Return to search results
-
Start a new search
- Comment on this application
Planning Application: 6/2025/0387/MAJ
MAJOR DEVELOPMENT
|
Call In/Major Objection
|
Mr Raymond Lee
|
r.lee@welhat.gov.uk
|
57 New Road Digswell Welwyn AL6 0AL
|
Demolition of the existing house and outbuilding and construction of a new residential apartment building to provide 12 x 2-bedroom and 3 x 3-bedroom apartments, construction of access, landscape planting and ancillary development
|
525163
|
215768
|
|
|
Welwyn
|
100080989726
|
27/02/2025
|
04/03/2025
|
09/04/2025
|
23/04/2025
|
16/04/2025
|
|
Mr Tim Waller
|
Hawksbury Homes Digswell Ltd
|
Suite C
19-25 Salisbury Square
Old Hatfield
AL9 5BT
|
13 Buckhurst Moors
Amen Corner
Binfield
Berkshire
RG12 8TD
|
Description | Distance |
---|---|
Sand and Gravel Minerals Safeguarding Area | 0.00 |
Parish | 0.00 |
Flood Zone Surface Water 100mm | 0.00 |
Flood Zone Surface Water 100mm | 0.00 |
Flood Zone Surface Water 1000mm | 0.00 |
Flood Zone Surface Water 1000mm | 0.00 |
Flood Zone Surface Water 1000mm | 0.00 |
Flood Zone Surface Water 1000mm | 0.00 |
Hertfordshire Ecological Network | 0.00 |
Hertfordshire Ecological Network | 0.00 |
Sand and Gravel Belt | 0.00 |
LEADS Ecology Consultation Area | 0.00 |
Great Crested Newts DLL Risk Zones | 0.00 |
NATS Safeguarding Area Wind Turbine Development | 0.00 |
LLA Aerodrome Safeguarding Area | 0.00 |
|
|
|
Delegated
|
|
To download a selection of individual documents place a tick alongside each of the relevant rows and then click on Download selected files. To download all of the documents place a tick in the box alongside the header row and all of the files will be selected, then click on Download selected files. To view individual documents click on the File for the required row.
File | Description | Date Uploaded | |
---|---|---|---|
Application Form - Without Personal Information | |||
File: ApplicationFormRedacted.pdf (0 kb) | Description: Applicationformredacted | Created Date: 27/02/2025 | |
Landscape Plans | |||
File: Landscape Plan.pdf (0 kb) | Description: Landscape Plan | Created Date: 27/02/2025 | |
Location Plan | |||
File: 22-J4113-LP02 - Location Plan.pdf (0 kb) | Description: Location Plan | Created Date: 27/02/2025 | |
Plans | |||
File: 22-J4113-CP202.1 - Context Plan.pdf (0 kb) | Description: Context Plan | Created Date: 27/02/2025 | |
File: ST-3477-500-D- Indicative Drainage Strategy.pdf (0 kb) | Description: Indicative Drainage Strategy | Created Date: 27/02/2025 | |
File: 22-J4113-201 - Floor Plans.pdf (0 kb) | Description: Proposed Floor Plans | Created Date: 27/02/2025 | |
File: 22-J4113-203 - Elevations 2 of 2.pdf (0 kb) | Description: Apartment Elevations 2 of 2 | Created Date: 27/02/2025 | |
File: 22-J4113-205 - Street Scene EE.pdf (0 kb) | Description: Street Scene E:E | Created Date: 27/02/2025 | |
File: 22-J4113-202 - Elevations 1 of 2.pdf (0 kb) | Description: Apartment Elevations 1 of 2 | Created Date: 27/02/2025 | |
File: 22-J4113-204 - Street Scene.pdf (0 kb) | Description: Street Scene | Created Date: 27/02/2025 | |
