Return to search results
-
Start a new search
- The consultation period for this application has now closed
Planning Application: 6/2021/2492/FULL
FULL PERMISSION
|
Decided - Granted
|
Ms Ashley Ransome
|
a.ransome@welhat.gov.uk
|
Derelict Garages Hollyfield Hatfield AL10 8LW
|
Erection of 8 dwellinghouses (1 x 4 bed, 5 x 3 bed & 2 x 2 bed) with associated vehicular access, parking and landscaping following demolition of existing garages
|
522325
|
206577
|
|
|
Hatfield
|
100080961428
|
25/08/2021
|
25/08/2021
|
|
04/07/2022
|
08/12/2021
|
|
Mr Thomas Beard
|
Sir/Madam
|
21 Ganton Street
London
W1F 9BN
|
|
Description | Distance |
---|---|
Parish | 0.00 |
Parish | 97.30 |
Rights of Way | 4.78 |
Rights of Way | 44.87 |
Rights of Way | 46.78 |
Article 4 HMO Direction | 0.00 |
Flood Zone Surface Water 1000mm | 0.00 |
Hertfordshire Ecological Network | 0.00 |
Hertfordshire Ecological Network | 0.00 |
Sand and Gravel Belt | 0.00 |
Hatfield Heritage Assesment Areas | 0.00 |
Brownfield Land Register | 0.00 |
Granted
|
02/08/2022
|
02/08/2022
|
Committee
|
28/07/2022
|
To download a selection of individual documents place a tick alongside each of the relevant rows and then click on Download selected files. To download all of the documents place a tick in the box alongside the header row and all of the files will be selected, then click on Download selected files. To view individual documents click on the File for the required row.
File | Description | Date Uploaded | |
---|---|---|---|
Application Form - Without Personal Information | |||
File: ApplicationFormRedacted.pdf (0 kb) | Description: Application form redacted | Created Date: 25/08/2021 | |
File: ApplicationFormRedacted(1).pdf (0 kb) | Description: NMA Application form redacted(1) | Created Date: 22/08/2022 | |
File: ApplicationFormRedacted(2).pdf (0 kb) | Description: NMA 2 Application form redacted(2) | Created Date: 03/01/2023 | |
Block Plan | |||
File: HOH-RTA-ZZ-RF-DR-A-00100 - Proposed Site Plan.pdf (0 kb) | Description: NMA 2 Proposed Site Plan | Created Date: 02/03/2023 | |
Landscape Plans | |||
File: A3 - Typical Tree Planting Details-L010-details.pdf (0 kb) | Description: Revised Tree Planting Plan | Created Date: 13/06/2022 | |
File: 0249 - Hollyfield-L001 - Planting Plan RevB.pdf (0 kb) | Description: Revised Planting Plan | Created Date: 11/07/2022 | |
Location Plan | |||
File: 1975_P500-Site Location Plan.pdf (0 kb) | Description: NMA Site Location Plan | Created Date: 22/08/2022 | |
Plans | |||
File: HOH-RTA-ZZ-ZZ-DR-A-00120 - Proposed Site Elevations.pdf (0 kb) | Description: Proposed Site Elevations | Created Date: 13/06/2022 | |
File: HOH-RTA-ZZ-ZZ-DR-A-C-00201 - House Type 2B4P C Plans.pdf (0 kb) | Description: GA Plans House Type 2B4P - C | Created Date: 13/06/2022 | |
File: HOH-RTA-ZZ-ZZ-DR-A-C-00401 - House Type 2B4P C Elevations.pdf (0 kb) | Description: GA Elevations House Type 2B4P - C | Created Date: 13/06/2022 | |
File: HOH-RTA-ZZ-ZZ-DR-A-E-00201 - House Type 3B5P E Plans.pdf (0 kb) | Description: GA Plans House Type 3B5P - E | Created Date: 13/06/2022 | |
File: HOH-RTA-ZZ-ZZ-DR-A-E-00401 - House Type 3B5P E Elevations.pdf (0 kb) | Description: GA Elevations House Type 3B5P - E | Created Date: 13/06/2022 | |
File: HOH-RTA-ZZ-ZZ-DR-A-G-00201 - House Type 3B5P G Plans.pdf (0 kb) | Description: GA Plans House Type 3B5P - G | Created Date: 13/06/2022 | |
