fiona Lai 15/10/2025
Lead Local Flood Authority Fiona Lai 30/05/2025 09/06/2025 20/06/2025
Lead Local Flood Authority Fiona Lai 29/07/2025 08/08/2025 29/08/2025
Lead Local Flood Authority Fiona Lai 22/10/2025
Lead Local Flood Authority Fiona Lai 24/10/2025 14/11/2025
Lead Local Flood Authority Fiona Lai 10/11/2025
Lead Local Flood Authority Fiona Lai 21/11/2025
Hertfordshire County Council HCC Growth Team 10/11/2025
Hertfordshire County Council HCC Growth Team 21/11/2025
Hertfordshire County Council HCC Growth Team 24/10/2025 14/11/2025 29/10/2025
Hertfordshire County Council HCC Growth Team 15/10/2025
Hertfordshire County Council HCC Growth Team 22/10/2025
Hertfordshire County Council HCC Growth Team 31/03/2025 21/04/2025 03/04/2025
Hertfordshire County Council HCC Growth Team 12/03/2025 02/04/2025 27/03/2025
Hertfordshire County Council HCC Minerals and Waste Team 12/03/2025 02/04/2025
Hertfordshire County Council HCC Minerals and Waste Team 31/03/2025 21/04/2025 08/04/2025
Hertfordshire County Council HCC Minerals and Waste Team 22/10/2025
Hertfordshire County Council HCC Minerals and Waste Team 15/10/2025
Hertfordshire County Council HCC Minerals and Waste Team 24/10/2025 14/11/2025
Hertfordshire County Council HCC Minerals and Waste Team 21/11/2025
Hertfordshire County Council HCC Minerals and Waste Team 10/11/2025
Hertfordshire Fire and Rescue Service HCC Water Officer 10/11/2025
Hertfordshire Fire and Rescue Service HCC Water Officer 21/11/2025
Hertfordshire Fire and Rescue Service HCC Water Officer 24/10/2025 14/11/2025 29/10/2025
Hertfordshire Fire and Rescue Service HCC Water Officer 15/10/2025
Hertfordshire Fire and Rescue Service HCC Water Officer 22/10/2025
Hertfordshire Fire and Rescue Service HCC Water Officer 31/03/2025 21/04/2025
Hertfordshire Fire and Rescue Service HCC Water Officer 12/03/2025 02/04/2025
Hertfordshire County Council Hertfordshire Transport Programmes & Strategy 12/03/2025 02/04/2025
Hertfordshire County Council Hertfordshire Transport Programmes & Strategy 31/03/2025 21/04/2025 22/04/2025
Hertfordshire County Council Hertfordshire Transport Programmes & Strategy 15/10/2025
Hertfordshire County Council Hertfordshire Transport Programmes & Strategy 22/10/2025
Hertfordshire County Council Hertfordshire Transport Programmes & Strategy 24/10/2025 14/11/2025 14/11/2025
Hertfordshire County Council Hertfordshire Transport Programmes & Strategy 10/11/2025
Hertfordshire County Council Hertfordshire Transport Programmes & Strategy 21/11/2025
Hertfordshire County Council Historic Environment Advisor 21/11/2025
Hertfordshire County Council Historic Environment Advisor 24/10/2025 14/11/2025 27/10/2025
Hertfordshire County Council Historic Environment Advisor 10/11/2025
Hertfordshire County Council Historic Environment Advisor 22/10/2025
Hertfordshire County Council Historic Environment Advisor 15/10/2025
Hertfordshire County Council Historic Environment Advisor 31/03/2025 21/04/2025 01/04/2025
Hertfordshire County Council Historic Environment Advisor 12/03/2025 02/04/2025 13/03/2025
WHBC - Affordable Housing Housing Development 12/03/2025 02/04/2025
WHBC - Affordable Housing Housing Development 31/03/2025 21/04/2025
WHBC - Affordable Housing Housing Development 15/10/2025