File: 22-J4113-206 - Bins and Cycle Store Plan and Elevations.pdf (0 kb) | Description: Bins And Cycle Stores | Created Date: 27/02/2025 | |
Design & Access Statement | |||
File: Design and Access Statement.pdf (0 kb) | Description: Design And Access Statement | Created Date: 27/02/2025 | |
Environmental Impact Assessment | |||
File: Preliminary Ecological Appraisdal and Bat Roost Assessment.pdf (0 kb) | Description: Preliminary Ecological Appraisal And Bat Roost Assessment | Created Date: 27/02/2025 | |
Planning Statement | |||
File: Supporting Planning Statement.pdf (0 kb) | Description: Supporting Planning Statement | Created Date: 27/02/2025 | |
Transport Statement | |||
File: Transport Statement.pdf (0 kb) | Description: Transport Statement | Created Date: 27/02/2025 | |
Consultee Response | |||
File: 6-25-0387-1.pdf (0 kb) | Description: Comment - Historic Environment Advisor | Created Date: 13/03/2025 | |
File: Application - 6_2025_0387_MAJ_Redacted.pdf (0 kb) | Description: Comment - Thames Water-Redacted | Created Date: 13/03/2025 | |
File: Call in - Councillor Julie Cragg.pdf (0 kb) | Description: Call in - Councillor Julie Cragg | Created Date: 14/03/2025 | |
File: LPA Reference_ 6_2025_0387_MAJ No Comment (below threshold) Response.pdf (0 kb) | Description: Comment - Active Travel England | Created Date: 14/03/2025 | |
File: Response_6-2025-0387-MAJ.pdf (0 kb) | Description: Comment - HCC Growth & Infrastructure Unit | Created Date: 27/03/2025 | |
File: WK149976 - 57 New Rd.pdf (0 kb) | Description: Conditional - WHBC - Public Health and Protection - attachment WK149976 - 57 New Rd.pdf | Created Date: 28/03/2025 | |
File: Comments.pdf (0 kb) | Description: Conditional - WHBC - Public Health and Protection | Created Date: 28/03/2025 | |
File: Consultation response 6_2025_0387_MAJ_Redacted.pdf (0 kb) | Description: Comment - Affinity Water - Redacted | Created Date: 31/03/2025 | |
File: LPA Reference_ 6_2025_0387_MAJ No Comment (below threshold) Response(1).pdf (0 kb) | Description: Comment - Active Travel England | Created Date: 01/04/2025 | |
File: Comments(1).pdf (0 kb) | Description: Objection - Welwyn Parish Council | Created Date: 01/04/2025 | |
File: 6-25-0387-2.pdf (0 kb) | Description: Comment - Historic Environment Advisor | Created Date: 01/04/2025 | |
File: Fw_ 6_2025_0387_MAJ 57 New Road Digswell Welwyn AL6 0AL _Redacted.pdf (0 kb) | Description: Comment - Growth & Infrastructure Unit - Redacted | Created Date: 04/04/2025 | |
File: Comments(2).pdf (0 kb) | Description: Client Services- Lorraine Davis - WHBC - Client Services | Created Date: 07/04/2025 | |
File: Consultation response 6_2025_0387_MAJ_Redacted(1).pdf (0 kb) | Description: Comment- Affinity Water Redacted | Created Date: 07/04/2025 | |
File: 6 2025 0387 MAJ 57 New Road Digswell.pdf (0 kb) | Description: Comment- Minerals & Waste | Created Date: 08/04/2025 | |
File: 620250387MAJ - LLFA - 14.04.2025.pdf (0 kb) | Description: Objection - LLFA | Created Date: 16/04/2025 | |
File: Response_6-2025-0387-MAJ(1).pdf (0 kb) | Description: Comment - HCC Highways | Created Date: 24/04/2025 | |