File: HOH-RTA-ZZ-ZZ-DR-A-G-00401 - House Type 3B5P G Elevations.pdf (0 kb) | Description: GA Elevations House Type 3B5P - G | Created Date: 13/06/2022 | |
File: HOH-RTA-ZZ-ZZ-DR-A-K-00201 - House Type 4B6P K Plans.pdf (0 kb) | Description: GA Plans House Type 4B6P - K | Created Date: 13/06/2022 | |
File: HOH-RTA-ZZ-ZZ-DR-A-K-00401 - House Type 4B6P K Elevations.pdf (0 kb) | Description: GA Elevations House Type 4B6P - K | Created Date: 13/06/2022 | |
File: HFD-ISS-XX-XX-DR-C-4000 P01 Existing Drainage Layout.pdf (0 kb) | Description: Existing Drainage Layout | Created Date: 13/06/2022 | |
File: HOH-RTA-ZZ-RF-DR-A-00100 - Proposed Site Plan.pdf (0 kb) | Description: Proposed Site Plan | Created Date: 11/07/2022 | |
File: HFD-ISS-XX-XX-DR-C-3000 P04 Proposed Site Wide Drainage Strategy-3000.pdf (0 kb) | Description: Proposed Site Wide Drainage Strategy | Created Date: 15/07/2022 | |
File: HFD-ISS-XX-XX-DR-C-3005 P02 Proposed Drainage Strategy.pdf (0 kb) | Description: Proposed Drainage Strategy | Created Date: 15/07/2022 | |
Design & Access Statement | |||
File: RT21124_DesignAccessStatementAddendumPL03.pdf (0 kb) | Description: Revised Design and Access Statement | Created Date: 13/06/2022 | |
Landscape Report | |||
File: Hollyfield Landscape Management & Maintenance Specification.pdf (0 kb) | Description: Revised Landscape Management & Maintenance Specification | Created Date: 13/06/2022 | |
Planning Statement | |||
File: R_JWW_070622_Hollyfields_Supplementary Planning Statement.pdf (0 kb) | Description: Revised Supplementary Planning Statement 2022 | Created Date: 13/06/2022 | |
Transport Statement | |||
File: WSP_70045594_Hollyfield_Hatfield_TN_HCC001_Redacted.pdf (0 kb) | Description: Transport Technical Note HCC001 - redacted | Created Date: 11/07/2022 | |
File: 70045594-WSP-TS-001 Hollyfield Transport Statement P03 Part 1.pdf (0 kb) | Description: Transport Statement P03 Part 1 | Created Date: 13/07/2022 | |
File: 70045594-WSP-TS-001 Hollyfield Transport Statement P03 Part 2.pdf (0 kb) | Description: Transport Statement P03 Part 2 | Created Date: 13/07/2022 | |
Consultee Response | |||
File: Comments.pdf (0 kb) | Description: Lorraine Davis - WHBC - Client Services | Created Date: 09/11/2021 | |
File: Comments(1)_Redacted.pdf (0 kb) | Description: Councillor Paul Zukowskyj - WHBC comments redacted | Created Date: 09/11/2021 | |
File: LLFA response.pdf (0 kb) | Description: Comments - LLFA | Created Date: 19/11/2021 | |
File: WK127932 - Hollyfield.pdf (0 kb) | Description: Conditional Response - Public Health and Protection- Attachment | Created Date: 23/11/2021 | |
File: Comments(2).pdf (0 kb) | Description: Conditional Response - WHBC - Public Health and Protection | Created Date: 23/11/2021 | |
File: Response 2021-2492-FULL - HCC Highway.pdf (0 kb) | Description: Conditional Response - HCC Highway | Created Date: 25/11/2021 | |
File: 133878 - Environment Agency Response.pdf (0 kb) | Description: Comments - Environment Agency | Created Date: 30/11/2021 | |
File: Comments(3).pdf (0 kb) | Description: Comment- Lorraine Davis - WHBC - Client Services | Created Date: 14/06/2022 | |
File: FW 620212492FULL Derelict Garages Hollyfield Hatfield AL10 8LW(1).pdf (0 kb) | Description: Comment - Thames Water - email - redacted | Created Date: 16/06/2022 | |
