Return to search results
-
Start a new search
- The consultation period for this application has now closed
Planning Application: 6/2021/2125/MAJ
MAJOR DEVELOPMENT
|
Decided - Granted
|
Ms Louise Sahlke
|
l.sahlke@welhat.gov.uk
|
Hertfordshire Constabulary Stanborough Road Welwyn Garden City AL8 6XF
|
Partial redevelopment of the Hertfordshire Constabulary Headquarters site
|
523142
|
211289
|
|
|
|
100081157512
|
14/07/2021
|
14/07/2021
|
25/08/2021
|
17/08/2021
|
23/02/2022
|
|
Mr Mark Chandler
|
Ian Potter
|
Vincent and Gorbing
Sterling Court
Norton Road
Stevenage
SG1 2JY
|
Stanborough Road
Welwyn Garden City
AL8 6XF
|
Description | Distance |
---|---|
Conservation Area | 0.00 |
Green Belt | 0.00 |
Landscape Character Area | 0.00 |
Parish | 98.92 |
Rights of Way | 46.39 |
Rights of Way | 0.39 |
Urban Open Land | 0.00 |
Cycle Paths | 7.47 |
Flood Zone Surface Water 30mm | 0.00 |
Flood Zone Surface Water 30mm | 0.00 |
Flood Zone Surface Water 30mm | 0.00 |
Flood Zone Surface Water 30mm | 0.00 |
Flood Zone Surface Water 30mm | 0.00 |
Flood Zone Surface Water 100mm | 0.00 |
Flood Zone Surface Water 100mm | 0.00 |
Flood Zone Surface Water 100mm | 0.00 |
Flood Zone Surface Water 100mm | 0.00 |
Flood Zone Surface Water 100mm | 0.00 |
Flood Zone Surface Water 100mm | 0.00 |
Flood Zone Surface Water 100mm | 0.00 |
Flood Zone Surface Water 100mm | 0.00 |
Flood Zone Surface Water 100mm | 0.00 |
Flood Zone Surface Water 1000mm | 0.00 |
Flood Zone Surface Water 1000mm | 0.00 |
Flood Zone Surface Water 1000mm | 0.00 |
Flood Zone Surface Water 1000mm | 0.00 |
Flood Zone Surface Water 1000mm | 0.00 |
Flood Zone Surface Water 1000mm | 0.00 |
Flood Zone Surface Water 1000mm | 0.00 |
Flood Zone Surface Water 1000mm | 0.00 |
Flood Zone Surface Water 1000mm | 0.00 |
Flood Zone Surface Water 1000mm | 0.00 |
Flood Zone Surface Water 1000mm | 0.00 |
Flood Zone Surface Water 1000mm | 0.00 |
Flood Zone Surface Water 1000mm | 0.00 |
Flood Zone Surface Water 1000mm | 0.00 |
Flood Zone Surface Water 1000mm | 0.00 |
Flood Zone Surface Water 1000mm | 0.00 |
Flood Zone Surface Water 1000mm | 0.00 |
Flood Zone Surface Water 1000mm | 0.00 |
Flood Zone Surface Water 1000mm | 0.00 |
Flood Zone Surface Water 1000mm | 0.00 |
Flood Zone Surface Water 1000mm | 0.00 |
Flood Zone Surface Water 1000mm | 0.00 |
Flood Zone Surface Water 1000mm | 0.00 |
Flood Zone Surface Water 1000mm | 0.00 |
Flood Zone Surface Water 1000mm | 0.00 |
Flood Zone Surface Water 1000mm | 0.00 |
Flood Zone Surface Water 1000mm | 0.00 |
Flood Zone Surface Water 1000mm | 0.00 |
Flood Zone Surface Water 1000mm | 0.00 |
Flood Zone Surface Water 1000mm | 0.00 |
Flood Zone Surface Water 1000mm | 0.00 |
Flood Zone Surface Water 1000mm | 0.00 |
Flood Zone Surface Water 1000mm | 0.00 |
Flood Zone Surface Water 1000mm | 0.00 |
Flood Zone Surface Water 1000mm | 0.00 |
Flood Zone Surface Water 1000mm | 0.00 |
Flood Zone Surface Water 1000mm | 0.00 |
Flood Zone Surface Water 1000mm | 0.00 |
Flood Zone Surface Water 1000mm | 0.00 |
Flood Zone Surface Water 1000mm | 0.00 |
Flood Zone Surface Water 1000mm | 0.00 |
Flood Zone Surface Water 1000mm | 0.00 |
Flood Zone Surface Water 1000mm | 0.00 |
Flood Zone Surface Water 1000mm | 0.00 |
Flood Zone Surface Water 1000mm | 0.00 |
Flood Zone Surface Water 1000mm | 0.00 |
Hertfordshire Ecological Network | 0.00 |
Hertfordshire Ecological Network | 0.00 |
Hertfordshire Ecological Network | 0.00 |
Hertfordshire Ecological Network | 0.00 |
Sand and Gravel Belt | 0.00 |
Hatfield Heritage Assesment Areas | 0.00 |
Granted
|
28/06/2022
|
28/06/2022
|
Delegated
|
|
To download a selection of individual documents place a tick alongside each of the relevant rows and then click on Download selected files. To download all of the documents place a tick in the box alongside the header row and all of the files will be selected, then click on Download selected files. To view individual documents click on the File for the required row.
File | Description | Date Uploaded | |
---|---|---|---|
Application Form - Without Personal Information | |||
File: ApplicationFormRedacted.pdf (0 kb) | Description: Application form redacted | Created Date: 14/07/2021 | |
Block Plan | |||
File: HCHQ-VGA-XX-XX-DR-AR-00105-PL01 Existing Site Plan.pdf (0 kb) | Description: Existing Site Plan Hertfordshire Constabulary HQ | Created Date: 14/07/2021 | |
File: HCHQ-VGA-XX-XX-DR-AR-00106-PL01 Existing Site Plan-Gosling.pdf (0 kb) | Description: Existing Site Plan Gosling Sports Park | Created Date: 14/07/2021 | |
File: HCHQ-VGA-XX-XX-DR-AR-00107-PL01 Existing Site Plan Demolition.pdf (0 kb) | Description: Existing Site Plan Buildings Identified for Demolition | Created Date: 14/07/2021 | |
File: HCHQ-VGA-XX-XX-DR-AR-00113-PL01_Proposed Site Plan - Masterplan Strategy.pdf (0 kb) | Description: Proposed Site Plan Masterplan Strategy | Created Date: 14/07/2021 | |
File: HCHQ-VGA-XX-XX-DR-AR-00114-PL01 Proposed Site Plan-Complete.pdf (0 kb) | Description: Proposed Overall Site Plan | Created Date: 14/07/2021 | |
File: HCHQ-VGA-XX-XX-DR-AR-00115-PL01 Proposed Site Plan_Phase 3_Complete.pdf (0 kb) | Description: Proposed Site Plan Phase 3 Complete | Created Date: 14/07/2021 | |
File: HCHQ-VGA-XX-XX-DR-AR-00116-PL01 Proposed Site Plan_Phase 1_Decant Building.pdf (0 kb) | Description: Proposed Site Plan Phase 1 Decant Building | Created Date: 14/07/2021 | |
File: HCHQ-VGA-XX-XX-DR-AR-00117-PL01 Proposed Site Plan_Phase 2_HQ Building.pdf (0 kb) | Description: Proposed Site Plan Phase 2 Headquarters Building | Created Date: 14/07/2021 | |
File: HCHQ-VGA-XX-XX-DR-AR-00118-PL01 Proposed Site Plan_Phase 1_Gosling Access.pdf (0 kb) | Description: Proposed Site Plan Gosling Sports Park (Phase 1) | Created Date: 14/07/2021 | |
File: HCHQ-VGA-EW-XX-DR-AR-00375-PL01 Dog Unit Existing Block Plan.pdf (0 kb) | Description: Dog Unit- Existing Block Plan | Created Date: 14/07/2021 | |
File: HCHQ-VGA-EW-XX-DR-AR-00376-PL01 Dog Unit Proposed Block Plan.pdf (0 kb) | Description: Dog Unit Proposed Block Plan | Created Date: 14/07/2021 | |
