Return to search results
-
Start a new search
- The consultation period for this application has now closed
Planning Application: 6/2023/2175/MAJ
|
MAJOR DEVELOPMENT
|
Decided - Refused
|
|
Mr William Myers
|
w.myers@welhat.gov.uk
|
|
4 Barneswood Digswell Welwyn AL6 0EU
|
Erection of a two-storey detached dwelling and detached garage and workshop. Creation of new access and driveway. Demolition of an existing residential building, stable block and garage and access
|
|
525626
|
216559
|
|
|
|
Welwyn
|
200003857178
|
|
25/10/2023
|
03/11/2023
|
|
13/12/2023
|
06/10/2024
|
|
28/03/2024
|
|
|
Mr Michael Easton
|
Mr Nigel Pickard
|
|
21 Shrubbery Grove
Royston
SG8 9LJ
|
4 Barneswood
Digswell
Welwyn
Hertfordshire
AL6 0EU
|
| Description | Distance |
|---|---|
| Sand and Gravel Minerals Safeguarding Area | 0.00 |
| Green Belt | 0.00 |
| Landscape Character Area | 0.00 |
| Landscape Character Area | 0.00 |
| Parish | 0.00 |
| Parish | 136.28 |
| Rights of Way | 2.98 |
| Rights of Way | 0.00 |
| Rights of Way | 0.00 |
| Cycle Paths | 0.00 |
| Flood Zone Surface Water 30mm | 0.00 |
| Flood Zone Surface Water 100mm | 0.00 |
| Flood Zone Surface Water 1000mm | 0.00 |
| Flood Zone Surface Water 1000mm | 0.00 |
| Wildlife Sites | 0.00 |
| Wildlife Sites | 0.00 |
| Hertfordshire Ecological Network | 0.00 |
| Hertfordshire Ecological Network | 0.00 |
| Hertfordshire Ecological Network | 0.00 |
| Sand and Gravel Belt | 0.00 |
| High Pressure Gas Pipeline | 14.40 |
|
Refused
|
25/10/2024
|
|
25/10/2024
|
Delegated
|
|
|
To download a selection of individual documents place a tick alongside each of the relevant rows and then click on Download selected files. To download all of the documents place a tick in the box alongside the header row and all of the files will be selected, then click on Download selected files. To view individual documents click on the File for the required row.
| File | Description | Date Uploaded | |
|---|---|---|---|
| Application Form - Without Personal Information | |||
| File: ApplicationFormRedacted.pdf (376 kb) | Description: Applicationformredacted | Created Date: 25/10/2023 | |
| Block Plan | |||
| File: pickard welwyn proposed site plan (002).pdf (391 kb) | Description: Proposed Site Plan | Created Date: 13/03/2024 | |
| Location Plan | |||
| File: pickard welwyn LOCATION PLAN_(1).pdf (79 kb) | Description: Location Plan | Created Date: 31/10/2023 | |
| Plans | |||
| File: pickard welwyn extg garage.pdf (34 kb) | Description: Existing Garage | Created Date: 27/10/2023 | |
| File: pickard welwyn extg outbuildings.pdf (106 kb) | Description: Existing Outbuilding | Created Date: 27/10/2023 | |
| File: pickard welwyn garage plan(2).pdf (79 kb) | Description: Proposed Plans and Elevations | Created Date: 27/10/2023 | |
| File: pickard welwyn proposed(2).pdf (351 kb) | Description: Proposed Plans and Elevations | Created Date: 27/10/2023 | |
| File: pickard welwyn Tree protection plan (002).pdf (258 kb) | Description: Tree Protection Plan | Created Date: 29/02/2024 | |
| Planning Statement | |||