WHBC - Affordable Housing Housing Development 22/10/2025
WHBC - Affordable Housing Housing Development 24/10/2025 14/11/2025
WHBC - Affordable Housing Housing Development 10/11/2025
WHBC - Affordable Housing Housing Development 21/11/2025
Herts Sports Partnership Jane Shewring 10/11/2025
Herts Sports Partnership Jane Shewring 21/11/2025
Herts Sports Partnership Jane Shewring 24/10/2025 14/11/2025
Herts Sports Partnership Jane Shewring 22/10/2025
Herts Sports Partnership Jane Shewring 31/03/2025 21/04/2025
Herts Sports Partnership Jane Shewring 15/10/2025
Herts Sports Partnership Jane Shewring 12/03/2025 02/04/2025
Welwyn Hatfield Borough Council Landscapes Department 12/03/2025 02/04/2025
Welwyn Hatfield Borough Council Landscapes Department 31/03/2025 21/04/2025 15/08/2025
Welwyn Hatfield Borough Council Landscapes Department 15/10/2025
Welwyn Hatfield Borough Council Landscapes Department 22/10/2025
Welwyn Hatfield Borough Council Landscapes Department 10/11/2025
Welwyn Hatfield Borough Council Landscapes Department 24/10/2025 14/11/2025
Welwyn Hatfield Borough Council Landscapes Department 21/11/2025
WHBC - Client Services Lorraine Davis 21/11/2025
WHBC - Client Services Lorraine Davis 24/10/2025 14/11/2025
WHBC - Client Services Lorraine Davis 10/11/2025
WHBC - Client Services Lorraine Davis 22/10/2025
WHBC - Client Services Lorraine Davis 15/10/2025
WHBC - Client Services Lorraine Davis 31/03/2025 21/04/2025
WHBC - Client Services Lorraine Davis 12/03/2025 02/04/2025 07/04/2025
Hertfordshire Ecology Martin Hicks 12/03/2025 02/04/2025
Hertfordshire Ecology Martin Hicks 31/03/2025 21/04/2025
Hertfordshire Ecology Martin Hicks 04/09/2025 14/09/2025 19/09/2025
Hertfordshire Ecology Martin Hicks 15/10/2025
Hertfordshire Ecology Martin Hicks 22/10/2025
Hertfordshire Ecology Martin Hicks 24/10/2025 14/11/2025 28/10/2025
Hertfordshire Ecology Martin Hicks 10/11/2025
Hertfordshire Ecology Martin Hicks 21/11/2025
Herts & Middlesex Bat Group Mr Roger Havard 21/11/2025
Herts & Middlesex Bat Group Mr Roger Havard 10/11/2025
Herts & Middlesex Bat Group Mr Roger Havard 24/10/2025 14/11/2025
Herts & Middlesex Bat Group Mr Roger Havard 22/10/2025
Herts & Middlesex Bat Group Mr Roger Havard 15/10/2025
Herts & Middlesex Bat Group Mr Roger Havard 12/03/2025 02/04/2025
Herts & Middlesex Bat Group Mr Roger Havard 31/03/2025 21/04/2025
Cadent Gas Limited Mr S Carter 12/03/2025 02/04/2025
Cadent Gas Limited Mr S Carter 15/10/2025
Cadent Gas Limited Mr S Carter 31/03/2025 21/04/2025
Cadent Gas Limited Mr S Carter 22/10/2025
Cadent Gas Limited Mr S Carter 24/10/2025 14/11/2025
Cadent Gas Limited Mr S Carter 21/11/2025
Cadent Gas Limited Mr S Carter 10/11/2025
Thames Water, Development Control Nicky McHugh 10/11/2025
Thames Water, Development Control Nicky McHugh 21/11/2025
Thames Water, Development Control Nicky McHugh 24/10/2025 14/11/2025 27/10/2025
Thames Water, Development Control Nicky McHugh 22/10/2025
Thames Water, Development Control Nicky McHugh 15/10/2025
Thames Water, Development Control Nicky McHugh 12/03/2025 02/04/2025 13/03/2025
Thames Water, Development Control Nicky McHugh 31/03/2025 21/04/2025
Welwyn Hatfield Borough Council Parking Services 12/03/2025 02/04/2025