File: HCHQ-VGA-EW-XX-DR-AR-00540-PL01 Temp Kitchen and Canteen Proposed site plan.pdf (0 kb) | Description: Temporary Kitchen and Canteen Existing and Proposed Site Plan extracts | Created Date: 14/07/2021 | |
File: HCHQ-VGA-EW-XX-DR-AR-00580-PL01 E+F Building Existing Block Plan.pdf (0 kb) | Description: Estates & Facilities Building Existing Block Plan | Created Date: 14/07/2021 | |
File: HCHQ-VGA-EW-XX-DR-AR-00581-PL01 E+F Building Proposed Block Plan - Phase 1.pdf (0 kb) | Description: Estates & Facilities Building Proposed Block Plan Phase 1 (to illustrate position of Estates & Facilities only) | Created Date: 14/07/2021 | |
File: HCHQ-VGA-EW-XX-DR-AR-00582-PL01 E+F Building Proposed Block Plan - Complete.pdf (0 kb) | Description: Estate & Facilities Building Proposed Block Plan Complete | Created Date: 14/07/2021 | |
File: HCHQ-VGA-XX-XX-DR-AR-00101-PL01 Existing Site Block Plan.pdf (0 kb) | Description: Existing Site Block Plan | Created Date: 14/07/2021 | |
File: Proposed block plan.pdf (0 kb) | Description: Enabling works Estates and Facilities Proposed Block Plan | Created Date: 19/07/2021 | |
File: Existing block plan 00375.pdf (0 kb) | Description: Enabling works Proposed Dog Unit Location Existing Block Plan | Created Date: 19/07/2021 | |
File: Proposed block plan 00376.pdf (0 kb) | Description: Enabling works Proposed Dog Unit Proposed Block Plan | Created Date: 19/07/2021 | |
File: Existing block plan 00580.pdf (0 kb) | Description: Enabling works Estates and Facilities Building | Created Date: 19/07/2021 | |
File: Proposed block plan 00581.pdf (0 kb) | Description: Enabling works Estates and Facilities | Created Date: 19/07/2021 | |
File: Proposed block plan 00582.pdf (0 kb) | Description: Enabling works Estates and Facilities | Created Date: 19/07/2021 | |
Elevation and Floor Plans | |||
File: HCHQ-VGA-MS-XX-DR-AR-00166-PL01 MSU-Beacon existing floor plan and elevations.pdf (0 kb) | Description: MSU Beacon Building Existing Floor Plan & Elevations | Created Date: 14/07/2021 | |
File: HCHQ-VGA-FB-XX-DR-AR-00167-PL01 Faraday existing floor plan and elevations.pdf (0 kb) | Description: Faraday Building Existing Floor Plan & Elevations | Created Date: 14/07/2021 | |
File: HCHQ-VGA-OY-XX-DR-AR-00168-PL01 Odsey existing floor plan and elevations.pdf (0 kb) | Description: Odsey Block Existing Floor Plan & Elevations | Created Date: 14/07/2021 | |
File: HCHQ-VGA-DU-XX-DR-AR-00169-PL01 Dog Unit existing floor plan and elevations.pdf (0 kb) | Description: Dog Unit Existing Floor Plan & Elevations | Created Date: 14/07/2021 | |
File: HCHQ-VGA-AL-XX-DR-AR-00170-PL01 Alban existing floor plan and elevations.pdf (0 kb) | Description: Alban Block- Existing Floor Plan & Elevations | Created Date: 14/07/2021 | |
File: HCHQ-VGA-TL-XX-DR-AR-00173-PL01 The Lodge existing floor plans and elevations.pdf (0 kb) | Description: The Lodge Existing Floor Plans & Elevations | Created Date: 14/07/2021 | |
File: HCHQ-VGA-FL-XX-DR-AR-00174-PL01 Fleet garages existing floor plan and elevations.pdf (0 kb) | Description: Fleet Garages Existing Floor Plans & Elevations | Created Date: 14/07/2021 | |
Elevations | |||
File: HCHQ-VGA-MB-XX-DR-AR-00154-PL01 Main Building existing elevations sheet 1 of 2.pdf (0 kb) | Description: Main Administration Building Existing Elevations Sheet 1 of 2 | Created Date: 14/07/2021 | |
File: HCHQ-VGA-MB-XX-DR-AR-00155-PL01 Main Building existing elevations sheet 2 of 2.pdf (0 kb) | Description: Main Administration Building Existing Elevations Sheet 2 of 2 | Created Date: 14/07/2021 | |
File: HCHQ-VGA-RO-XX-DR-AR-00158-PL01 Robertson existing elevations.pdf (0 kb) | Description: Robertson Building Existing Elevations | Created Date: 14/07/2021 | |
File: HCHQ-VGA-BR-XX-DR-AR-00160-PL01 Braughing existing elevations.pdf (0 kb) | Description: Braughing Building Existing Elevations | Created Date: 14/07/2021 | |
File: HCHQ-VGA-HH-XX-DR-AR-00164-PL01 HHD existing elevations sheet 1 of 2.pdf (0 kb) | Description: Hertford, Hitchin & Dacorum Building Existing Elevations Sheet 1 of 2 | Created Date: 14/07/2021 | |
File: HCHQ-VGA-HH-XX-DR-AR-00165-PL01 HHD existing elevations sheet 2 of 2.pdf (0 kb) | Description: Hertford, HItchin & Dacorum Building Existing Elevations Sheet 2 of 2 | Created Date: 14/07/2021 | |
File: HCHQ-VGA-PS-XX-DR-AR-00172-PL01 Peter Sharpe existing elevations.pdf (0 kb) | Description: The Peter Sharp Building Existing Elevations | Created Date: 14/07/2021 | |
File: HCHQ-VGA-FL-XX-DR-AR-00177-PL01 Fleet services existing elevations.pdf (0 kb) | Description: Fleet Services Building Existing Elevations | Created Date: 14/07/2021 | |
File: HCHQ-VGA-CM-XX-DR-AR-00181-PL01 CM existing elevations.pdf (0 kb) | Description: Crime Management Building Existing Elevations | Created Date: 14/07/2021 | |
File: HCHQ-VGA-OB-XX-DR-AR-00184-PL01 OSB energy existing elevations sheet 1 of 2.pdf (0 kb) | Description: OSB and Energy Building Existing Elevations Sheet 1 of 2 | Created Date: 14/07/2021 | |
File: HCHQ-VGA-OB-XX-DR-AR-00185-PL01 OSB energy existing elevations sheet 2 of 2.pdf (0 kb) | Description: OSB and Energy Building Existing Elevations Sheet 2 of 2 | Created Date: 14/07/2021 | |
File: HCHQ-VGA-CT-XX-DR-AR-00187-PL01 Comms tower elevations Sheet 1 of 2.pdf (0 kb) | Description: Comms Tower and Plant Existing Elevations Sheet 1 of 2 | Created Date: 14/07/2021 | |
File: HCHQ-VGA-CT-XX-DR-AR-00188-PL01 Comms tower elevations Sheet 2 of 2.pdf (0 kb) | Description: Comms Tower and Plant Existing Elevations Sheet 2 of 2 | Created Date: 14/07/2021 | |
File: HCHQ-VGA-HQ-ZZ-DR-AR-00260-PL01 Headquarters Building Proposed Elevations Sheet 1 of 5.pdf (0 kb) | Description: Headquarters Building Proposed Elevations Sheet 1 of 5 | Created Date: 14/07/2021 | |
File: HCHQ-VGA-HQ-ZZ-DR-AR-00261-PL01 Headquarters Building Proposed Elevations Sheet 2 of 5.pdf (0 kb) | Description: Headquarters Building Proposed Elevations Sheet 2 of 5 | Created Date: 14/07/2021 | |
File: HCHQ-VGA-HQ-ZZ-DR-AR-00262-PL01 Headquarters Building Proposed Elevations Sheet 3 of 5.pdf (0 kb) | Description: Headquarters Building Proposed Elevations Sheet 3 of 5 | Created Date: 14/07/2021 | |