File: HCC Highways 2492 full.pdf (0 kb) | Description: Objection - HCC Highways | Created Date: 22/06/2022 | |
File: 2492FULL_Redacted.pdf (0 kb) | Description: Comments - Landscape - email - redacted | Created Date: 23/06/2022 | |
File: Comments(4).pdf (0 kb) | Description: Comment - WHBC - Public Health and Protection | Created Date: 01/07/2022 | |
File: 6_2021_2492_FULL - Derelict Garages Hollyfield Hatfield AL10 8LW.pdf (0 kb) | Description: Comment - HCC Transport Programmes and Strategy | Created Date: 01/07/2022 | |
File: Response_6-2021-2492-FULL_Redacted.pdf (0 kb) | Description: Comments - HCC Highways - Redacted | Created Date: 11/07/2022 | |
File: FW_ 6_2021_2492_FULL.pdf (0 kb) | Description: Comments - Parking Services | Created Date: 14/07/2022 | |
File: RE 620212492FULL Derelict Garages Hollyfield Hatfield AL10 8LW_Redacted.pdf (0 kb) | Description: Comment - Thames Water - Email - Redacted | Created Date: 21/07/2022 | |
Neighbour Representation - Without Personal Information | |||
File: 52 Cherry Way, Hatfield, AL10 8LE Support 26-11-2021-Redacted.pdf (0 kb) | Description: 52 Cherry Way Hatfield AL10 8LE -Redacted | Created Date: 26/11/2021 | |
File: 2 Old Leys, Hatfield, AL10 8LR Comment 29-11-2021-Redacted.pdf (0 kb) | Description: 2 Old Leys Hatfield AL10 8LR -Redacted | Created Date: 29/11/2021 | |
File: 52 Cherry Way, Hatfield, AL10 8LE Objection 29-11-2021-Redacted(1).pdf (0 kb) | Description: 52 Cherry Way Hatfield AL10 8LE -Redacted | Created Date: 29/11/2021 | |
File: 52 Cherry Way, Hatfield, AL10 8LE Comment 29-11-2021-Redacted.pdf (0 kb) | Description: 52 Cherry Way Hatfield AL10 8LE -Redacted | Created Date: 29/11/2021 | |
File: 52 Cherry Way, Hatfield, AL10 8LE Objection 29-11-2021-Redacted_Redacted.pdf (0 kb) | Description: 52 Cherry Way Hatfield AL10 8LE - redacted 2 | Created Date: 30/11/2021 | |
File: 7, Strawberry Field Comment 30-11-2021-Redacted.pdf (0 kb) | Description: Comment - 7 Strawberry Field -Redacted | Created Date: 30/11/2021 | |
File: Demolition of derelict garages - Hollyfield, Hatfield AL10 8LW_Redacted.pdf (0 kb) | Description: Comments - 56 Cherry Way AL10 8LE Redacted | Created Date: 15/02/2022 | |
File: 56 Cherry Way, Hatfield, AL10 8LE Objection 14-06-2022-Redacted.pdf (0 kb) | Description: Objection- 56 Cherry Way Hatfield AL10 8LE -Redacted | Created Date: 14/06/2022 | |
File: 1 Old Leys_Redacted.pdf (0 kb) | Description: Objection - 1 Old Leys Hatfield AL108LR redacted | Created Date: 22/06/2022 | |
File: 52 Cherry Way, Hatfield, AL10 8LE Objection 03-07-2022-Redacted.pdf (0 kb) | Description: Objection - 52 Cherry Way Hatfield AL10 8LE -Redacted | Created Date: 03/07/2022 | |
Decision Notice PDF | |||
File: Decision Notice_620212492FULL.pdf (0 kb) | Description: Decision Notice | Created Date: 02/08/2022 | |
File: Acknowledgement Letter - NMA_620212492FULL.pdf (0 kb) | Description: NMA Decision Notice PDF | Created Date: 20/09/2022 | |
File: Conditions Response Letter_620212492FULL.pdf (0 kb) | Description: NMA Decision Notice PDF | Created Date: 02/03/2023 | |
Officer Report PDF | |||
File: 6-2021-2492-FULL- Derelict Garages, Hollyfield, Hatfield(1).pdf (0 kb) | Description: Committee Report | Created Date: 01/08/2022 | |
Correspondence | |||
File: HH-ISS-XX-XX-RP-C-3000 P03 SuDS report.pdf (0 kb) | Description: Amended Drainage Strategy | Created Date: 15/07/2022 | |