Welwyn Hatfield Borough Council Parking Services 15/10/2025
Welwyn Hatfield Borough Council Parking Services 31/03/2025 21/04/2025
Welwyn Hatfield Borough Council Parking Services 22/10/2025
Welwyn Hatfield Borough Council Parking Services 24/10/2025 14/11/2025
Welwyn Hatfield Borough Council Parking Services 21/11/2025
Welwyn Hatfield Borough Council Parking Services 10/11/2025
Welwyn Hatfield Borough Council Planning Policy 21/11/2025
Welwyn Hatfield Borough Council Planning Policy 24/10/2025 14/11/2025
Welwyn Hatfield Borough Council Planning Policy 10/11/2025
Welwyn Hatfield Borough Council Planning Policy 22/10/2025
Welwyn Hatfield Borough Council Planning Policy 15/10/2025
Welwyn Hatfield Borough Council Planning Policy 12/03/2025 02/04/2025
Welwyn Hatfield Borough Council Planning Policy 31/03/2025 21/04/2025
Affinity Water Ltd Planning Team 31/03/2025 21/04/2025 07/04/2025
Affinity Water Ltd Planning Team 12/03/2025 02/04/2025 31/03/2025
Affinity Water Ltd Planning Team 15/10/2025
Affinity Water Ltd Planning Team 22/10/2025
Affinity Water Ltd Planning Team 10/11/2025
Affinity Water Ltd Planning Team 24/10/2025 14/11/2025
Affinity Water Ltd Planning Team 21/11/2025
WHBC - Public Health and Protection Public Health and Protection 21/11/2025
WHBC - Public Health and Protection Public Health and Protection 24/10/2025 14/11/2025 12/11/2025
WHBC - Public Health and Protection Public Health and Protection 10/11/2025
WHBC - Public Health and Protection Public Health and Protection 22/10/2025
WHBC - Public Health and Protection Public Health and Protection 15/10/2025
WHBC - Public Health and Protection Public Health and Protection 12/03/2025 02/04/2025 28/03/2025
WHBC - Public Health and Protection Public Health and Protection 31/03/2025 21/04/2025
NHS Sheila Addison 12/03/2025 02/04/2025 24/06/2025
NHS Sheila Addison 31/03/2025 21/04/2025
NHS Sheila Addison 15/10/2025
NHS Sheila Addison 22/10/2025
NHS Sheila Addison 24/10/2025 14/11/2025
NHS Sheila Addison 10/11/2025
NHS Sheila Addison 21/11/2025
Address Date Sent Expiry Date Date Reconsulted Reconsult Expiry Date
19B Station Road, Digswell, Welwyn, Herts 24/10/2025 14/11/2025
3 The Dell Welwyn AL6 0BQ 31/03/2025 24/10/2025 14/11/2025
53 New Road Digswell AL6 0AQ 31/03/2025 24/10/2025 14/11/2025
1 Mornington, Digswell, Welwyn. AL6 0AJ 31/03/2025 24/10/2025 14/11/2025
18 Cubitts Close Digswell Welwyn AL6 0DZ 31/03/2025 23/04/2025 24/10/2025 14/11/2025
2 Harmer Dell Welwyn AL6 0BE 31/03/2025 23/04/2025 24/10/2025 14/11/2025
54 Harmer Green Lane Digswell Welwyn AL6 0AW 31/03/2025 23/04/2025 24/10/2025 14/11/2025
54 Harmer Green Lane Digswell Welwyn AL6 0AW 31/03/2025 23/04/2025 24/10/2025 14/11/2025
54 Harmer Green Lane Digswell Welwyn AL6 0AW 31/03/2025 23/04/2025 24/10/2025 14/11/2025
56 Harmer Green Lane Digswell Welwyn AL6 0AW 31/03/2025 23/04/2025 24/10/2025 14/11/2025
56 Harmer Green Lane Digswell Welwyn AL6 0AW 31/03/2025 23/04/2025 24/10/2025 14/11/2025
56 Harmer Green Lane Digswell Welwyn AL6 0AW 31/03/2025 23/04/2025 24/10/2025 14/11/2025
58 Harmer Green Lane Digswell Welwyn AL6 0AW 31/03/2025 23/04/2025 24/10/2025 14/11/2025
2 Mornington Digswell Welwyn AL6 0AJ 31/03/2025 23/04/2025 24/10/2025 14/11/2025
3 Mornington Digswell Welwyn AL6 0AJ 31/03/2025 23/04/2025 24/10/2025 14/11/2025