File: HCHQ-VGA-HQ-ZZ-DR-AR-00263-PL01 Headquarters Building Proposed Elevations Sheet 4 of 5.pdf (0 kb) | Description: Headquarters Building Proposed Elevations Sheet 4 of 5 | Created Date: 14/07/2021 | |
File: HCHQ-VGA-HQ-ZZ-DR-AR-00264-PL01 Headquarters Building Proposed Elevations Sheet 5 of 5.pdf (0 kb) | Description: Headquarters Building Proposed Elevations Sheet 5 of 5 | Created Date: 14/07/2021 | |
File: HCHQ-VGA-EW-XX-DR-AR-00379-PL01 Dog Unit Building Proposed Elevations.pdf (0 kb) | Description: Dog Unit Office and Welfare Building Proposed Elevations | Created Date: 14/07/2021 | |
File: HCHQ-VGA-EW-XX-DR-AR-00382-PL01 Dog Unit Kennels Proposed Elevations and Section.pdf (0 kb) | Description: Dog Unit Kennel Building and Compound Proposed Elevations & Section | Created Date: 14/07/2021 | |
File: HCHQ-VGA-EW-XX-DR-AR-00542-PL01 Temp Kitchen and Canteen Proposed Elevations.pdf (0 kb) | Description: Temporary Kitchen and Canteen Proposed Elevations | Created Date: 14/07/2021 | |
File: HCHQ-VGA-EW-XX-DR-AR-00585-PL01 E+F Building Proposed Elevations.pdf (0 kb) | Description: Estate & Facilities Building Proposed Elevations | Created Date: 14/07/2021 | |
File: HCHQ-VGA-HN-ZZ-DR-AR-00681-PL01 North Decant Building Proposed Elevations Sheet 1 of 4.pdf (0 kb) | Description: North Decant Building Proposed Elevations Sheet 1 of 4 | Created Date: 14/07/2021 | |
File: HCHQ-VGA-HN-ZZ-DR-AR-00682-PL01 North Decant Building Proposed Elevations Sheet 2 of 4.pdf (0 kb) | Description: North Decant Building Proposed Elevations Sheet 2 of 4 | Created Date: 14/07/2021 | |
File: HCHQ-VGA-HN-ZZ-DR-AR-00683-PL01 North Decant Building Proposed Elevations Sheet 3 of 4.pdf (0 kb) | Description: North Decant Building Proposed Elevations Sheet 3 of 4 | Created Date: 14/07/2021 | |
File: HCHQ-VGA-HN-ZZ-DR-AR-00684-PL01 North Decant Building Proposed Elevations Sheet 4 of 4.pdf (0 kb) | Description: North Decant Building Proposed Elevations Sheet 4 of 4 | Created Date: 14/07/2021 | |
Floor Plans | |||
File: HCHQ-VGA-MB-LG-DR-AR-00150-PL01 Main Building existing floor plans sheet 1 of 4.pdf (0 kb) | Description: Main Administration Building Existing Floor Plans Sheet 1 of 4 | Created Date: 14/07/2021 | |
File: HCHQ-VGA-MB-00-DR-AR-00151-PL01 Main Building existing floor plans sheet 2 of 4.pdf (0 kb) | Description: Main Administration Building Existing Floor Plans Sheet 2 of 4 | Created Date: 14/07/2021 | |
File: HCHQ-VGA-MB-01-DR-AR-00152-PL01 Main Building existing floor plans sheet 3 of 4.pdf (0 kb) | Description: Main Administration Building Existing Floor Plans Sheet 3 of 4 | Created Date: 14/07/2021 | |
File: HCHQ-VGA-MB-02-DR-AR-00153-PL01 Main Building existing floor plans sheet 4 of 4.pdf (0 kb) | Description: Main Administration Building Existing Floor Plans Sheet 4 of 4 | Created Date: 14/07/2021 | |
File: HCHQ-VGA-RO-00-DR-AR-00156-PL01 Robertson existing floor plans sheet 1 of 2.pdf (0 kb) | Description: Roberton Building Existing Floor Sheet 1 of 2 | Created Date: 14/07/2021 | |
File: HCHQ-VGA-RO-01-DR-AR-00157-PL01 Robertson existing floor plans sheet 2 of 2.pdf (0 kb) | Description: Robertson Building Existing Floor Sheet 2 of 2 | Created Date: 14/07/2021 | |
File: HCHQ-VGA-BR-00-DR-AR-00159-PL01 Braughing existing floor plan.pdf (0 kb) | Description: Braughing Building Existing Floor Plan | Created Date: 14/07/2021 | |
File: HCHQ-VGA-HH-00-DR-AR-00161-PL01 HHD existing floor plans sheet 1 of 3.pdf (0 kb) | Description: Hertford, Hitchin & Dacorum Building Existing Floor Plans Sheet 1 of 3 | Created Date: 14/07/2021 | |
File: HCHQ-VGA-HH-01-DR-AR-00162-PL01 HHD existing floor plans sheet 2 of 3.pdf (0 kb) | Description: Hertford, Hitchin & Dacorum Building Existing Floor Plans Sheet 2 of 3 | Created Date: 14/07/2021 | |
File: HCHQ-VGA-HH-02-DR-AR-00163-PL01 HHD existing floor plans sheet 3 of 3.pdf (0 kb) | Description: Hertford, Hitchin & Dacorum Building Existing Floor Plans Sheet 3 of 3 | Created Date: 14/07/2021 | |
File: HCHQ-VGA-PS-00-DR-AR-00171-PL01 Peter Sharpe existing floor plan.pdf (0 kb) | Description: The Peter Sharp Building Existing Floor Plan | Created Date: 14/07/2021 | |
File: HCHQ-VGA-FL-00-DR-AR-00175-PL01 Fleet services existing floor plans sheet 1 of 2.pdf (0 kb) | Description: Fleet Services Building Existing Floor Sheet 1 of 2 | Created Date: 14/07/2021 | |
File: HCHQ-VGA-FL-01-DR-AR-00176-PL01 Fleet services existing floor plans sheet 2 of 2.pdf (0 kb) | Description: Fleet Services Building Existing Floor Plans Sheet 2 of 2 | Created Date: 14/07/2021 | |
File: HCHQ-VGA-CM-00-DR-AR-00178-PL01 CM existing floor plans Sheet 1 of 3.pdf (0 kb) | Description: Crime Management Building Existing Floor Plans Sheet 1 of 3 | Created Date: 14/07/2021 | |
File: HCHQ-VGA-CM-01-DR-AR-00179-PL01 CM existing floor plans Sheet 2 of 3.pdf (0 kb) | Description: Crime Management Building Existing Floor Plans Sheet 2 of 3 | Created Date: 14/07/2021 | |
File: HCHQ-VGA-CM-02-DR-AR-00180-PL01 CM existing floor plans Sheet 3 of 3.pdf (0 kb) | Description: Crime Management Building Existing Floor Plans Sheet 3 of 3 | Created Date: 14/07/2021 | |
File: HCHQ-VGA-OB-00-DR-AR-00182-PL01 OSB existing floor plans sheet 1 of 2.pdf (0 kb) | Description: OSB and Energy Building Existing Floor Plans Sheet 1 of 2 | Created Date: 14/07/2021 | |
File: HCHQ-VGA-OB-01-DR-AR-00183-PL01 OSB existing floor plans sheet 2 of 2.pdf (0 kb) | Description: OSB and Energy Building Existing Floor Plans Sheet 2 of 2 | Created Date: 14/07/2021 | |
File: HCHQ-VGA-CT-00-DR-AR-00186-PL01 Comms tower existing floor plan.pdf (0 kb) | Description: Comms Tower and Plant Existing Floor Plan | Created Date: 14/07/2021 | |
File: HCHQ-VGA-HQ-LG-DR-AR-00249-PL01 Headquarters Building Proposed Lower Ground Floor Plan.pdf (0 kb) | Description: Headquarters Building Proposed Lower Ground Floor Plan | Created Date: 14/07/2021 | |
File: HCHQ-VGA-HQ-00-DR-AR-00250-PL01 Headquarters Building Proposed Ground Floor Plan.pdf (0 kb) | Description: Headquarters Building Proposed Ground Floor Plan | Created Date: 14/07/2021 | |
File: HCHQ-VGA-HQ-01-DR-AR-00251-PL01 Headquarters Building Proposed First Floor Plan.pdf (0 kb) | Description: Headquarters Building Proposed First Floor Plan | Created Date: 14/07/2021 | |