| File: pickard Revised suppprting statement.pdf (585 kb) | Description: Planning Statement | Created Date: 25/10/2023 | |
| Consultee Response | |||
| File: RE_ 6_2023_2175_MAJ 4 Barneswood Digswell Welwyn AL6 0EU .pdf (219 kb) | Description: Comment - Thames Water | Created Date: 14/11/2023 | |
| File: Comments.pdf (77 kb) | Description: Comment- WHBC - Client Services | Created Date: 20/11/2023 | |
| File: Comments(1).pdf (74 kb) | Description: Comment - Welwyn Parish Council | Created Date: 22/11/2023 | |
| File: WK141986 - 4 Barneswood.pdf (70 kb) | Description: Conditional Response- Public Health & Protection- WHBC-WK141986 - 4 Barneswood.pdf | Created Date: 30/11/2023 | |
| File: Comments(2).pdf (74 kb) | Description: Conditional Response- Public Health and Protection - WHBC - Public Health and Protection | Created Date: 30/11/2023 | |
| File: 620232175MAJ - LLFA 30.11.2023.pdf (118 kb) | Description: Comment- LLFA | Created Date: 30/11/2023 | |
| File: LSBUD Ref_ 32797986 Your Ref_ 6_2023_2175_MAJ (DE) DBYD MP-LP High Risk.pdf (944 kb) | Description: Comment- Cadent Gas | Created Date: 18/03/2024 | |
| File: 32797986_CadentGas (002).pdf (309 kb) | Description: Comment- Cadent Gas attachment | Created Date: 18/03/2024 | |
| File: 620232175MAJ - LLFA 18.03.2024.pdf (118 kb) | Description: Comment- LLFA | Created Date: 19/03/2024 | |
| File: 6-2023-2175-MAJ Rsp 1.pdf (206 kb) | Description: Comment- Herts Ecology | Created Date: 20/03/2024 | |
| File: Response_6-2023-2175-MAJ.pdf (85 kb) | Description: Conditional - HCC Transport Programmes & Strategy | Created Date: 10/04/2024 | |
| File: 6-2023-2175-MAJ Rsp 2_Redacted.pdf (145 kb) | Description: Objection - Hertfordshire Ecology - redacted | Created Date: 17/05/2024 | |
| File: 6-2023-2175-MAJ Rsp 3.pdf (175 kb) | Description: Comment- Herts Ecology | Created Date: 15/07/2024 | |
| File: 6-2023-2175-MAJ Rsp 4_Redacted.pdf (90 kb) | Description: Objection - Hertfordshire Ecology - redacted | Created Date: 21/10/2024 | |
| Neighbour Representation - Without Personal Information | |||
| File: 5 Barneswood, Digswell, Welwyn, AL6 0EU Comment 22-11-2023-Redacted.pdf (72 kb) | Description: Comment - 5 Barneswood Digswell Welwyn AL6 0EU -Redacted | Created Date: 22/11/2023 | |
| File: 5 Barneswood, Digswell, Welwyn, AL6 0EU Objection 30-11-2023-Redacted.pdf (76 kb) | Description: Objection-5 Barneswood Digswell Welwyn AL6 0EU -Redacted | Created Date: 30/11/2023 | |
| File: Objection to Planning Application 6-2023-2175-MAJ from 2 Barneswood.pdf (26 kb) | Description: Objection comments - 2 Barneswood Digswell Welwyn AL6 0EU | Created Date: 04/12/2023 | |
| File: 2 Barneswood, Digswell, Welwyn, AL6 0EU Objection 04-12-2023-Redacted.pdf (75 kb) | Description: Objection - 2 Barneswood Digswell Welwyn AL6 0EU -Redacted | Created Date: 04/12/2023 | |
| File: planningobjection 4 Bar Barneswood.pdf (113 kb) | Description: Objection comments - 85 Harmer Green Lane Digswell Welwyn AL6 0ER | Created Date: 04/12/2023 | |
| File: 85 Harmer Green Lane, Digswell, Welwyn, AL6 0ER Objection 04-12-2023-Redacted.pdf (73 kb) | Description: Objeciton - 85 Harmer Green Lane Digswell Welwyn AL6 0ER -Redacted | Created Date: 04/12/2023 | |