Land Contamination Assessment | |||
File: UK16_2182 - Phase I and II Geo-Environmental Assessment Hollyfield Garage(1).pdf (0 kb) | Description: Phase I And Ii Geo Environmental Assessment redacted | Created Date: 09/11/2021 | |
File: WS LOGS - Hollyfield Garage Site.pdf (0 kb) | Description: Borehole Details | Created Date: 25/08/2021 | |
File: UK16.2182 - Phase I and II Geo-Environmental Assessment_Hollyfield Garage...(1).pdf (0 kb) | Description: Phase I And Ii Geo Environmental Assessment redacted | Created Date: 09/11/2021 | |
Noise Impact Assessment | |||
File: 11033.RP01.ENS.0.11062021.RJB.pdf (0 kb) | Description: Noise Impact Assessment | Created Date: 25/08/2021 | |
Superseded Plans | |||
File: 1975_P500 A-Site Location Plan.pdf (0 kb) | Description: Location Plan | Created Date: 25/08/2021 | |
File: HOH-RTA-ZZ-RF-DR-A-00100 - Proposed Site Plan.pdf (0 kb) | Description: Proposed Site Plan | Created Date: 13/06/2022 | |
File: HFD-ISS-XX-XX-DR-C-3000 P03 Proposed Site Wide Drainage Strategy.pdf (0 kb) | Description: Proposed Site Wide Drainage Strategy | Created Date: 13/06/2022 | |
File: HFD-ISS-XX-XX-DR-C-3005 P01 Proposed Drainage Strategy.pdf (0 kb) | Description: Proposed Drainage Strategy | Created Date: 13/06/2022 | |
File: 0249 - Hollyfield-L001 - Planting Plan.pdf (0 kb) | Description: Revised Planting Plan | Created Date: 13/06/2022 | |
File: 0249 - Hollyfield-L001 - Planting Plan RevA.pdf (0 kb) | Description: Revised Planting Plan | Created Date: 05/07/2022 | |
File: HOH-RTA-ZZ-RF-DR-A-00100 - Proposed Site Plan.pdf (0 kb) | Description: NMA 2 Proposed Site Plan | Created Date: 03/01/2023 | |
Supporting Information | |||
File: Cover Letter Hollyfield 100821(1).pdf (0 kb) | Description: Cover Letter redacted | Created Date: 09/11/2021 | |
File: Location Plan Hollyfield Proposed Development Hatfield Hertfordshire.pdf (0 kb) | Description: Hollyfield Proposed Development | Created Date: 25/08/2021 | |
File: Sufficient Capacity Letter.pdf (0 kb) | Description: Sufficient Capacity Letter | Created Date: 25/08/2021 | |
File: Thames Water (Sewer).pdf (0 kb) | Description: Thames Water Asset Location Search | Created Date: 25/08/2021 | |
File: flood-map-planning-2021-08-06T11_23_30.953Z.pdf (0 kb) | Description: Flood Map Planning | Created Date: 25/08/2021 | |
File: Greenfield runoff rate estimation tool.pdf (0 kb) | Description: Greenfield Runoff Rate Estimation Tool | Created Date: 25/08/2021 | |
File: Surface water storage volume estimation - members only area 100821-10yrrtnperiod.pdf (0 kb) | Description: Surface Water Storage Volume Estimation | Created Date: 25/08/2021 | |
Topographical | |||
File: 51659_02_Topographic Survey RevA (25-02-21).pdf (0 kb) | Description: Topographic Survey | Created Date: 25/08/2021 | |
Tree Survey | |||
File: 551651jrJune22FV04_BS5837_AIA_Redacted.pdf (0 kb) | Description: Revised Arboricultural Impact Assessment - redacted | Created Date: 13/06/2022 |
Organisation | Name | Sent | Reply Due | Reply Received |
---|---|---|---|---|
Hertfordshire County Council - Rights of Way North | 08/11/2021 | 29/11/2021 | ||
Hertfordshire County Council - Rights of Way North | 13/06/2022 | 04/07/2022 | ||
Hertfordshire County Council - Rights of Way North | 20/07/2022 | |||
Hertfordshire County Council - Rights of Way North | 02/08/2022 | |||