File: HCHQ-VGA-HQ-02-DR-AR-00252-PL01 Headquarters Building Proposed Second Floor Plan.pdf (0 kb) | Description: Headquarter Building Proposed Second Floor Plan | Created Date: 14/07/2021 | |
File: HCHQ-VGA-HQ-03-DR-AR-00253-PL01 Headquarters Building Proposed Third Floor Plan.pdf (0 kb) | Description: Headquarters Building Proposed Third Floor Plan | Created Date: 14/07/2021 | |
File: HCHQ-VGA-HQ-RF-DR-AR-00254-PL01 Headquarters Building Proposed Roof Plan.pdf (0 kb) | Description: Headquarters Building Proposed Roof Plan | Created Date: 14/07/2021 | |
File: HCHQ-VGA-EW-00-DR-AR-00377-PL01 Dog Unit Building Proposed GFP.pdf (0 kb) | Description: Dog Unit Office and Welfare Building Proposed Floor Plan | Created Date: 14/07/2021 | |
File: HCHQ-VGA-EW-RF-DR-AR-00378-PL01 Dog Unit Building Proposed RP.pdf (0 kb) | Description: Dog Unit Office and Welfare Building Proposed Roof Plan | Created Date: 14/07/2021 | |
File: HCHQ-VGA-EW-00-DR-AR-00380-PL01 Dog Unit Kennels Proposed GFP.pdf (0 kb) | Description: Dog Unit Kennel Building and Compound Proposed Floor Plan | Created Date: 14/07/2021 | |
File: HCHQ-VGA-EW-RF-DR-AR-00381-PL01 Dog Unit Kennels Proposed RP.pdf (0 kb) | Description: Dog Unit Kennel Building and Compound Proposed Roof Plan | Created Date: 14/07/2021 | |
File: HCHQ-VGA-EW-ZZ-DR-AR-00541-PL01 Temp Kitchen and Canteen Proposed GFP and RP.pdf (0 kb) | Description: Temporary Kitchen and Canteen Proposed Floor Plan & Roof Plan | Created Date: 14/07/2021 | |
File: HCHQ-VGA-EW-00-DR-AR-00583-PL01 E+F Building Proposed GFP.pdf (0 kb) | Description: Estates & Facilities Building Proposed Floor Plan | Created Date: 14/07/2021 | |
File: HCHQ-VGA-HN-ZZ-DR-AR-00650-PL01 North Decant Building Proposed lower ground and ground floor plans.pdf (0 kb) | Description: North Decant Building Proposed Lower Ground & Ground Floor | Created Date: 14/07/2021 | |
File: HCHQ-VGA-HN-ZZ-DR-AR-00651-PL01 North Decant Building Proposed First Floor Second Floor and Roof Plan.pdf (0 kb) | Description: North Decant Building Proposed First Floor, Second Floor and Roof Plan | Created Date: 14/07/2021 | |
Landscape Plans | |||
File: HCHQ-VGA-XX-XX-DR-AR-00122-PL01 Proposed Site Landscaping Plan.pdf (0 kb) | Description: Proposed Site Landscaping Plan | Created Date: 14/07/2021 | |
Location Plan | |||
File: HCHQ-VGA-XX-XX-DR-AR-00100-PL01 Site Location Plan.pdf (0 kb) | Description: Site Location Plan | Created Date: 14/07/2021 | |
Plans | |||
File: HCHQ-ACM-XX-XX-RP-CE-000002_Appendix B.1.pdf (0 kb) | Description: Appendix B Design Drawings | Created Date: 14/07/2021 | |
File: HCHQ-ACM-XX-XX-RP-CE-000002_Appendix A.1.pdf (0 kb) | Description: Appendix A.1 Background Drawings | Created Date: 14/07/2021 | |
File: HCHQ Travel Plan_Appendix D - 1.pdf (0 kb) | Description: Appendix D Scheme Drawings | Created Date: 14/07/2021 | |
File: HCHQ_TA_Appendix A - 1.pdf (0 kb) | Description: Appendix A Scheme Drawings | Created Date: 14/07/2021 | |
File: HCHQ-VGA-HQ-XX-MR-AR-00290-PL01 Headquarters Visual - Public approach.pdf (0 kb) | Description: Headquarters Visual Approach to Public Enterance | Created Date: 14/07/2021 | |
File: HCHQ-ACM-XX-XX-RP-CE-000001_Appendix A.1.pdf (0 kb) | Description: Existing Drainage Layout | Created Date: 14/07/2021 | |
File: HCHQ-ACM-XX-XX-RP-CE-000001_Appendix A.2.pdf (0 kb) | Description: Existing Catchment Plan | Created Date: 14/07/2021 | |
File: HCHQ-ACM-XX-XX-RP-CE-000001_Appendix B.1.pdf (0 kb) | Description: Sitewide Drainage Strategy | Created Date: 14/07/2021 | |
File: HCHQ-ACM-XX-XX-RP-CE-000001_Appendix B.2.pdf (0 kb) | Description: Proposed Site Plan Phase 2 Headquarters Building | Created Date: 14/07/2021 | |
File: HCHQ-ACM-XX-XX-RP-CE-000001_Appendix B.3.pdf (0 kb) | Description: Proposed SuDS Sections | Created Date: 14/07/2021 | |
File: HCHQ-ACM-XX-XX-RP-CE-000001_Appendix B.4.pdf (0 kb) | Description: Existing Catchment Plan | Created Date: 14/07/2021 | |
File: HCHQ-ACM-XX-XX-RP-CE-000001_Appendix B.5.pdf (0 kb) | Description: Proposed Catchment Plan | Created Date: 14/07/2021 | |
File: Existing catchment plan.pdf (0 kb) | Description: Existing catchment plan | Created Date: 19/07/2021 | |
File: Proposed catchment plan.pdf (0 kb) | Description: Proposed catchment plan | Created Date: 19/07/2021 | |
File: HCHQ-VGA-HQ-ZZ-DR-AR-02100-P03 Headquarters Proposed Fire Strategy - Site Plan.pdf (0 kb) | Description: Headquarters Building Proposed Fire Strategy - Site Plan | Created Date: 17/03/2022 | |
Site Sections | |||
File: HCHQ-VGA-XX-XX-DR-AR-00108-PL01 Existing Site Sections sheet 1 of 3.pdf (0 kb) | Description: Existing Site Sections Sheet 1 of 3 | Created Date: 14/07/2021 | |
File: HCHQ-VGA-XX-XX-DR-AR-00109-PL01 Existing Site Sections sheet 2 of 3.pdf (0 kb) | Description: Existing Site Sections Sheet 2 of 3 | Created Date: 14/07/2021 | |
File: HCHQ-VGA-XX-XX-DR-AR-00125-PL01 Proposed Site Sections Sheet 1 of 3.pdf (0 kb) | Description: Proposed Site Sections Sheet 1 of 3 | Created Date: 14/07/2021 | |
File: HCHQ-VGA-XX-XX-DR-AR-00126-PL01 Proposed Site Sections Sheet 2 of 3.pdf (0 kb) | Description: Proposed Site Sections Sheet 2 of 3 | Created Date: 14/07/2021 | |
File: HCHQ-VGA-XX-XX-DR-AR-00127-PL01 Proposed Site Sections Sheet 3 of 3.pdf (0 kb) | Description: Proposed Site Sections Sheet 3 of 3 | Created Date: 14/07/2021 | |
File: HCHQ-VGA-HQ-ZZ-DR-AR-00270-PL01 Headquarters Building Proposed Sections.pdf (0 kb) | Description: Headquarters Building Proposed Sections | Created Date: 14/07/2021 | |
File: HCHQ-VGA-EW-XX-DR-AR-00383-PL01 Dog Unit Building Proposed Sections.pdf (0 kb) | Description: Dog Unit Office and Welfare Building Proposed Sections | Created Date: 14/07/2021 | |
File: HCHQ-VGA-EW-XX-DR-AR-00586-PL01 E+F Building Proposed Sections.pdf (0 kb) | Description: Estates & Facilities Building Proposed Sections | Created Date: 14/07/2021 | |
File: HCHQ-VGA-HN-ZZ-DR-AR-00665-PL01 North Decant Building Proposed Sections.pdf (0 kb) | Description: North Decant Building Proposed Sections | Created Date: 14/07/2021 | |