| File: 5 Barneswood, Digswell, Welwyn, AL6 0EU Comment 02-04-2024-Redacted.pdf (73 kb) | Description: Comment - 5 Barneswood Digswell Welwyn AL6 0EU -Redacted | Created Date: 02/04/2024 | |
| File: 2 Barneswood, Digswell, Welwyn, AL6 0EU Objection 05-04-2024-Redacted.pdf (76 kb) | Description: Objection- 2 Barneswood Digswell Welwyn AL6 0EU -Redacted | Created Date: 05/04/2024 | |
| File: Additional Objection to Planning Application 6-2023-2175-MAJ.pdf (71 kb) | Description: Objection- 2 Barneswood attachment | Created Date: 05/04/2024 | |
| File: WELWYN PARISH COUNCIL, PARISH CENTRE, LOCKLEYS DRIVE, WELWYN, AL6 9NT, LOCKLEYS DRIVE, AL6 9NT Objection 05-04-2024-Redacted.pdf (75 kb) | Description: Objection- Welwyn Parish Council AL6 9NT - Redacted | Created Date: 05/04/2024 | |
| Decision Notice PDF | |||
| File: Decision Notice_620232175MAJ.pdf (75 kb) | Description: Decision Notice | Created Date: 25/10/2024 | |
| Officer Report PDF | |||
| File: Delegated Report_620232175MAJ(1).pdf (134 kb) | Description: Officer Report | Created Date: 24/10/2024 | |
| Site Notice | |||
| File: Site Notice_620232175MAJ.pdf (85 kb) | Description: Site Notice | Created Date: 07/03/2024 | |
| Site Plan | |||
| File: pickard welwyn extg site plan.pdf (151 kb) | Description: Existing Site Plan | Created Date: 25/10/2023 | |
| Superseded Plans | |||
| File: pickard welwyn LOCATION PLAN_.pdf (72 kb) | Description: Location Plan | Created Date: 25/10/2023 | |
| File: pickard welwyn proposed site plan.pdf (392 kb) | Description: Proposed site plan | Created Date: 25/10/2023 | |
| File: pickard welwyn proposed(2).pdf (325 kb) | Description: Proposed plans and elevations | Created Date: 25/10/2023 | |
| File: pickard welwyn garage plan.pdf (61 kb) | Description: Proposed plans and elevations | Created Date: 25/10/2023 | |
| File: pickard welwyn proposed site plan(3).pdf (441 kb) | Description: Proposed Site Plan | Created Date: 27/10/2023 | |
| File: pickard welwyn proposed site plan.pdf (391 kb) | Description: Proposed Site Plan | Created Date: 12/03/2024 | |
| Supporting Information | |||
| File: ATT00007.pdf (1563 kb) | Description: Preliminary Ecological Assessment | Created Date: 23/05/2024 | |
| File: GCN Ecology report (002)_Redacted.pdf (4517 kb) | Description: Ecology report - redacted | Created Date: 28/06/2024 | |
| File: ASWEcology_BatDuskSurvey_Report_4Barnswood__2024.1.2.pdf (856 kb) | Description: Bat Survey | Created Date: 26/09/2024 | |
| File: ATT00030.pdf (1607 kb) | Description: Preliminary Ecological Assessment | Created Date: 26/09/2024 | |
| Organisation | Name | Sent | Reply Due | Reply Received |
|---|---|---|---|---|
| Hertfordshire County Council - Rights of Way North | 13/11/2023 | 04/12/2023 | ||
| Hertfordshire County Council - Rights of Way North | 13/03/2024 | 03/04/2024 | ||
| Hertfordshire County Council - Rights of Way North | 25/10/2024 | |||
| Herts & Middlesex Wildlife Trust | 25/10/2024 | |||
| Herts & Middlesex Wildlife Trust | 13/03/2024 | 03/04/2024 | ||