File: Detail on Major Objection to 57 New Road_compressed.pdf (0 kb) | Description: Objection - Welwyn Parish Council | Created Date: 09/05/2025 | |
Neighbour Representation - Without Personal Information | |||
File: 57 New Road New application #2_Redacted.pdf (0 kb) | Description: Objection - 8 Mornington Digswell Welwyn AL6 0AJ - Objection - redacted | Created Date: 24/03/2025 | |
File: 8 Mornington, Digswell, Welwyn, AL6 0AJ Objection 24-03-2025-Redacted.pdf (0 kb) | Description: Objection - 8 Mornington Digswell Welwyn AL6 0AJ -Redacted | Created Date: 24/03/2025 | |
File: 23 Mornington, Digswell, Welwyn, AL6 0AJ Objection 29-03-2025-Redacted.pdf (0 kb) | Description: Objection - 23 Mornington Digswell Welwyn AL6 0AJ -Redacted | Created Date: 29/03/2025 | |
File: WHDC - Objection to the Revised Proposed Development at No 57 New Road.pdf (0 kb) | Description: Objection - 23 Mornington Digswell Welwyn AL6 0AJ | Created Date: 29/03/2025 | |
File: 10 Mornington, Digswell, Welwyn, AL6 0AJ Objection 01-04-2025-Redacted.pdf (0 kb) | Description: Objection - 10 Mornington Digswell Welwyn AL6 0AJ -Redacted | Created Date: 01/04/2025 | |
File: 7 Mornington, Digswell, Welwyn, AL6 0AJ Objection 01-04-2025-Redacted.pdf (0 kb) | Description: Objection - 7 Mornington Digswell Welwyn AL6 0AJ -Redacted | Created Date: 01/04/2025 | |
File: Objection 57 New Road.pdf (0 kb) | Description: Objection - 7 Mornington Digswell Welwyn AL6 0AJ | Created Date: 01/04/2025 | |
File: Comments - Planning Application 57 New Road.pdf (0 kb) | Description: Objection- 64 New Road - Objection Comments | Created Date: 05/04/2025 | |
File: 64 New Road, Digswell, Welwyn, AL6 0AN Objection 05-04-2025-Redacted.pdf (0 kb) | Description: Objection- 64 New Road Digswell Welwyn AL6 0AN -Redacted | Created Date: 05/04/2025 | |
File: Comments-Redacted.pdf (0 kb) | Description: Objection - 53 New Road, Digswell, AL6 0AQ -Redacted | Created Date: 21/04/2025 | |
File: Comments-Redacted(2).pdf (0 kb) | Description: Objection - 1 Mornington Digswell Welwyn AL6 0AJ - Redacted | Created Date: 22/04/2025 | |
File: Planning Application 6 2025 0387 MAJ.pdf (0 kb) | Description: Objection - 1 Mornington Digswell Welwyn AL6 0AJ Attachment | Created Date: 22/04/2025 | |
File: Comments-Redacted(3).pdf (0 kb) | Description: Objection - 3 The Dell Welwyn AL6 0BQ -Redacted | Created Date: 23/04/2025 | |
File: Comments 57 New Road_Redacted.pdf (0 kb) | Description: Objection - 18 Cubitts Close Digswell Welwyn AL6 0DZ - redacted | Created Date: 28/04/2025 | |
File: Soper Wildlife Sanctuary.pdf (0 kb) | Description: Objection - 18 Cubitts Close Digswell Welwyn AL6 0DZ - Soper Wildlife Sanctuary | Created Date: 28/04/2025 | |
File: Objections.pdf (0 kb) | Description: Objection - 6 Mornington, Welwyn, AL6 0AJ - Objections.pdf | Created Date: 04/05/2025 | |
File: Comments-Redacted(4).pdf (0 kb) | Description: Objection - 6 Mornington, Welwyn, AL6 0AJ-Redacted | Created Date: 04/05/2025 | |
File: Comments-Redacted(5).pdf (0 kb) | Description: Objection - 19B Station Road, Digswell, Welwyn, Herts -Redacted | Created Date: 06/05/2025 | |