Design & Access Statement | |||
File: 7645-HCHQ-VGA-XX-XX-RP-AR-00 805_PL01_Design and Access(1).pdf (0 kb) | Description: Design and Access Statement Redacted | Created Date: 16/07/2021 | |
Landscape Report | |||
File: 7645_Landscape and Visual Assessment_PL01_090721 Part 2 of 2.pdf (0 kb) | Description: Landscape And Visual Assessment Pl01 090721 Part 2 Of 2 | Created Date: 14/07/2021 | |
File: 7645_Landscape and Visual Assessment_PL01_090721 Part 2 of 2(1).pdf (0 kb) | Description: Landscape And Visual Assessment Pl01 090721 Part 2 Of 2 redacted | Created Date: 16/07/2021 | |
File: 7645_Landscape and Visual Assessment_PL01_090721 Part 1 of 2(1).pdf (0 kb) | Description: Landscape And Visual Assessment Pl01 090721 Part 1 Of 2 Redacted | Created Date: 16/07/2021 | |
Transport Statement | |||
File: HCHQ Travel Plan_Appendix E.pdf (0 kb) | Description: Travel Survey Results | Created Date: 14/07/2021 | |
Consultee Response | |||
File: Response 2021_2125_MAJ-Thames Water-Email.pdf (0 kb) | Description: Conditions-Thames Water-Email | Created Date: 02/08/2021 | |
File: WK125791 - Police HQ.pdf (0 kb) | Description: No objection- Env Health | Created Date: 05/08/2021 | |
File: Comments.pdf (0 kb) | Description: Public Health and Protection - WHBC - Public Health and Protection | Created Date: 05/08/2021 | |
File: Response_6-2021-2125-MAJ (002).pdf (0 kb) | Description: Response - HCC - Highways response | Created Date: 02/09/2021 | |
File: 24607338_CadentGas.pdf (0 kb) | Description: No objection - Cadent - mapping | Created Date: 04/02/2022 | |
File: Comments(1).pdf (0 kb) | Description: Support - Gerry Brophy - Hertfordshire Constabulary | Created Date: 07/02/2022 | |
File: Conditional Response Lead Local Flood Authority.pdf (0 kb) | Description: No objection subject to conditions. LLFA | Created Date: 11/02/2022 | |
File: Comments(2).pdf (0 kb) | Description: No objection - Lorraine Davis - WHBC - Client Services | Created Date: 14/02/2022 | |
File: Ref 6_2021_2125_MAJ - partial redevelopment of ....pdf (0 kb) | Description: Comment - Network Rail | Created Date: 14/02/2022 | |
File: P01454294 - Herts Constabulary Welwyn.pdf (0 kb) | Description: No objection - Historic England | Created Date: 02/03/2022 | |
File: Y_HERef_P01454294_404724_620212125MAJ.pdf (0 kb) | Description: Historic England | Created Date: 25/03/2022 | |
File: 6-2021-2125-MAJ Herts Constabulary.pdf (0 kb) | Description: Tree officer | Created Date: 25/04/2022 | |
File: HCC 2021 2125.pdf (0 kb) | Description: Conditional - Archaelogy | Created Date: 18/05/2022 | |
File: Hertfordshire Constabulary Stanborough Road Welwyn Garden City AL8 6XF 6-2021-2125-MAJ_Cannot advise det as insufficient info on bats Surveys advised.pdf (0 kb) | Description: from ecology | Created Date: 18/05/2022 | |
File: Hertfordshire Constabulary Stanborough Road Welwyn Garden City AL8 6XF 6-2021-2125-MAJ_Bat roost activity surveys Sufficient info for det Follow Recomm.pdf (0 kb) | Description: Comments - Hertfordshire Ecology | Created Date: 25/05/2022 | |
File: 3rd Party Planning Application - 6_2021_2125_MAJ.pdf (0 kb) | Description: Comment - Thames Water | Created Date: 29/06/2022 | |
File: Hertfordshire Constabulary Stanborough Road Welwyn Garden City AL8.pdf (0 kb) | Description: Comment- Hertfordshire Constabulary | Created Date: 20/07/2023 | |
Neighbour Representation - Without Personal Information | |||
File: 81 Crawford Road, Hatfield, AL10 0PF Comment 24-08-2021-Redacted.pdf (0 kb) | Description: 81 Crawford Road Hatfield AL10 0PF -Redacted | Created Date: 24/08/2021 | |
Legal Agreement | |||
File: Section 106 28 June 2022_Redacted.pdf (0 kb) | Description: S106 28 June 2022 redacted | Created Date: 28/06/2022 | |
Decision Notice PDF | |||
File: Decision Notice_620212125MAJ.pdf (0 kb) | Description: Decision Notice PDF | Created Date: 28/06/2022 | |
Officer Report PDF | |||
File: Delegated Report_620212125MAJ(12).pdf (0 kb) | Description: Delegated Report | Created Date: 28/06/2022 | |
Application Documents | |||
File: HCHQ-ACM-XX-XX-RP-CE-000002_Appendix A.1(1).pdf (0 kb) | Description: Complete drainage assessment Appendix A1 Background drawings | Created Date: 24/05/2022 | |
File: HCHQ-ACM-XX-XX-RP-CE-000002_Appendix A.2.pdf (0 kb) | Description: Complete drainage assessment Appendix A2 Flood mapping | Created Date: 24/05/2022 | |
File: HCHQ-ACM-XX-XX-RP-CE-000002_Appendix A.3(1).pdf (0 kb) | Description: Complete drainage assessment Appendix A3 CCTV report | Created Date: 24/05/2022 | |
File: HCHQ-ACM-XX-XX-RP-CE-000002_Appendix B.1(1).pdf (0 kb) | Description: Complete drainage assessment Appendix B1 Design drawings | Created Date: 24/05/2022 | |
File: HCHQ-ACM-XX-XX-RP-CE-000002_Appendix B.2.pdf (0 kb) | Description: Complete drainage assessment Appendix B2 Catchment plan | Created Date: 24/05/2022 | |
File: HCHQ-ACM-XX-XX-RP-CE-000002_Appendix C(2).pdf (0 kb) | Description: Complete drainage assessment Appendix C2 Calculations | Created Date: 24/05/2022 | |
File: HCHQ-ACM-XX-XX-RP-CE-000002_Appendix D(1).pdf (0 kb) | Description: Complete drainage assessment Appendix D1 Maintenance schedules | Created Date: 24/05/2022 | |
File: HCHQ-ACM-XX-XX-RP-CE-000002_Drainage Main Report(2).pdf (0 kb) | Description: Drainage Strategy - Drainage Main Report | Created Date: 24/05/2022 | |
File: HCHQ-ACM-XX-XX-RP-CE-000001_Appendix A.1.pdf (0 kb) | Description: Complete FRA Appendix A1 Existing drainage | Created Date: 24/05/2022 | |
File: HCHQ-ACM-XX-XX-RP-CE-000001_Appendix A.2.pdf (0 kb) | Description: Complete FRA Appendix A2 Existing Catchment | Created Date: 24/05/2022 | |
File: HCHQ-ACM-XX-XX-RP-CE-000001_Appendix A.3(1).pdf (0 kb) | Description: Complete FRA Appendix A3 Bedrock Geology | Created Date: 24/05/2022 | |
File: HCHQ-ACM-XX-XX-RP-CE-000001_Appendix A.4(1).pdf (0 kb) | Description: Complete FRA Appendix A4 Superficial deposits | Created Date: 24/05/2022 | |
File: HCHQ-ACM-XX-XX-RP-CE-000001_Appendix A.5(1).pdf (0 kb) | Description: Complete FRA Appendix A5 Flood Map | Created Date: 24/05/2022 | |
File: HCHQ-ACM-XX-XX-RP-CE-000001_Appendix A.6(1).pdf (0 kb) | Description: Complete FRA Appendix A6 CCTV report | Created Date: 24/05/2022 | |