| Herts & Middlesex Wildlife Trust | 13/11/2023 | 04/12/2023 | ||
| Welwyn Parish Council | Arooj Afzal | 13/11/2023 | 04/12/2023 | 22/11/2023 |
| Welwyn Parish Council | Arooj Afzal | 13/03/2024 | 03/04/2024 | 05/04/2024 |
| Welwyn Parish Council | Arooj Afzal | 25/10/2024 | ||
| Welwyn Hatfield Borough Council | Councillor Julie Cragg | 25/10/2024 | ||
| Welwyn Hatfield Borough Council | Councillor Julie Cragg | 13/03/2024 | 03/04/2024 | |
| Welwyn Hatfield Borough Council | Councillor Julie Cragg | 13/11/2023 | 04/12/2023 | |
| Welwyn Hatfield Borough Council | Councillor Roger Trigg | 13/11/2023 | 04/12/2023 | |
| Welwyn Hatfield Borough Council | Councillor Roger Trigg | 25/10/2024 | ||
| Welwyn Hatfield Borough Council | Councillor Terry Mitchinson | 13/03/2024 | 03/04/2024 | |
| Welwyn Hatfield Borough Council | Councillor Terry Mitchinson | 25/10/2024 | ||
| Welwyn Hatfield Borough Council | Councillor Terry Mitchinson | 13/11/2023 | 04/12/2023 | |
| HCC - Rights of Way (South) | Dawn West | 13/11/2023 | 04/12/2023 | |
| HCC - Rights of Way (South) | Dawn West | 25/10/2024 | ||
| HCC - Rights of Way (South) | Dawn West | 13/03/2024 | 03/04/2024 | |
| Lead Local Flood Authority | Fiona Lai | 25/10/2024 | ||
| Lead Local Flood Authority | Fiona Lai | 13/11/2023 | 04/12/2023 | |
| Lead Local Flood Authority | Fiona Lai | 13/03/2024 | 03/04/2024 | 18/03/2024 |
| Hertfordshire County Council | Hertfordshire Transport Programmes & Strategy | 20/03/2024 | 10/04/2024 | 09/04/2024 |
| Hertfordshire County Council | Hertfordshire Transport Programmes & Strategy | 25/10/2024 | ||
| The Ramblers' Association | Ian Hardy | 13/03/2024 | 03/04/2024 | |
| The Ramblers' Association | Ian Hardy | 25/10/2024 | ||
| The Ramblers' Association | Ian Hardy | 13/11/2023 | 04/12/2023 | |
| Welwyn Hatfield Borough Council | Landscapes Department | 13/11/2023 | 04/12/2023 | |
| Welwyn Hatfield Borough Council | Landscapes Department | 13/03/2024 | 03/04/2024 | |
| Welwyn Hatfield Borough Council | Landscapes Department | 29/02/2024 | 10/03/2024 | |
| Welwyn Hatfield Borough Council | Landscapes Department | 25/10/2024 | ||
| WHBC - Client Services | Lorraine Davis | 25/10/2024 | ||
| WHBC - Client Services | Lorraine Davis | 13/11/2023 | 04/12/2023 | 20/11/2023 |
| Hertfordshire Ecology | Martin Hicks | 13/11/2023 | 04/12/2023 | |
| Hertfordshire Ecology | Martin Hicks | 13/03/2024 | 03/04/2024 | 19/03/2024 |
| Hertfordshire Ecology | Martin Hicks | 30/04/2024 | 21/05/2024 | 17/05/2024 |
| Hertfordshire Ecology | Martin Hicks | 23/05/2024 | 13/06/2024 | |
| Hertfordshire Ecology | Martin Hicks | 28/06/2024 | 08/07/2024 | |
| Hertfordshire Ecology | Martin Hicks | 26/09/2024 | 06/10/2024 | 21/10/2024 |
| Hertfordshire Ecology | Martin Hicks | 25/10/2024 | ||
| Herts & Middlesex Bat Group | Mr Roger Havard | 25/10/2024 | ||
| Herts & Middlesex Bat Group | Mr Roger Havard | 13/03/2024 | 03/04/2024 | |
| Herts & Middlesex Bat Group | Mr Roger Havard | 13/11/2023 | 04/12/2023 | |
| Cadent Gas Limited | Mr S Carter | 13/11/2023 | 04/12/2023 | |