Biodiversity Survey & Report | |||
File: Biodiversity Net Gain Calculation Report.pdf (0 kb) | Description: Biodiversity Net Gain Calculation Report | Created Date: 27/02/2025 | |
Neighbour Representation | |||
File: 57 New Road DRA obj 0525.pdf (0 kb) | Description: Objection - 19B Station Road, Digswell, Welwyn, Herts - attachment | Created Date: 06/05/2025 | |
Report | |||
File: Drainage Statement.pdf (0 kb) | Description: Drainage Statement | Created Date: 27/02/2025 | |
Site Notice | |||
File: Site Notice_620250387MAJ.pdf (0 kb) | Description: Site Notice | Created Date: 26/03/2025 | |
Site Plan | |||
File: 22-J4113-200.1 - Coloured Site Layout Plan.pdf (0 kb) | Description: Coloured Site Layout Plan | Created Date: 27/02/2025 | |
File: 22-J4113-200 - Site Layout Plan.pdf (0 kb) | Description: Site Plan | Created Date: 27/02/2025 | |
Tree Survey | |||
File: Arboricultural Impact Assessment.pdf (0 kb) | Description: Arboricultural Impact Assessment | Created Date: 27/02/2025 |
Organisation | Name | Sent | Reply Due | Reply Received |
---|---|---|---|---|
Active Travel England | 12/03/2025 | 02/04/2025 | 14/03/2025 | |
Active Travel England | 31/03/2025 | 21/04/2025 | 31/03/2025 | |
Welwyn Parish Council | Arooj Afzal | 31/03/2025 | 21/04/2025 | 09/05/2025 |
Welwyn Parish Council | Arooj Afzal | 12/03/2025 | 02/04/2025 | 01/04/2025 |
HCC Water Officer | Catherine Gilbert | 12/03/2025 | 02/04/2025 | |
HCC Water Officer | Catherine Gilbert | 31/03/2025 | 21/04/2025 | |
Welwyn Hatfield Borough Council | Councillor Julie Cragg | 31/03/2025 | 21/04/2025 | |
Welwyn Hatfield Borough Council | Councillor Julie Cragg | 12/03/2025 | 02/04/2025 | 14/03/2025 |
Welwyn Hatfield Borough Council | Councillor Roger Trigg | 12/03/2025 | 02/04/2025 | |
Welwyn Hatfield Borough Council | Councillor Roger Trigg | 31/03/2025 | 21/04/2025 | |
Welwyn Hatfield Borough Council | Councillor Terry Mitchinson | 31/03/2025 | 21/04/2025 | |
Welwyn Hatfield Borough Council | Councillor Terry Mitchinson | 12/03/2025 | 02/04/2025 | |
Hertfordshire County Council - S106 Obligations | Denise Headland | 12/03/2025 | 02/04/2025 | |
Hertfordshire County Council - S106 Obligations | Denise Headland | 31/03/2025 | 21/04/2025 | |
Lead Local Flood Authority | Fiona Lai | 31/03/2025 | 21/04/2025 | |
Lead Local Flood Authority | Fiona Lai | 12/03/2025 | 02/04/2025 | |
Hertfordshire County Council | HCC Growth Team | 12/03/2025 | 02/04/2025 | 27/03/2025 |
Hertfordshire County Council | HCC Growth Team | 31/03/2025 | 21/04/2025 | 03/04/2025 |
Hertfordshire County Council | HCC Minerals and Waste Team | 31/03/2025 | 21/04/2025 | 08/04/2025 |
Hertfordshire County Council | HCC Minerals and Waste Team | 12/03/2025 | 02/04/2025 | |
Hertfordshire County Council | Hertfordshire Transport Programmes & Strategy | 12/03/2025 | 02/04/2025 | |
Hertfordshire County Council | Hertfordshire Transport Programmes & Strategy | 31/03/2025 | 21/04/2025 | 22/04/2025 |
Hertfordshire County Council | Historic Environment Advisor | 31/03/2025 | 21/04/2025 | 01/04/2025 |
Hertfordshire County Council | Historic Environment Advisor | 12/03/2025 | 02/04/2025 | 13/03/2025 |