File: HCHQ-ACM-XX-XX-RP-CE-000001_Appendix A.7(1).pdf (0 kb) | Description: Complete FRA Appendix A7 Extent of flooding | Created Date: 24/05/2022 | |
File: HCHQ-ACM-XX-XX-RP-CE-000001_Appendix A.8(1).pdf (0 kb) | Description: Complete FRA Appendix A8 Extent of flooding | Created Date: 24/05/2022 | |
File: HCHQ-ACM-XX-XX-RP-CE-000001_Appendix A.9(1).pdf (0 kb) | Description: Complete FRA Appendix A9 Extent of flooding | Created Date: 24/05/2022 | |
File: HCHQ-ACM-XX-XX-RP-CE-000001_Appendix A.10(1).pdf (0 kb) | Description: Complete FRA Appendix A10 Extent of flooding | Created Date: 24/05/2022 | |
File: HCHQ-ACM-XX-XX-RP-CE-000001_Appendix A.11(2).pdf (0 kb) | Description: Complete FRA Appendix A11 Ground investigation | Created Date: 24/05/2022 | |
File: HCHQ-ACM-XX-XX-RP-CE-000001_Appendix B.1.pdf (0 kb) | Description: Complete FRA Appendix B1 Sitewide drainage strategy | Created Date: 24/05/2022 | |
File: HCHQ-ACM-XX-XX-RP-CE-000001_Appendix B.2.pdf (0 kb) | Description: Complete FRA Appendix B2 Phase 2 Proposed site plan | Created Date: 24/05/2022 | |
File: HCHQ-ACM-XX-XX-RP-CE-000001_Appendix B.3.pdf (0 kb) | Description: Complete FRA Appendix B3 Proposed SuDS sections | Created Date: 24/05/2022 | |
File: HCHQ-ACM-XX-XX-RP-CE-000001_Appendix B.4.pdf (0 kb) | Description: Complete FRA Appendix B4 Existing Catchment | Created Date: 24/05/2022 | |
File: HCHQ-ACM-XX-XX-RP-CE-000001_Appendix B.5.pdf (0 kb) | Description: Complete FRA Appendix B5 Proposed Catchment | Created Date: 24/05/2022 | |
File: HCHQ-ACM-XX-XX-RP-CE-000001_Appendix C(2).pdf (0 kb) | Description: Complete FRA Appendix C Surface Water Advisory Service | Created Date: 24/05/2022 | |
File: HCHQ-ACM-XX-XX-RP-CE-000001_FRA Main Report(2).pdf (0 kb) | Description: Complete FRA - Main report | Created Date: 24/05/2022 | |
File: HCHQ Travel Plan_Appendix A - C(1).pdf (0 kb) | Description: Complete travel assessment Appendix A-C Bus, Train & Accessibility Index Calc | Created Date: 24/05/2022 | |
File: HCHQ Travel Plan_Appendix D - 1(1).pdf (0 kb) | Description: Complete travel assessment Appendix D1 Scheme drawings | Created Date: 24/05/2022 | |
File: HCHQ Travel Plan_Appendix D - 2.pdf (0 kb) | Description: Complete travel assessment Appendix D2 Phase 3 proposed site plan | Created Date: 24/05/2022 | |
File: HCHQ Travel Plan_Appendix E(1).pdf (0 kb) | Description: Complete travel assessment Appendix E1 Travel survey results | Created Date: 24/05/2022 | |
File: HCHQ Travel Plan_Main report(2).pdf (0 kb) | Description: Complete travel assessment - Travel plan main report | Created Date: 24/05/2022 | |
File: HCHQ_TA_Appendix A - 1(1).pdf (0 kb) | Description: Complete travel assessment Appendix A1 Scheme drawings | Created Date: 24/05/2022 | |
File: HCHQ_TA_Appendix A - 2 low res.pdf (0 kb) | Description: Complete travel assessment Appendix A2 low res Proposed overall site | Created Date: 24/05/2022 | |
File: HCHQ_TA_Appendix A - 2.pdf (0 kb) | Description: Complete travel assessment Appendix A2 Proposed overall site plan | Created Date: 24/05/2022 | |
File: HCHQ_TA_Appendix A - 3.pdf (0 kb) | Description: Complete travel assessment Appendix A3 phase 3 proposed site plan | Created Date: 24/05/2022 | |
File: HCHQ_TA_Appendix A - 4.pdf (0 kb) | Description: Complete travel assessment Appendix A4 phase 1 proposed site plan | Created Date: 24/05/2022 | |
File: HCHQ_TA_Appendix A - 5.pdf (0 kb) | Description: Complete travel assessment Appendix A5 proposed dog unit location | Created Date: 24/05/2022 | |
File: HCHQ_TA_Appendix B + C(1).pdf (0 kb) | Description: Complete travel assessment Appendix B/C1 Bus/ Train timetables | Created Date: 24/05/2022 | |
File: HCHQ_TA_Main report(2).pdf (0 kb) | Description: Complete travel assessment - Main report (2) | Created Date: 24/05/2022 | |
File: HCHQ-VGA-HQ-XX-PH-AR-00292_PL01_Proposed View From White Bridge Along Parkway Welwyn Garden City.pdf (0 kb) | Description: Proposed View From White Bridge Along Parkway Welwyn Garden City | Created Date: 17/03/2022 | |
File: HCHQ-VGA-HQ-XX-PH-AR-00291_PL01_Existing View From White Bridge Along Parkway Welwyn Garden City.pdf (0 kb) | Description: Existing View From White Bridge Along Parkway Welwyn Garden City | Created Date: 17/03/2022 | |
File: HCHQ-VGA-MC-XX-DR-AR-00690-PL01 External Store Proposed Plans and Elevations.pdf (0 kb) | Description: External Store Proposed Floor Plan, Roof Plan and Elevations | Created Date: 28/04/2022 | |
File: HCHQ-VGA-XX-XX-DR-AR-00105-PL02 Existing Site Plan.pdf (0 kb) | Description: HCHQ-VGA-XX-XX-DR-AR-00105-PL02 Existing Site Plan.pdf | Created Date: 28/04/2022 | |
File: HCHQ-VGA-XX-XX-DR-AR-00115-PL02 Proposed Site Plan Phase 3 Complete.pdf (0 kb) | Description: HCHQ-VGA-XX-XX-DR-AR-00115-PL02 Proposed Site Plan Phase 3 Complete.pdf | Created Date: 28/04/2022 | |
File: HCHQ-VGA-XX-XX-DR-AR-00116-PL02 Proposed Site Plan Phase 1 Decant Building.pdf (0 kb) | Description: HCHQ-VGA-XX-XX-DR-AR-00116-PL02 Proposed Site Plan Phase 1 Decant Building.pdf | Created Date: 28/04/2022 | |
File: HCHQ-VGA-XX-XX-DR-AR-00117-PL02 Proposed Site Plan Phase 2 Headquarters Building.pdf (0 kb) | Description: HCHQ-VGA-XX-XX-DR-AR-00117-PL02 Proposed Site Plan Phase 2 Headquarters Building.pdf | Created Date: 28/04/2022 | |
Additional Environmental Approval | |||
File: HCHQ-ACM-XX-XX-RP-CE-000002_Appendix A.2_Part3.pdf (0 kb) | Description: Flood map for planning | Created Date: 19/07/2021 | |
File: HCHQ-ACM-XX-XX-RP-CE-000002_Appendix A.2_Part2.pdf (0 kb) | Description: Flood map for planning | Created Date: 19/07/2021 | |
Biodiversity Survey & Report | |||
File: HCHQ Bat Emergence Report v1.pdf (0 kb) | Description: Bat emergency report | Created Date: 20/05/2022 | |
Correspondence | |||
File: Hertfordshire Constabulary HQ_AIA Report_June 2021_ISSUE 2_28.06.21_Part 1 of 2.pdf (0 kb) | Description: Arboricultural Impact Assessment Report | Created Date: 23/09/2021 | |
File: HCHQ-VGA-XX-XX-DR-AR-00118-PL02 Proposed Site Plan_Phase 1_Gosling Access.pdf (0 kb) | Description: Proposed Site Plan_Phase 1_Gosling Access.pdf | Created Date: 17/03/2022 | |