Welwyn Hatfield Borough Council | Councillor Helen Quenet | 02/08/2022 | ||
Welwyn Hatfield Borough Council | Councillor Helen Quenet | 20/07/2022 | ||
Welwyn Hatfield Borough Council | Councillor Helen Quenet | 08/11/2021 | 29/11/2021 | |
Welwyn Hatfield Borough Council | Councillor Paul Zukowskyj | 08/11/2021 | 29/11/2021 | 09/11/2021 |
Welwyn Hatfield Borough Council | Councillor Paul Zukowskyj | 13/06/2022 | 04/07/2022 | |
Welwyn Hatfield Borough Council | Councillor Paul Zukowskyj | 20/07/2022 | ||
Welwyn Hatfield Borough Council | Councillor Paul Zukowskyj | 02/08/2022 | ||
Welwyn Hatfield Borough Council | Councillor Sandreni Bonfante | 13/06/2022 | 23/06/2022 | |
Welwyn Hatfield Borough Council | Councillor Teresa Travell | 08/11/2021 | 29/11/2021 | |
Welwyn Hatfield Borough Council | Councillor Teresa Travell | 02/08/2022 | ||
Welwyn Hatfield Borough Council | Councillor Teresa Travell | 20/07/2022 | ||
Welwyn Hatfield Borough Council | Councillor Teresa Travell | 13/06/2022 | 04/07/2022 | |
HCC - Rights of Way (South) | Dawn West | 20/07/2022 | ||
HCC - Rights of Way (South) | Dawn West | 02/08/2022 | ||
HCC - Rights of Way (South) | Dawn West | 08/11/2021 | 29/11/2021 | |
HCC - Rights of Way (South) | Dawn West | 13/06/2022 | 04/07/2022 | |
Lead Local Flood Authority | Fiona Lai | 20/07/2022 | ||
Lead Local Flood Authority | Fiona Lai | 17/11/2021 | 08/12/2021 | 18/11/2021 |
Lead Local Flood Authority | Fiona Lai | 13/06/2022 | 04/07/2022 | |
Lead Local Flood Authority | Fiona Lai | 02/08/2022 | ||
Hertfordshire County Council | Hertfordshire Transport Programmes & Strategy | 20/07/2022 | ||
Hertfordshire County Council | Hertfordshire Transport Programmes & Strategy | 02/08/2022 | ||
Hertfordshire County Council | Hertfordshire Transport Programmes & Strategy | 09/11/2021 | 30/11/2021 | 25/11/2021 |
Hertfordshire County Council | Hertfordshire Transport Programmes & Strategy | 13/06/2022 | 04/07/2022 | 30/06/2022 |
The Ramblers' Association | Ian Hardy | 13/06/2022 | 04/07/2022 | |
The Ramblers' Association | Ian Hardy | 08/11/2021 | 29/11/2021 | |
The Ramblers' Association | Ian Hardy | 02/08/2022 | ||
The Ramblers' Association | Ian Hardy | 20/07/2022 | ||
Hatfield Town Council | Jonah Anthony | 20/07/2022 | ||
Hatfield Town Council | Jonah Anthony | 02/08/2022 | ||
Hatfield Town Council | Jonah Anthony | 08/11/2021 | 29/11/2021 | |
Hatfield Town Council | Jonah Anthony | 13/06/2022 | 04/07/2022 | |
Welwyn Hatfield Borough Council | Landscapes Department | 13/06/2022 | 04/07/2022 | 21/06/2022 |
Welwyn Hatfield Borough Council | Landscapes Department | 09/11/2021 | 30/11/2021 | 25/01/2022 |
Welwyn Hatfield Borough Council | Landscapes Department | 02/08/2022 | ||
Welwyn Hatfield Borough Council | Landscapes Department | 20/07/2022 | ||
WHBC - Client Services | Lorraine Davis | 02/08/2022 | ||
WHBC - Client Services | Lorraine Davis | 13/06/2022 | 04/07/2022 | 14/06/2022 |
WHBC - Client Services | Lorraine Davis | 09/11/2021 | 30/11/2021 | 09/11/2021 |
WHBC - Client Services | Lorraine Davis | 20/07/2022 | ||
Hertfordshire Ecology | Martin Hicks | 13/06/2022 | 23/06/2022 | |
Hertfordshire Ecology | Martin Hicks | 17/11/2021 | 08/12/2021 | |
Hertfordshire Ecology | Martin Hicks | 20/07/2022 | ||
Hertfordshire Ecology | Martin Hicks | 02/08/2022 | ||