WHBC - Affordable Housing | Housing Development | 12/03/2025 | 02/04/2025 | |
WHBC - Affordable Housing | Housing Development | 31/03/2025 | 21/04/2025 | |
Herts Sports Partnership | Jane Shewring | 31/03/2025 | 21/04/2025 | |
Herts Sports Partnership | Jane Shewring | 12/03/2025 | 02/04/2025 | |
Welwyn Hatfield Borough Council | Landscapes Department | 12/03/2025 | 02/04/2025 | |
Welwyn Hatfield Borough Council | Landscapes Department | 31/03/2025 | 21/04/2025 | |
WHBC - Client Services | Lorraine Davis | 31/03/2025 | 21/04/2025 | |
WHBC - Client Services | Lorraine Davis | 12/03/2025 | 02/04/2025 | 07/04/2025 |
Hertfordshire Ecology | Martin Hicks | 12/03/2025 | 02/04/2025 | |
Hertfordshire Ecology | Martin Hicks | 31/03/2025 | 21/04/2025 | |
Herts & Middlesex Bat Group | Mr Roger Havard | 12/03/2025 | 02/04/2025 | |
Herts & Middlesex Bat Group | Mr Roger Havard | 31/03/2025 | 21/04/2025 | |
Cadent Gas Limited | Mr S Carter | 12/03/2025 | 02/04/2025 | |
Cadent Gas Limited | Mr S Carter | 31/03/2025 | 21/04/2025 | |
Thames Water, Development Control | Nicky McHugh | 12/03/2025 | 02/04/2025 | 13/03/2025 |
Thames Water, Development Control | Nicky McHugh | 31/03/2025 | 21/04/2025 | |
Welwyn Hatfield Borough Council | Parking Services | 12/03/2025 | 02/04/2025 | |
Welwyn Hatfield Borough Council | Parking Services | 31/03/2025 | 21/04/2025 | |
Welwyn Hatfield Borough Council | Planning Policy | 12/03/2025 | 02/04/2025 | |
Welwyn Hatfield Borough Council | Planning Policy | 31/03/2025 | 21/04/2025 | |
Affinity Water Ltd | Planning Team | 31/03/2025 | 21/04/2025 | 07/04/2025 |
Affinity Water Ltd | Planning Team | 12/03/2025 | 02/04/2025 | 31/03/2025 |
WHBC - Public Health and Protection | Public Health and Protection | 12/03/2025 | 02/04/2025 | 28/03/2025 |
WHBC - Public Health and Protection | Public Health and Protection | 31/03/2025 | 21/04/2025 | |
NHS | Sheila Addison | 12/03/2025 | 02/04/2025 | |
NHS | Sheila Addison | 31/03/2025 | 21/04/2025 |
Address | Date Sent | Expiry Date | Date Reconsulted | Reconsult Expiry Date |
---|---|---|---|---|
6 Mornington Welwyn AL6 0AJ | ||||
19B Station Road, Digswell, Welwyn, Herts | ||||
3 The Dell Welwyn AL6 0BQ | 31/03/2025 | |||
53 New Road Digswell AL6 0AQ | 31/03/2025 | |||
1 Mornington, Digswell, Welwyn. AL6 0AJ | 31/03/2025 | |||
18 Cubitts Close Digswell Welwyn AL6 0DZ | 31/03/2025 | 23/04/2025 | ||
2 Harmer Dell Welwyn AL6 0BE | 31/03/2025 | 23/04/2025 | ||
54 Harmer Green Lane Digswell Welwyn AL6 0AW | 31/03/2025 | 23/04/2025 | ||
54 Harmer Green Lane Digswell Welwyn AL6 0AW | 31/03/2025 | 23/04/2025 | ||
54 Harmer Green Lane Digswell Welwyn AL6 0AW | 31/03/2025 | 23/04/2025 | ||
56 Harmer Green Lane Digswell Welwyn AL6 0AW | 31/03/2025 | 23/04/2025 | ||
56 Harmer Green Lane Digswell Welwyn AL6 0AW | 31/03/2025 | 23/04/2025 | ||
56 Harmer Green Lane Digswell Welwyn AL6 0AW | 31/03/2025 | 23/04/2025 | ||
58 Harmer Green Lane Digswell Welwyn AL6 0AW | 31/03/2025 | 23/04/2025 | ||
2 Mornington Digswell Welwyn AL6 0AJ | 31/03/2025 | 23/04/2025 | ||