File: Hertfordshire Constabulary HQ_AIA Report_ISSUE 3_18.03.22_Optimized.pdf (0 kb) | Description: Revised Arboricultural Report | Created Date: 18/03/2022 | |
File: Police HQ hydrant response.pdf (0 kb) | Description: Water plan | Created Date: 29/03/2022 | |
File: Hertfordshire Constabulary Headquarters Dog Unit building_brukl_Be Clean_Be Green(1).pdf (0 kb) | Description: brukl document | Created Date: 24/05/2022 | |
Documents | |||
File: HCHQ-ACM-XX-XX-RP-CE-000001_Factual Report on Ground Investigation.pdf (0 kb) | Description: Factual Report On Ground Investigation Redacted | Created Date: 14/07/2021 | |
File: Hertfordshire Constabulary HQ_AIA Report_June 2021_ISSUE 2_28.06.21_Part 2 of 2.pdf (0 kb) | Description: AIA Report June 2021 Issue 2 28.06.21 Part 2 Of 2 | Created Date: 14/07/2021 | |
File: HCHQ-ACM-XX-XX-RP-CE-000001_Appendix A.6.pdf (0 kb) | Description: CCTV Report | Created Date: 14/07/2021 | |
File: HCHQ-ACM-XX-XX-RP-CE-000002_Appendix A.3.pdf (0 kb) | Description: CCTV Report | Created Date: 14/07/2021 | |
File: Hertfordshire Constabulary Headquarters Atrium building_brukl_Be Clean_Be Green(1).pdf (0 kb) | Description: Brukl Be Clean Be Green unable to redact | Created Date: 16/07/2021 | |
File: HCHQ-ACM-XX-XX-RP-CE-000001_Appendix C(1).pdf (0 kb) | Description: Surface Water Advisery Redacted | Created Date: 16/07/2021 | |
Flood Impact Assessment | |||
File: HCHQ-ACM-XX-XX-RP-CE-000001_Appendix A.10.pdf (0 kb) | Description: Flood Map | Created Date: 14/07/2021 | |
File: HCHQ-ACM-XX-XX-RP-CE-000001_Appendix A.9.pdf (0 kb) | Description: Flood Map | Created Date: 14/07/2021 | |
File: HCHQ-ACM-XX-XX-RP-CE-000001_Appendix A.5.pdf (0 kb) | Description: Flood Map | Created Date: 14/07/2021 | |
File: HCHQ-ACM-XX-XX-RP-CE-000001_Appendix A.7.pdf (0 kb) | Description: Flood Map | Created Date: 14/07/2021 | |
File: HCHQ-ACM-XX-XX-RP-CE-000001_Appendix A.8.pdf (0 kb) | Description: Flood Map | Created Date: 14/07/2021 | |
File: HCHQ-ACM-XX-XX-RP-CE-000001_FRA Main Report(1).pdf (0 kb) | Description: Flood Risk Assesment redacted | Created Date: 16/07/2021 | |
Foul Sewage & Utilities Assessment | |||
File: HCHQ-ACM-XX-XX-RP-CE-000002_Drainage Main Report(1).pdf (0 kb) | Description: Drainage Main Report Redacted | Created Date: 16/07/2021 | |
Noise Impact Assessment | |||
File: 60600329_Construction Noise Assessment_June 2021(1).pdf (0 kb) | Description: Construction Noise Assessment June 2021 redacted | Created Date: 16/07/2021 | |
File: 60600329_External Noise Survey_May 2021(1).pdf (0 kb) | Description: External Noise Survey May 2021 redacted | Created Date: 16/07/2021 | |
Roof Plans | |||
File: HCHQ-VGA-EW-RF-DR-AR-00584-PL01 E+F Building Proposed RP.pdf (0 kb) | Description: Estates & Facilities Building Proposed Roof Plan | Created Date: 14/07/2021 | |
Site Notice | |||
File: Site Notice_620212125MAJ.pdf (0 kb) | Description: Site Notice | Created Date: 02/02/2022 | |
File: Site Notice_620212125MAJ.pdf (0 kb) | Description: Site Notice | Created Date: 02/02/2022 | |
File: Site Notice_620212125MAJ(1).pdf (0 kb) | Description: Site Notice | Created Date: 02/02/2022 | |
Site Plan | |||
File: Proposed Site Plan.pdf (0 kb) | Description: Proposed Site Plan Phase 3 Complete | Created Date: 19/07/2021 | |
File: Proposed site plan 1.pdf (0 kb) | Description: Proposed site plan 1 Phase 1 Decant Building | Created Date: 19/07/2021 | |
File: Proposed site plan 2.pdf (0 kb) | Description: Proposed site plan Gosling Sports Park | Created Date: 19/07/2021 | |
File: Site plans 00540.pdf (0 kb) | Description: Enabling works Temporary Kitchen | Created Date: 19/07/2021 | |
File: Proposed site plan 00117.pdf (0 kb) | Description: Proposed site plan Phase 2 Headquarters Building | Created Date: 19/07/2021 | |
Supporting Information | |||
File: 7645_Waste Management_PL01_090721.pdf (0 kb) | Description: Waste Management | Created Date: 14/07/2021 | |
File: HCHQ Travel Plan_Appendix A - C.pdf (0 kb) | Description: Appendix A - Bus Timetables | Created Date: 14/07/2021 | |
File: Stanborough - Schedule of application documents FINAL.pdf (0 kb) | Description: Schedule Of Application Documents | Created Date: 14/07/2021 | |
File: HCHQ_TA_Appendix B + C.pdf (0 kb) | Description: Bus Timetables | Created Date: 14/07/2021 | |
File: 7645_Operational Need Statement_PL01_090721(1).pdf (0 kb) | Description: Operational Need Statement redacted | Created Date: 16/07/2021 | |
File: HCHQ_TA_Main report(1).pdf (0 kb) | Description: Transport Assessment Report redacted | Created Date: 16/07/2021 | |
File: 7645_Waste Management_PL01_090721(1).pdf (0 kb) | Description: Waste Management Redacted | Created Date: 16/07/2021 | |
File: 7645_Statement of Community Engagement_PL01_090721(1).pdf (0 kb) | Description: Statement Of Community Engagement redacted | Created Date: 16/07/2021 | |
Topographical | |||
File: HCHQ-ACM-XX-XX-RP-CE-000001_Appendix A.4.pdf (0 kb) | Description: Scale Geology | Created Date: 14/07/2021 | |
File: HCHQ-ACM-XX-XX-RP-CE-000001_Appendix A.3.pdf (0 kb) | Description: Scale Geology | Created Date: 14/07/2021 | |
Tree Survey | |||
File: Tree Survey + Tree Constraints Plans(1).pdf (0 kb) | Description: Tree Survey + Tree Constraints Plans Redacted | Created Date: 16/07/2021 |
Organisation | Name | Sent | Reply Due | Reply Received |
---|---|---|---|---|
Hertfordshire County Council - Rights of Way North | 27/07/2021 | 17/08/2021 | ||
Hertfordshire County Council - Rights of Way North | 28/06/2022 | |||
Herts & Middlesex Wildlife Trust | 28/06/2022 | |||
Herts & Middlesex Wildlife Trust | 02/02/2022 | 23/02/2022 | ||
Brocket Hall Estate | Brocket Hall Estate | 20/03/2022 | 10/04/2022 | |
Brocket Hall Estate | Brocket Hall Estate | 28/06/2022 | ||
HCC Water Officer | Catherine Gilbert | 28/06/2022 | ||
HCC Water Officer | Catherine Gilbert | 27/07/2021 | 17/08/2021 | |
Place Services | Conservation Officer | 27/01/2022 | 17/02/2022 | |
Place Services | Conservation Officer | 28/06/2022 | ||
The Gardens Trust | Conservation Team | 28/06/2022 | ||
The Gardens Trust | Conservation Team | 27/07/2021 | 17/08/2021 | |
