Return to search results
-
Start a new search
- The consultation period for this application has now closed
Planning Application: 6/2022/1028/FULL
FULL PERMISSION
|
Decided - Granted
|
Mrs Sarah Madyausiku
|
s.madyausiku@welhat.gov.uk
|
United Reformed Church Church Road Welwyn Garden City AL8 6PR
|
Construction of a single storey rear extension to the Church following the demolition of an existing 1980s extension and the alteration to 1no. existing window.
|
523634
|
212818
|
|
|
|
10014209924
|
03/05/2022
|
03/05/2022
|
17/06/2022
|
28/06/2022
|
17/06/2022
|
|
Andrew Lightfoot
|
Welwyn Garden City URC
|
BB&C Architects Limited
33a Bridge Street
Cambridge
CB2 1UW
|
Wewlyn Garden City URC
Church Road
Welwyn Garden City
AL8 6PR
|
Description | Distance |
---|---|
Conservation Area | 0.00 |
Area of Archaeological Significance | 0.00 |
Town Centre | 0.00 |
Hertfordshire Ecological Network | 0.00 |
Sand and Gravel Belt | 0.00 |
Granted
|
29/06/2022
|
29/06/2022
|
Delegated
|
|
To download a selection of individual documents place a tick alongside each of the relevant rows and then click on Download selected files. To download all of the documents place a tick in the box alongside the header row and all of the files will be selected, then click on Download selected files. To view individual documents click on the File for the required row.
File | Description | Date Uploaded | |
---|---|---|---|
Application Form - Without Personal Information | |||
File: ApplicationFormRedacted.pdf (208 kb) | Description: Application form redacted | Created Date: 03/05/2022 | |
Block Plan | |||
File: 776 102 P1 Proposed Site Plan.pdf (1254 kb) | Description: Proposed Site Plan | Created Date: 03/05/2022 | |
Elevations | |||
File: 776 130 P1 Existing_Demolition Elevation.pdf (187 kb) | Description: Existing Demolition Elevation | Created Date: 03/05/2022 | |
File: 776 142 P1 Proposed South Elevation.pdf (747 kb) | Description: Proposed South Elevation | Created Date: 03/05/2022 | |
File: 776 143 P1 Proposed West Elevation.pdf (353 kb) | Description: Proposed West Elevation | Created Date: 03/05/2022 | |
File: 776 141 P1 Proposed East Elevation.pdf (209 kb) | Description: Proposed East Elevation | Created Date: 03/05/2022 | |
Floor Plans | |||
File: 776 122 P1 Proposed First Floor Plan.pdf (275 kb) | Description: Proposed First Floor Plan | Created Date: 03/05/2022 | |
File: 776 110 P1 Existing _ Demolition GF Plan.pdf (165 kb) | Description: Existing Demolition Gf Plan | Created Date: 03/05/2022 | |
File: 776 111 P1 Existing _ Demolition 1st Plan.pdf (141 kb) | Description: Existing Demolition 1st Plan | Created Date: 03/05/2022 | |
File: 776 121 P1 Proposed Ground Floor Plan.pdf (292 kb) | Description: Proposed Ground Floor Plan | Created Date: 03/05/2022 | |
Landscape Plans | |||
File: 776 170 P1 Proposed Landscape.pdf (729 kb) | Description: Proposed Landscape | Created Date: 03/05/2022 | |
Location Plan | |||
File: 776 120 P1 Proposed Site Location Plan.pdf (699 kb) | Description: Proposed Site Location Plan | Created Date: 03/05/2022 | |
File: 776 100 P1 Site Location Plan.pdf (144 kb) | Description: Site Location Plan | Created Date: 03/05/2022 | |
Plans | |||
File: 776 140 P1 Proposed Elevations.pdf (956 kb) | Description: Proposed Elevations | Created Date: 03/05/2022 | |
File: 776 151 P1 Existing Section BB.pdf (714 kb) | Description: Existing Section Bb | Created Date: 03/05/2022 | |
File: 776 160 P1 Proposed Section AA.pdf (837 kb) | Description: Proposed Section Aa | Created Date: 03/05/2022 | |
File: 776 161 P1 Proposed Section BB.pdf (691 kb) | Description: Proposed Section Bb | Created Date: 03/05/2022 | |
File: 776 150 P1 Existing Section AA.pdf (692 kb) | Description: Existing Section Aa | Created Date: 03/05/2022 | |
NMA Documents | |||
File: ApplicationFormRedacted(1).pdf (239 kb) | Description: Applicationformredacted(1) | Created Date: 11/07/2025 | |
File: 776- Materials Schedule .pdf (2516 kb) | Description: 776 Materials Schedule | Created Date: 11/07/2025 | |
File: 776 United Reform Church Materials Schedule .pdf (2893 kb) | Description: 776 United Reform Church Materials Schedule | Created Date: 11/07/2025 | |