| Cadent Gas Limited | Mr S Carter | 13/03/2024 | 03/04/2024 | 18/03/2024 |
| Cadent Gas Limited | Mr S Carter | 25/10/2024 | ||
| Environment Agency | Natasha Smith | 25/10/2024 | ||
| Environment Agency | Natasha Smith | 13/03/2024 | 03/04/2024 | |
| Environment Agency | Natasha Smith | 13/11/2023 | 04/12/2023 | |
| Thames Water, Development Control | Nicky McHugh | 13/11/2023 | 04/12/2023 | 14/11/2023 |
| Thames Water, Development Control | Nicky McHugh | 13/03/2024 | 03/04/2024 | |
| Thames Water, Development Control | Nicky McHugh | 25/10/2024 | ||
| Affinity Water Ltd | Planning Team | 25/10/2024 | ||
| Affinity Water Ltd | Planning Team | 13/03/2024 | 03/04/2024 | |
| Affinity Water Ltd | Planning Team | 13/11/2023 | 04/12/2023 | |
| WHBC - Public Health and Protection | Public Health and Protection | 13/11/2023 | 04/12/2023 | 30/11/2023 |
| WHBC - Public Health and Protection | Public Health and Protection | 13/03/2024 | 03/04/2024 | |
| WHBC - Public Health and Protection | Public Health and Protection | 25/10/2024 |
| Address | Date Sent | Expiry Date | Date Reconsulted | Reconsult Expiry Date |
|---|---|---|---|---|
| 81 Harmer Green Lane Digswell Welwyn AL6 0ER | 13/11/2023 | 04/12/2023 | 13/03/2024 | 05/04/2024 |
| 83 Harmer Green Lane Digswell Welwyn AL6 0ER | 13/11/2023 | 04/12/2023 | 13/03/2024 | 05/04/2024 |
| 85 Harmer Green Lane Digswell Welwyn AL6 0ER | 13/11/2023 | 04/12/2023 | 13/03/2024 | 05/04/2024 |
| Lorandi 75 Harmer Green Lane Digswell Welwyn AL6 0EH | 13/11/2023 | 04/12/2023 | 13/03/2024 | 05/04/2024 |
| 87-89 Harmer Green Lane Digswell Welwyn AL6 0ER | 13/11/2023 | 04/12/2023 | 13/03/2024 | 05/04/2024 |
| 1 Barneswood Digswell Welwyn AL6 0EU | 13/11/2023 | 04/12/2023 | 13/03/2024 | 05/04/2024 |
| 2 Barneswood Digswell Welwyn AL6 0EU | ||||
| 2 Barneswood Digswell Welwyn AL6 0EU | 13/11/2023 | 04/12/2023 | 13/03/2024 | 05/04/2024 |
| 5 Barneswood Digswell Welwyn AL6 0EU | 13/11/2023 | 04/12/2023 | 13/03/2024 | 05/04/2024 |
| 3 Barneswood Digswell Welwyn AL6 0EU | 13/11/2023 | 04/12/2023 | 13/03/2024 | 05/04/2024 |
| Application Number | Proposal | Decision | Distance |
|---|---|---|---|
| 6/2025/2184/LAWP | Certificate of lawfulness for the erection of an ancillary detached outbuilding | 1 | |
| 6/2025/2185/HOUSE | Erection of a detached ancillary outbuilding | 0 | |
| 6/2025/1593/MAJ | Erection of a two storey dwelling, an annexe and a detached garage together with associated landscaping and ancillary works following demolition of the existing dwelling, annexe, stable block and detached garage. | ||
| 6/2024/1073/HOUSE | Extensions and alterations to an existing detached ancillary outbuilding currently in use as a hall with a proposed use as ancillary storage to include the creation of a new porch entrance, erection of two gable extensions with ramped access, roof alterations to include a change to the roof form from a hip to a part hipped, part gabled roof, along with various fenestration alterations and change to materials | Refused | 1 |
| 6/2024/1087/HOUSE | Erection of a detached outbuilding for ancillary use with host dwelling | Refused | 1 |