3 Mornington Digswell Welwyn AL6 0AJ 31/03/2025 23/04/2025 24/10/2025 14/11/2025
4 Mornington Digswell Welwyn AL6 0AJ 31/03/2025 23/04/2025 24/10/2025 14/11/2025
6 Mornington Digswell Welwyn AL6 0AJ 31/03/2025 23/04/2025 24/10/2025 14/11/2025
7 Mornington Digswell Welwyn AL6 0AJ 31/03/2025 23/04/2025 24/10/2025 14/11/2025
8 Mornington Digswell Welwyn AL6 0AJ 02/04/2025 24/10/2025 14/11/2025
9 Mornington Digswell Welwyn AL6 0AJ 31/03/2025 23/04/2025 24/10/2025 14/11/2025
10 Mornington Digswell Welwyn AL6 0AJ 31/03/2025 23/04/2025 24/10/2025 14/11/2025
16 Mornington Digswell Welwyn AL6 0AJ 31/03/2025 23/04/2025 24/10/2025 14/11/2025
18 Mornington Digswell Welwyn AL6 0AJ 31/03/2025 23/04/2025 24/10/2025 14/11/2025
22 Mornington Digswell Welwyn AL6 0AJ 31/03/2025 23/04/2025 24/10/2025 14/11/2025
23 Mornington Digswell Welwyn AL6 0AJ 02/04/2025 24/10/2025 14/11/2025
24 Mornington Digswell Welwyn AL6 0AJ 31/03/2025 23/04/2025 24/10/2025 14/11/2025
2 New Road Digswell Welwyn AL6 0AG 31/03/2025 23/04/2025 24/10/2025 14/11/2025
47 New Road Digswell Welwyn AL6 0AQ 31/03/2025 23/04/2025 24/10/2025 14/11/2025
49 New Road Digswell Welwyn AL6 0AQ 31/03/2025 23/04/2025 24/10/2025 14/11/2025
51 New Road Digswell Welwyn AL6 0AQ 31/03/2025 23/04/2025 24/10/2025 14/11/2025
55 New Road Digswell Welwyn AL6 0AL 31/03/2025 23/04/2025 24/10/2025 14/11/2025
55 New Road Digswell Welwyn AL6 0AL 31/03/2025 23/04/2025 24/10/2025 14/11/2025
56 New Road Digswell Welwyn AL6 0AH 31/03/2025 23/04/2025 24/10/2025 14/11/2025
58 New Road Digswell Welwyn AL6 0AN 31/03/2025 23/04/2025 24/10/2025 14/11/2025
59 New Road Digswell Welwyn AL6 0AL 31/03/2025 23/04/2025 24/10/2025 14/11/2025
59 New Road Digswell Welwyn AL6 0AL 31/03/2025 23/04/2025 24/10/2025 14/11/2025
59 New Road Digswell Welwyn AL6 0AL 31/03/2025 23/04/2025 24/10/2025 14/11/2025
85 Warren Way Digswell Welwyn AL6 0DL 31/03/2025 23/04/2025 24/10/2025 14/11/2025
64 New Road Digswell Welwyn AL6 0AN 31/03/2025 23/04/2025 24/10/2025 14/11/2025
Flat 1 The Red House 54 New Road Digswell Welwyn AL6 0AH 31/03/2025 23/04/2025 24/10/2025 14/11/2025
Flat 2 The Red House 54 New Road Digswell Welwyn AL6 0AH 31/03/2025 23/04/2025 24/10/2025 14/11/2025
Flat 3 The Red House 54 New Road Digswell Welwyn AL6 0AH 31/03/2025 23/04/2025 24/10/2025 14/11/2025
Flat 4 The Red House 54 New Road Digswell Welwyn AL6 0AH 31/03/2025 23/04/2025 24/10/2025 14/11/2025
51A New Road Digswell Welwyn AL6 0AQ 31/03/2025 23/04/2025 24/10/2025 14/11/2025
1 The Dell Digswell Welwyn AL6 0BQ 31/03/2025 23/04/2025 24/10/2025 14/11/2025
2 The Dell Digswell Welwyn AL6 0BQ 31/03/2025 23/04/2025 24/10/2025 14/11/2025
2 The Dell Digswell Welwyn AL6 0BQ 31/03/2025 23/04/2025 24/10/2025 14/11/2025
4 The Dell Digswell Welwyn AL6 0BQ 31/03/2025 23/04/2025 24/10/2025 14/11/2025
Application Number Proposal Decision Distance
6/2025/2446/FULL Installation of new entrance security gates and piers
6/2025/1101/COND Submission of details pursuant to condition 6 (Energy statement) on planning permission 6/2024/2004/VAR Granted
6/2024/2004/VAR Variation of condition 5 (Electric Vehicle Charging Points), 6 (Energy Statement), 7 (Hard and Soft Landscaping), 8 (External Materials), 9 (Refuse and Recycling Storage), 10 (Surface Water Drainage Scheme), 12 (Car Parking), and 22 (Drawing Numbers) on planning permission 6/2023/0907/FULL Granted 0