Environment Agency | Natasha Smith | 02/08/2022 | ||
Environment Agency | Natasha Smith | 20/07/2022 | ||
Environment Agency | Natasha Smith | 13/06/2022 | 04/07/2022 | |
Environment Agency | Natasha Smith | 09/11/2021 | 30/11/2021 | 29/11/2021 |
Thames Water, Development Control | Nicky McHugh | 09/11/2021 | 30/11/2021 | 10/11/2021 |
Thames Water, Development Control | Nicky McHugh | 13/06/2022 | 04/07/2022 | 21/07/2022 |
Thames Water, Development Control | Nicky McHugh | 20/07/2022 | ||
Thames Water, Development Control | Nicky McHugh | 02/08/2022 | ||
Welwyn Hatfield Borough Council | Parking Services | 02/08/2022 | ||
Welwyn Hatfield Borough Council | Parking Services | 13/06/2022 | 04/07/2022 | 13/07/2022 |
Welwyn Hatfield Borough Council | Planning Policy | 13/06/2022 | 04/07/2022 | |
Welwyn Hatfield Borough Council | Planning Policy | 17/11/2021 | 08/12/2021 | 26/01/2022 |
Welwyn Hatfield Borough Council | Planning Policy | 02/08/2022 | ||
Welwyn Hatfield Borough Council | Planning Policy | 20/07/2022 | ||
WHBC - Public Health and Protection | Public Health and Protection | 02/08/2022 | ||
WHBC - Public Health and Protection | Public Health and Protection | 13/06/2022 | 04/07/2022 | 01/07/2022 |
WHBC - Public Health and Protection | Public Health and Protection | 09/11/2021 | 30/11/2021 | 23/11/2021 |
WHBC - Public Health and Protection | Public Health and Protection | 20/07/2022 |
Address | Date Sent | Expiry Date | Date Reconsulted | Reconsult Expiry Date |
---|---|---|---|---|
7 Strawberry Field Hatfield | 13/06/2022 | 04/07/2022 | ||
44 Cherry Way Hatfield AL10 8LE | 09/11/2021 | 30/11/2021 | 13/06/2022 | 04/07/2022 |
46 Cherry Way Hatfield AL10 8LE | 09/11/2021 | 30/11/2021 | 13/06/2022 | 04/07/2022 |
48 Cherry Way Hatfield AL10 8LE | 09/11/2021 | 30/11/2021 | 13/06/2022 | 04/07/2022 |
50 Cherry Way Hatfield AL10 8LE | 09/11/2021 | 30/11/2021 | 13/06/2022 | 04/07/2022 |
52 Cherry Way Hatfield AL10 8LE | 13/06/2022 | 04/07/2022 | ||
52 Cherry Way Hatfield AL10 8LE | 13/06/2022 | 04/07/2022 | ||
52 Cherry Way Hatfield AL10 8LE | 13/06/2022 | 04/07/2022 | ||
52 Cherry Way Hatfield AL10 8LE | ||||
52 Cherry Way Hatfield AL10 8LE | 09/11/2021 | 30/11/2021 | 13/06/2022 | 04/07/2022 |
54 Cherry Way Hatfield AL10 8LE | 09/11/2021 | 30/11/2021 | 13/06/2022 | 04/07/2022 |
56 Cherry Way Hatfield AL10 8LE | ||||
56 Cherry Way Hatfield AL10 8LE | 09/11/2021 | 30/11/2021 | 13/06/2022 | 04/07/2022 |
58 Cherry Way Hatfield AL10 8LE | 09/11/2021 | 30/11/2021 | 13/06/2022 | 04/07/2022 |
60 Cherry Way Hatfield AL10 8LE | 09/11/2021 | 30/11/2021 | 13/06/2022 | 04/07/2022 |
62 Cherry Way Hatfield AL10 8LE | 09/11/2021 | 30/11/2021 | 13/06/2022 | 04/07/2022 |
64 Cherry Way Hatfield AL10 8LD | 09/11/2021 | 30/11/2021 | 13/06/2022 | 04/07/2022 |
17 Hollyfield Hatfield AL10 8LW | 09/11/2021 | 30/11/2021 | 13/06/2022 | 04/07/2022 |
19 Hollyfield Hatfield AL10 8LW | 09/11/2021 | 30/11/2021 | 13/06/2022 | 04/07/2022 |
21 Hollyfield Hatfield AL10 8LW | 09/11/2021 | 30/11/2021 | 13/06/2022 | 04/07/2022 |
23 Hollyfield Hatfield AL10 8LW | 09/11/2021 | 30/11/2021 | 13/06/2022 | 04/07/2022 |
25 Hollyfield Hatfield AL10 8LW | 09/11/2021 | 30/11/2021 | 13/06/2022 | 04/07/2022 |
27 Hollyfield Hatfield AL10 8LW | 09/11/2021 | 30/11/2021 | 13/06/2022 | 04/07/2022 |
29 Hollyfield Hatfield AL10 8LW | 09/11/2021 | 30/11/2021 | 13/06/2022 | 04/07/2022 |