| 6/2023/1444/VAR | Variation of condition 4 (plans) on planning permission 6/2021/1597/HOUSE | Granted | 0 |
| 6/2023/1230/HOUSE | Erection of pitched roof canopy with size increase to replace existing flat roof canopy | Granted | 0 |
| 6/2021/2948/LAWE | Certificate of lawfuness for the existing use of land and buildings in connection with the occupation of a dwelling house for a period of more than 10 years. | Granted | 0 |
| 6/2021/1597/HOUSE | Erection of single storey glazed rear infill extension and reduction of the size of the existing garage. | Granted | 0 |
| 6/2020/2846/HOUSE | Erection of single storey side/rear extension | Refused | 0 |
| 6/2019/0144/FULL | Combination of two semi-detached properties into one single dwelling involving internal and external alterations | Refused | 0 |
| 6/2018/1992/LAWP | Certificate of lawfulness for the internal connection between no 87 and 89 at ground floor and 1st floor level via doorways | Refused | 0 |
| 6/2017/0192/FULL | Change of use of a rural building (stable store) to form ancillary residential accommodation to be used in association with the main dwelling house. | Granted | 0 |
| N6/2013/1144/FP | Change of use of building to form residential accommodation | Granted | 0 |
| N6/2010/1302/MA | Retention of change of use from training centre to residential dwellinghouse (C3) | Withdrawn | 0 |
| N6/2010/1193/LU | Certificate of Lawfulness for existing residential use | Granted | 0 |
| N6/2000/1478/FP | TWO STOREY SIDE EXTENSION | Refused | 0 |
| N6/1998/1128/FP | Engineering works to form pond | Granted | 0 |
| N6/1998/1129/LU | Use of land as private garden within curtilage of dwelling house | Withdrawn | 0 |
| N6/1998/0716/FP | Proposed extensions and alterations | Granted | 0 |
| N6/1996/0391/FP | Erection of ground floor rear extension | Granted | 0 |
| N6/1990/0136/FP | Use of property as a Residential College | Granted | 0 |
| N6/1987/0967/FP | First floor rear extension | Granted | 0 |
| N6/1984/0373/FP | Two storey side and single storey rear extensions and front porch | Refused | 0 |
| N6/1984/0660/ | Two stoey extension and porch | Granted | 0 |
| N6/1982/0618/ | Two storey and single storey extensions | Granted | 0 |
| N6/1981/0097/ | First floor rear extension | Granted | 0 |
| N6/1981/0257/ | Site for residential development | Refused | 0 |
| N6/1981/0365/ | First floor extension | Granted | 0 |
| N6/1981/0424/ | Single storey rear extension | Granted | 0 |
| N6/1980/0016/ | Side extension to provide entrance lobby and WC | Granted | 0 |
| N6/1978/0250/ | Conversion and extension of existing nursery building to residential | Refused | 0 |
| N6/1978/0576/ | Single storey lecture theatre and covered way | Granted | 0 |
| N6/1978/0592/ | Two storey extension to house and erection of a detached garage | Granted | 0 |
| N6/1977/0592/ | Ground and first floor side extension | Granted | 0 |
| N6/1974/0280/ | Ground floor extension | Granted | 0 |
| N6/1991/0585/OP | Erection of 20 dwellings, associated parking and access | Appeal Dismissed | 0 |
There are no NMAs associated with this application