6/2024/1183/MAJ Erection of 3 storey 9 x apartment following demolition of existing dwelling, alterations to access, provision of parking and bin/cycle stores 0
6/2024/0927/COND Submission of details pursuant to Condition 5 (EV Charging), 6 (Energy Statement), 7 (Hard & Soft Landscaping), 8 (Materials), 9 (Refuse Store), and 10 (Surface Water Drainage), on Planning permission 6/2023/0907/FULL Refused 0
6/2024/0696/COND Submission of details pursuant to condition number 2 (Construction Traffic Management Plan), condition number 3 (Landscape Ecological Management Plan) and condiiton number 4 (Badger Walk-Over Survey) on planning permission 6/2023/0907/FULL Part Discharged 0
6/2023/2093/MAJ Erection of two new residential apartment buildings to provide 12 x 2-bedroom and 5 x 3-bedroom apartments, construction of access, landscape planting and ancillary development following the demolition of existing house and outbuildings 0
6/2023/0163/FULL Proposed part demolition of existing property and erection of 5 no 4 bedroom houses with associated internal access roads, parking and refuse / recycling collection Appeal Dismissed 0
6/2023/0907/FULL Erection of a detached two storey building with accommodation at lower ground level comprising 9 apartments following demolition of existing property with associated bin and cycle storage and car parking provision Granted 0
6/2023/0163/FULL Proposed part demolition of existing property and erection of 5 no 4 bedroom houses with associated internal access roads, parking and refuse / recycling collection Not determined as appeal against non-determination 0
6/2022/1997/MAJ Erection of a 3 storey, 10 x dwelling, apartment building following demolition of existing dwelling Withdrawn 0
6/2022/1924/TPO T1 - T3 - Sycamore - Crown lift to approximately 4 m over the driveway and remove major deadwood. This is to make the trees appropriate to be parked underneath. It also allows for access for larger vehicles. Granted 0
6/2022/0328/HOUSE Installation of new access, crossover, driveway and gates to create an in and out drive. Refused 0
N6/2010/1240/TP Removal of three dead trees within TPO 260 W1 0
N6/2007/0941/TP REMOVAL OF 2 SYCAMORE TREES COVERED BY TPO 260 Granted 0
N6/2005/0514/LU PROPOSED DETACHED STUDIO AND GYM Granted 0
N6/2004/1255/FP REPLACEMENT PITCHED ROOFS TO EXISTING PROPERTY AND ERECTION OF CHIMNEY TO FRONT OF PROPERTY Granted 0
260 2002 For the continued amenity of the land. 0
N6/1998/0278/FP Erection of brick piers, timber fencing and wrought iron gate Refused 0
N6/1997/1021/FP Retention of a 1.8 metre high close boarded fence Refused 0
N6/1996/1017/FP Demolition of existing dwelling and erection of 1 No. detached dwelling, and erection of brick boundary wall Granted 0
N6/1989/0010/FP Single storey side extension to form double garage Granted 0
N6/1988/0494/FP First floor side extension Granted 0
N6/1975/0110/ Front porch Granted 0
N6/1974/0334/ Ground floor extension and alterations Granted 0
N6/1974/0349/ Two storey extension with extended bar under Granted 0

There are no NMAs associated with this application