31 Hollyfield Hatfield AL10 8LW | 09/11/2021 | 30/11/2021 | 13/06/2022 | 04/07/2022 |
1 Old Leys Hatfield AL10 8LR | 09/11/2021 | 30/11/2021 | 13/06/2022 | 04/07/2022 |
2 Old Leys Hatfield AL10 8LR | 09/11/2021 | 30/11/2021 | 13/06/2022 | 04/07/2022 |
3 Old Leys Hatfield AL10 8LR | 09/11/2021 | 30/11/2021 | 13/06/2022 | 04/07/2022 |
4 Old Leys Hatfield AL10 8LR | 09/11/2021 | 30/11/2021 | 13/06/2022 | 04/07/2022 |
Kingdom Hall Of Jehovahs Witnesses 2-4 Hollyfield Hatfield AL10 8LW | 09/11/2021 | 30/11/2021 | 13/06/2022 | 04/07/2022 |
7 Strawberry Field Hatfield AL10 8LS | 09/11/2021 | 30/11/2021 | 13/06/2022 | 04/07/2022 |
Application Number | Proposal | Decision | Distance |
---|---|---|---|
6/2024/0877/COND | Submission of details pursuant to condition 15 (New access), condition 16 (Closure of existing access), condition 19 (External lighting) and condition 24 (Drainage management and maintenance) on planning permission 6/2021/2492/FULL | Granted | 0 |
6/2023/1002/COND | Submission of details pursuant to condition 21 (asbestos) on planning permission 6/2021/2492/FULL | Granted | 0 |
6/2023/0485/COND | Submission of details pursuant of condition 21 (asbestos) on planning permission 6/2021/2492/FULL | Refused | 0 |
6/2023/0305/COND | Submission of details pursuant to condition 1 (Construction Traffic Management Plan) on planning permission 6/2021/2492/FULL | Granted | 0 |
6/2022/2272/COND | Submission of details pursuant to condition 3 (Landscape and Ecological Management Plan), 4 (Landscaping Scheme), 5 (Landscape Management Plan), 6 (Sound Insulation), 7 (Materials), 8 (Refuse and Recycling), 9 (Cycle Storage), 10 (Energy & Sustainability), 11 (EV Charging Facilities), 12 (Renewable energy), 13 (Acccessible and adaptable homes) and 14 (fire hydrant) | Granted | 0 |
6/2022/2057/COND | Submission of details pursuant to the discharge of Condition 1 (Construction Management Plan), Condition 2 (Tree Protection) and Condition 3 (Arboricultural Method Statement) on planning reference 6/2021/2492/FULL | Part Approved / Part Refused | 0 |
6/2022/0826/PN14 | To enable commencement of the development of the site ref: 6/2021/2492/FULL | Prior Approval Required and Granted | 0 |
S6/2006/0754/FP | SINGLE STOREY FRONT AND REAR EXTENSIONS | Granted | 0 |
S6/2005/0542/FP | PROPOSED REAR CONSERVATORY | Refused | 0 |
H/1998/5288/EM | Erection of general workshop for hobbies and games room | Granted | 0 |
H/1995/5403/EM | Erection of front porch | Granted | 0 |
S6/1989/0705/FP | Single storey side and rear extension | Granted | 0 |
S6/1987/0277/FP | Single storey front extension to form porch | Granted | 0 |
Reference Number | Description | Validated Date | Expiry Date | Reason For Change | Officer | Decision | Decision Date |
---|---|---|---|---|---|---|---|
6/2021/2492/NMA | Removal of Condition 25 | 22/08/2022 | 19/09/2022 | It is considered that Condition 25 is not necessary or reasonable and it fails the tests outlined under paragraph 56 of the NPPF | Ms Ashley Ransome | Granted | 22/09/2022 |
6/2021/2492/NMA2 | Removal of car ports (except plots 5 and 6 which will remain) | 03/01/2023 | 31/01/2023 | The car ports are to be removed, except for plots 5 and 6, offering more spacious external parking spaces for residents | Ms Ashley Ransome | Granted | 02/03/2023 |