3 Mornington Digswell Welwyn AL6 0AJ | 31/03/2025 | 23/04/2025 | ||
3 Mornington Digswell Welwyn AL6 0AJ | 31/03/2025 | 23/04/2025 | ||
4 Mornington Digswell Welwyn AL6 0AJ | 31/03/2025 | 23/04/2025 | ||
6 Mornington Digswell Welwyn AL6 0AJ | 31/03/2025 | 23/04/2025 | ||
7 Mornington Digswell Welwyn AL6 0AJ | 31/03/2025 | 23/04/2025 | ||
8 Mornington Digswell Welwyn AL6 0AJ | 02/04/2025 | |||
8 Mornington Digswell Welwyn AL6 0AJ | 02/04/2025 | |||
9 Mornington Digswell Welwyn AL6 0AJ | 31/03/2025 | 23/04/2025 | ||
10 Mornington Digswell Welwyn AL6 0AJ | 31/03/2025 | 23/04/2025 | ||
16 Mornington Digswell Welwyn AL6 0AJ | 31/03/2025 | 23/04/2025 | ||
18 Mornington Digswell Welwyn AL6 0AJ | 31/03/2025 | 23/04/2025 | ||
22 Mornington Digswell Welwyn AL6 0AJ | 31/03/2025 | 23/04/2025 | ||
23 Mornington Digswell Welwyn AL6 0AJ | 02/04/2025 | |||
24 Mornington Digswell Welwyn AL6 0AJ | 31/03/2025 | 23/04/2025 | ||
2 New Road Digswell Welwyn AL6 0AG | 31/03/2025 | 23/04/2025 | ||
47 New Road Digswell Welwyn AL6 0AQ | 31/03/2025 | 23/04/2025 | ||
49 New Road Digswell Welwyn AL6 0AQ | 31/03/2025 | 23/04/2025 | ||
51 New Road Digswell Welwyn AL6 0AQ | 31/03/2025 | 23/04/2025 | ||
55 New Road Digswell Welwyn AL6 0AL | 31/03/2025 | 23/04/2025 | ||
55 New Road Digswell Welwyn AL6 0AL | 31/03/2025 | 23/04/2025 | ||
56 New Road Digswell Welwyn AL6 0AH | 31/03/2025 | 23/04/2025 | ||
58 New Road Digswell Welwyn AL6 0AN | 31/03/2025 | 23/04/2025 | ||
59 New Road Digswell Welwyn AL6 0AL | 31/03/2025 | 23/04/2025 | ||
59 New Road Digswell Welwyn AL6 0AL | 31/03/2025 | 23/04/2025 | ||
59 New Road Digswell Welwyn AL6 0AL | 31/03/2025 | 23/04/2025 | ||
85 Warren Way Digswell Welwyn AL6 0DL | 31/03/2025 | 23/04/2025 | ||
64 New Road Digswell Welwyn AL6 0AN | 31/03/2025 | 23/04/2025 | ||
64 New Road Digswell Welwyn AL6 0AN | 31/03/2025 | 23/04/2025 | ||
Flat 1 The Red House 54 New Road Digswell Welwyn AL6 0AH | 31/03/2025 | 23/04/2025 | ||
Flat 2 The Red House 54 New Road Digswell Welwyn AL6 0AH | 31/03/2025 | 23/04/2025 | ||
Flat 3 The Red House 54 New Road Digswell Welwyn AL6 0AH | 31/03/2025 | 23/04/2025 | ||
Flat 4 The Red House 54 New Road Digswell Welwyn AL6 0AH | 31/03/2025 | 23/04/2025 | ||
51A New Road Digswell Welwyn AL6 0AQ | 31/03/2025 | 23/04/2025 | ||
1 The Dell Digswell Welwyn AL6 0BQ | 31/03/2025 | 23/04/2025 | ||
2 The Dell Digswell Welwyn AL6 0BQ | 31/03/2025 | 23/04/2025 | ||
2 The Dell Digswell Welwyn AL6 0BQ | 31/03/2025 | 23/04/2025 | ||
4 The Dell Digswell Welwyn AL6 0BQ | 31/03/2025 | 23/04/2025 |
Application Number | Proposal | Decision | Distance |
---|---|---|---|
6/2024/2004/VAR | Variation of condition 5 (Electric Vehicle Charging Points), 6 (Energy Statement), 7 (Hard and Soft Landscaping), 8 (External Materials), 9 (Refuse and Recycling Storage), 10 (Surface Water Drainage Scheme), 12 (Car Parking), and 22 (Drawing Numbers) on planning permission 6/2023/0907/FULL | Granted | 0 |
6/2024/1183/MAJ | Erection of 3 storey 10 x apartment following demolition of existing dwelling, alterations to access, provision of parking and bin/cycle stores | 0 | |