NMA Plans | |||
File: 776 122 P1 Proposed First Floor Plan.pdf (275 kb) | Description: Proposed First Floor Plan | Created Date: 11/07/2025 | |
File: 776 141 P1 Proposed East Elevation.pdf (209 kb) | Description: Proposed East Elevation | Created Date: 11/07/2025 | |
File: 776 143 P1 Proposed West Elevation.pdf (353 kb) | Description: Proposed West Elevation | Created Date: 11/07/2025 | |
File: 776 141 P2 Proposed East_West Elevation (P2).pdf (351 kb) | Description: Proposed East West Elevation (p2) | Created Date: 11/07/2025 | |
File: 776 400 P2 Proposed Ground Floor.pdf (745 kb) | Description: Proposed Ground Floor | Created Date: 11/07/2025 | |
File: 776 401 P2 Proposed Roof Plan.pdf (676 kb) | Description: Proposed Roof Plan | Created Date: 11/07/2025 | |
File: 776 123 P1 Proposed Roof Plan.pdf (138 kb) | Description: Proposed Roof Plan | Created Date: 11/07/2025 | |
File: 776 121 P1 Proposed Ground Floor Plan.pdf (292 kb) | Description: Proposed Ground Floor Plan | Created Date: 11/07/2025 | |
File: 776 142 P2 Proposed South Elevation (P2).pdf (314 kb) | Description: Proposed South Elevation (p2) | Created Date: 11/07/2025 | |
File: 776 142 P1 Proposed South Elevation.pdf (747 kb) | Description: Proposed South Elevation | Created Date: 11/07/2025 | |
Planning Statement | |||
File: 776 220414 Planning Validation Checklist.pdf (130 kb) | Description: Planning Validation Checklist | Created Date: 03/05/2022 | |
File: 776 DAS 220422_9-16.pdf (8848 kb) | Description: Planning statement 2 | Created Date: 03/05/2022 | |
File: 776 DAS 220422_17-end.pdf (6091 kb) | Description: Planning statement 3 | Created Date: 03/05/2022 | |
File: 776 DAS 220422_1-8.pdf (5882 kb) | Description: Planning statement 1 | Created Date: 03/05/2022 | |
Consultee Response | |||
File: Response_6-2022-1028-FULL.pdf (81 kb) | Description: Comments - HCC Highways | Created Date: 15/06/2022 | |
Neighbour Representation - Without Personal Information | |||
File: 21 Cypress Avenue, Welwyn Garden City, AL7 1HN Support 24-05-2022-Redacted_Redacted.pdf (72 kb) | Description: Support - 21 Cypress Avenue Welwyn Garden City AL7 1HN -Redacted | Created Date: 24/05/2022 | |
File: 26 Parkfields, Welwyn Garden City, AL8 6ED Objection 25-05-2022-Redacted.pdf (76 kb) | Description: Objection - 26 Parkfields Welwyn Garden City AL8 6ED -Redacted | Created Date: 25/05/2022 | |
File: 50 Church Road, Welwyn Garden City, AL8 6QJ Comment 30-05-2022-Redacted.pdf (75 kb) | Description: Comment- 50 Church Road Welwyn Garden City AL8 6QJ -Redacted | Created Date: 30/05/2022 | |
File: 24 Parkfields, Welwyn Garden City, AL8 6ED Comment 08-06-2022-Redacted.pdf (75 kb) | Description: Comment -24 Parkfields Welwyn Garden City AL8 6ED -Redacted | Created Date: 08/06/2022 | |
File: 16 Moss Green, Welwyn Garden City, AL7 3TE Support 09-06-2022-Redacted.pdf (72 kb) | Description: Support - 16 Moss Green Welwyn Garden City AL7 3TE -Redacted | Created Date: 09/06/2022 | |
File: 26 Parkfields, Welwyn Garden City, AL8 6ED Comment 09-06-2022-Redacted.pdf (75 kb) | Description: Comment - 26 Parkfields Welwyn Garden City AL8 6ED -Redacted | Created Date: 09/06/2022 | |
File: 134 Parkway, Welwyn Garden City, AL8 6HP Support 09-06-2022-Redacted.pdf (73 kb) | Description: Support - 134 Parkway Welwyn Garden City AL8 6HP -Redacted | Created Date: 09/06/2022 | |
File: 134 Parkway, Welwyn Garden City, AL8 6HP Support 09-06-2022-Redacted(1).pdf (73 kb) | Description: Support - 134 Parkway Welwyn Garden City AL8 6HP -Redacted | Created Date: 09/06/2022 | |
Decision Notice PDF | |||
File: Decision Notice_620221028FULL.pdf (530 kb) | Description: Decision Notice PDF | Created Date: 29/06/2022 | |
Officer Report PDF | |||
File: Delegated Report_620221028FULL(1).pdf (31 kb) | Description: Delegated Report | Created Date: 29/06/2022 | |
Roof Plans | |||
File: 776 123 P1 Proposed Roof Plan.pdf (138 kb) | Description: Proposed Roof Plan | Created Date: 03/05/2022 | |
File: 776 112 P1 Existing _ Demolition Roof Plan.pdf (138 kb) | Description: Existing Demolition Roof Plan | Created Date: 03/05/2022 | |
Site Notice | |||
File: Site Notice_620221028FULL.pdf (85 kb) | Description: Site Notice | Created Date: 18/05/2022 | |
Site Plan | |||
File: 776 101 P1 Existing Site Plan.pdf (1219 kb) | Description: Existing Site Plan | Created Date: 03/05/2022 |
Organisation | Name | Sent | Reply Due | Reply Received |
---|---|---|---|---|
Joint Committee of the National Amenity Societies | Case Officer | 18/05/2022 | 08/06/2022 | |
Joint Committee of the National Amenity Societies | Case Officer | 29/06/2022 | ||
Welwyn Hatfield Borough Council | Councillor Fiona Thomson | 29/06/2022 | ||
Welwyn Hatfield Borough Council | Councillor Fiona Thomson | 18/05/2022 | 08/06/2022 | |
Welwyn Hatfield Borough Council | Councillor Siobhan Elam | 18/05/2022 | 08/06/2022 | |
Welwyn Hatfield Borough Council | Councillor Siobhan Elam | 29/06/2022 | ||
Hertfordshire County Council | Hertfordshire Transport Programmes & Strategy | 08/06/2022 | 29/06/2022 | 15/06/2022 |
Hertfordshire County Council | Hertfordshire Transport Programmes & Strategy | 29/06/2022 | ||
Hertfordshire County Council | Historic Environment Advisor | 29/06/2022 | ||
Hertfordshire County Council | Historic Environment Advisor | 18/05/2022 | 08/06/2022 | |
Welwyn Hatfield Borough Council | Landscapes Department | 29/06/2022 | ||
Welwyn Hatfield Borough Council | Landscapes Department | 18/05/2022 | 08/06/2022 |
Address | Date Sent | Expiry Date | Date Reconsulted | Reconsult Expiry Date |
---|---|---|---|---|
22 Parkfields Welwyn Garden City AL8 6ED | 18/05/2022 | 10/06/2022 | ||
24 Parkfields Welwyn Garden City AL8 6ED | 18/05/2022 | 10/06/2022 | ||
26 Parkfields Welwyn Garden City AL8 6ED | 18/05/2022 | 10/06/2022 | ||
49 Parkway Welwyn Garden City AL8 6JQ | 18/05/2022 | 10/06/2022 | ||
The Doctors Tonic Church Road Welwyn Garden City AL8 6PR | 18/05/2022 | 10/06/2022 | ||
50 Church Road Welwyn Garden City AL8 6QJ | ||||
16 Moss Green Welwyn Garden City AL7 3TE | ||||
24 Parkfields Welwyn Garden City AL8 6ED | ||||
26 Parkfields Welwyn Garden City AL8 6ED | ||||
26 Parkfields Welwyn Garden City AL8 6ED | ||||
134 Parkway Welwyn Garden City AL8 6HP | ||||
134 Parkway Welwyn Garden City AL8 6HP | ||||
21 Cypress Avenue Welwyn Garden City AL7 1HN |
Application Number | Proposal | Decision | Distance |
---|---|---|---|
6/2025/1068/COND | Submission of details pursuant to condition number 1 (materials), on planning permission 6/2022/1028/FULL | Granted | |
N6/2009/2491/FP | EXTENSION TO CAR PARK TO FORM 9 ADDITIONAL SPACES (RENEWAL OF PREVIOUS PERMISSION N6/2006/1409/FP) | Granted | 0 |
N6/2006/1409/FP | EXTENSION OF CAR PARK TO FORM AN ADDITIONAL 9 SPACES | Granted | 0 |
N6/2006/0579/FP | EXTENSION OF EXISTING CAR PARK | Refused | 0 |
N6/2004/1636/FP | REPLACEMENT UPVC WINDOWS | Refused | 0 |
N6/2003/1228/FP | SMALL EXTENSION TO EXISTING CHURCH CAR PARK | Granted | 0 |
N6/1993/0268/FP | Formation of play area and erection of shed | Granted | 0 |
N6/1990/0906/FP | Extension of existing carpark | Granted | 0 |
C6/1988/0734/FP | Formation of car park and access | Granted | 0 |
Reference Number | Description | Validated Date | Expiry Date | Reason For Change | Officer | Decision | Decision Date |
---|---|---|---|---|---|---|---|
6/2022/1028/NMA | Non-material amendment to the approved scheme as set out in the revised drawings. Patio doors: Change from bifold doors to outward-opening doors with fixed side lights. Breakout room access door: Changed from a solid timber door to a glazed, aluminium powder-coated door aligning with the style and height of the adjacent patio doors. Kitchen access door: Changed from a solid timber door to an aluminium powder-coated safety door. Structural columns: External timber columns are no longer required, as the roof overhang size has been reduced. Green roof build-up: Minor adjustment to the thickness of the green roof to reflect structural detailing. South elevation window: Slight change in the height of the second window to better align with internal layout | 11/07/2025 | 08/08/2025 | The amendments are proposed to reflect minor design refinements developed during detailed design and coordination. While these slightly alter the external appearance, they do not affect the intent of the approved scheme. | Mrs Sarah Madyausiku |