6/2024/0927/COND | Submission of details pursuant to Condition 5 (EV Charging), 6 (Energy Statement), 7 (Hard & Soft Landscaping), 8 (Materials), 9 (Refuse Store), and 10 (Surface Water Drainage), on Planning permission 6/2023/0907/FULL | Refused | 0 |
6/2024/0696/COND | Submission of details pursuant to condition number 2 (Construction Traffic Management Plan), condition number 3 (Landscape Ecological Management Plan) and condiiton number 4 (Badger Walk-Over Survey) on planning permission 6/2023/0907/FULL | Part Discharged | 0 |
6/2023/2093/MAJ | Erection of two new residential apartment buildings to provide 12 x 2-bedroom and 5 x 3-bedroom apartments, construction of access, landscape planting and ancillary development following the demolition of existing house and outbuildings | 0 | |
6/2023/0163/FULL | Proposed part demolition of existing property and erection of 5 no 4 bedroom houses with associated internal access roads, parking and refuse / recycling collection | Appeal Dismissed | 0 |
6/2023/0907/FULL | Erection of a detached two storey building with accommodation at lower ground level comprising 9 apartments following demolition of existing property with associated bin and cycle storage and car parking provision | Granted | 0 |
6/2023/0163/FULL | Proposed part demolition of existing property and erection of 5 no 4 bedroom houses with associated internal access roads, parking and refuse / recycling collection | Not determined as appeal against non-determination | 0 |
6/2022/1997/MAJ | Erection of a 3 storey, 10 x dwelling, apartment building following demolition of existing dwelling | Withdrawn | 0 |
6/2022/1924/TPO | T1 - T3 - Sycamore - Crown lift to approximately 4 m over the driveway and remove major deadwood. This is to make the trees appropriate to be parked underneath. It also allows for access for larger vehicles. | Granted | 0 |
6/2022/0328/HOUSE | Installation of new access, crossover, driveway and gates to create an in and out drive. | Refused | 0 |
N6/2010/1240/TP | Removal of three dead trees within TPO 260 W1 | 0 | |
N6/2007/0941/TP | REMOVAL OF 2 SYCAMORE TREES COVERED BY TPO 260 | Granted | 0 |
N6/2005/0514/LU | PROPOSED DETACHED STUDIO AND GYM | Granted | 0 |
N6/2004/1255/FP | REPLACEMENT PITCHED ROOFS TO EXISTING PROPERTY AND ERECTION OF CHIMNEY TO FRONT OF PROPERTY | Granted | 0 |
260 2002 | For the continued amenity of the land. | 0 | |
N6/1998/0278/FP | Erection of brick piers, timber fencing and wrought iron gate | Refused | 0 |
N6/1997/1021/FP | Retention of a 1.8 metre high close boarded fence | Refused | 0 |
N6/1996/1017/FP | Demolition of existing dwelling and erection of 1 No. detached dwelling, and erection of brick boundary wall | Granted | 0 |
N6/1989/0010/FP | Single storey side extension to form double garage | Granted | 0 |
N6/1988/0494/FP | First floor side extension | Granted | 0 |
N6/1975/0110/ | Front porch | Granted | 0 |
N6/1974/0334/ | Ground floor extension and alterations | Granted | 0 |
N6/1974/0349/ | Two storey extension with extended bar under | Granted | 0 |
There are no NMAs associated with this application