Welwyn Hatfield Borough Council | Councillor Anthony Dennis | 27/07/2021 | 17/08/2021 | |
Welwyn Hatfield Borough Council | Councillor Anthony Dennis | 28/06/2022 | ||
Welwyn Hatfield Borough Council | Councillor Fiona Thomson | 28/06/2022 | ||
Welwyn Hatfield Borough Council | Councillor Fiona Thomson | 27/07/2021 | 17/08/2021 | |
Welwyn Hatfield Borough Council | Councillor Siobhan Elam | 27/07/2021 | 17/08/2021 | |
Welwyn Hatfield Borough Council | Councillor Siobhan Elam | 28/06/2022 | ||
Hertfordshire County Council | Emma Chapman - Spatial Planning & Economy Team | 28/06/2022 | ||
Hertfordshire County Council | Emma Chapman - Spatial Planning & Economy Team | 27/07/2021 | 17/08/2021 | |
Lead Local Flood Authority | Fiona Lai | 27/07/2021 | 17/08/2021 | |
Lead Local Flood Authority | Fiona Lai | 28/06/2022 | ||
Gascoyne Estates | Gascoyne Estates | 20/03/2022 | 10/04/2022 | |
Gascoyne Estates | Gascoyne Estates | 28/06/2022 | ||
Hertfordshire Constabulary | Gerry Brophy | 28/06/2022 | ||
Hertfordshire Constabulary | Gerry Brophy | 02/02/2022 | 23/02/2022 | 07/02/2022 |
Hertfordshire County Council | HCC Growth Team | 18/05/2022 | ||
Hertfordshire County Council | HCC Growth Team | 28/06/2022 | ||
Hertfordshire County Council | HCC Minerals and Waste Team | 28/06/2022 | ||
Hertfordshire County Council | HCC Minerals and Waste Team | 02/02/2022 | 23/02/2022 | |
Hertfordshire County Council | Hertfordshire Transport Programmes & Strategy | 27/07/2021 | 17/08/2021 | 16/08/2021 |
Hertfordshire County Council | Hertfordshire Transport Programmes & Strategy | 28/06/2022 | ||
The Ramblers' Association | Ian Hardy | 28/06/2022 | ||
The Ramblers' Association | Ian Hardy | 27/07/2021 | 17/08/2021 | |
Welwyn Hatfield Borough Council | Landscapes Department | 27/01/2022 | 17/02/2022 | |
Welwyn Hatfield Borough Council | Landscapes Department | 28/06/2022 | ||
WHBC - Client Services | Lorraine Davis | 28/06/2022 | ||
WHBC - Client Services | Lorraine Davis | 02/02/2022 | 23/02/2022 | 14/02/2022 |
Hertfordshire Ecology | Martin Hicks | 02/02/2022 | 23/02/2022 | 25/05/2022 |
Hertfordshire Ecology | Martin Hicks | 28/06/2022 | ||
Network Rail | Mr Matt Leighton | 28/06/2022 | ||
Network Rail | Mr Matt Leighton | 02/02/2022 | 23/02/2022 | 14/02/2022 |
Herts & Middlesex Bat Group | Mr Roger Havard | 02/02/2022 | 23/02/2022 | |
Herts & Middlesex Bat Group | Mr Roger Havard | 28/06/2022 | ||
Cadent Gas Limited | Mr S Carter | 28/06/2022 | ||
Cadent Gas Limited | Mr S Carter | 02/02/2022 | 23/02/2022 | 03/02/2022 |
Environment Agency | Natasha Smith | 27/07/2021 | 17/08/2021 | |
Environment Agency | Natasha Smith | 28/06/2022 | ||
Thames Water, Development Control | Nicky McHugh | 28/06/2022 | ||
Thames Water, Development Control | Nicky McHugh | 27/07/2021 | 17/08/2021 | 02/08/2021 |
Welwyn Hatfield Borough Council | Parking Services | 02/02/2022 | 23/02/2022 | |
Welwyn Hatfield Borough Council | Parking Services | 28/06/2022 | ||
Affinity Water Ltd | Planning Team | 28/06/2022 | ||
Affinity Water Ltd | Planning Team | 27/07/2021 | 17/08/2021 | |
WHBC - Public Health and Protection | Public Health and Protection | 27/07/2021 | 17/08/2021 | 05/08/2021 |
WHBC - Public Health and Protection | Public Health and Protection | 28/06/2022 | ||
Historic England | Tom Goodman | 02/02/2022 | 23/02/2022 | 01/03/2022 |
Historic England | Tom Goodman | 28/06/2022 | ||
Historic England | Tom Goodman | 18/03/2022 | 28/03/2022 |
Address | Date Sent | Expiry Date | Date Reconsulted | Reconsult Expiry Date |
---|---|---|---|---|
75 Eddington Crescent Welwyn Garden City AL7 4SX | 27/07/2021 | 17/08/2021 | ||
77 Eddington Crescent Welwyn Garden City AL7 4SX | 27/07/2021 | 17/08/2021 | ||
79 Eddington Crescent Welwyn Garden City AL7 4SX | 27/07/2021 | 17/08/2021 | ||
81 Eddington Crescent Welwyn Garden City AL7 4SX | 27/07/2021 | 17/08/2021 | ||
83 Eddington Crescent Welwyn Garden City AL7 4SX | 27/07/2021 | 17/08/2021 | ||
85 Eddington Crescent Welwyn Garden City AL7 4SX | 27/07/2021 | 17/08/2021 | ||
87 Eddington Crescent Welwyn Garden City AL7 4SX | 27/07/2021 | 17/08/2021 | ||
89 Eddington Crescent Welwyn Garden City AL7 4SX | 27/07/2021 | 17/08/2021 | ||
91 Eddington Crescent Welwyn Garden City AL7 4SX | 27/07/2021 | 17/08/2021 | ||
93 Eddington Crescent Welwyn Garden City AL7 4SX | 27/07/2021 | 17/08/2021 | ||
95 Eddington Crescent Welwyn Garden City AL7 4SX | 27/07/2021 | 17/08/2021 | ||
97 Eddington Crescent Welwyn Garden City AL7 4SX | 27/07/2021 | 17/08/2021 | ||
99 Eddington Crescent Welwyn Garden City AL7 4SX | 27/07/2021 | 17/08/2021 | ||
101 Eddington Crescent Welwyn Garden City AL7 4SX | 27/07/2021 | 17/08/2021 | ||
103 Eddington Crescent Welwyn Garden City AL7 4SX | 27/07/2021 | 17/08/2021 | ||
105 Eddington Crescent Welwyn Garden City AL7 4SX | 27/07/2021 | 17/08/2021 | ||
107 Eddington Crescent Welwyn Garden City AL7 4SX | 27/07/2021 | 17/08/2021 | ||
109 Eddington Crescent Welwyn Garden City AL7 4SX | 27/07/2021 | 17/08/2021 | ||
111 Eddington Crescent Welwyn Garden City AL7 4SX | 27/07/2021 | 17/08/2021 | ||
113 Eddington Crescent Welwyn Garden City AL7 4SX | 27/07/2021 | 17/08/2021 | ||
115 Eddington Crescent Welwyn Garden City AL7 4SX | 27/07/2021 | 17/08/2021 | ||
117 Eddington Crescent Welwyn Garden City AL7 4SX | 27/07/2021 | 17/08/2021 | ||
119 Eddington Crescent Welwyn Garden City AL7 4SX | 27/07/2021 | 17/08/2021 | ||
121 Eddington Crescent Welwyn Garden City AL7 4SX | 27/07/2021 | 17/08/2021 | ||
123 Eddington Crescent Welwyn Garden City AL7 4SX | 27/07/2021 | 17/08/2021 | ||
125 Eddington Crescent Welwyn Garden City AL7 4SX | 27/07/2021 | 17/08/2021 | ||
127 Eddington Crescent Welwyn Garden City AL7 4SX | 27/07/2021 | 17/08/2021 | ||
129 Eddington Crescent Welwyn Garden City AL7 4SX | 27/07/2021 | 17/08/2021 | ||
131 Eddington Crescent Welwyn Garden City AL7 4SX | 27/07/2021 | 17/08/2021 | ||
133 Eddington Crescent Welwyn Garden City AL7 4SX | 27/07/2021 | 17/08/2021 | ||
135 Eddington Crescent Welwyn Garden City AL7 4SX | 27/07/2021 | 17/08/2021 | ||
137 Eddington Crescent Welwyn Garden City AL7 4SX | 27/07/2021 | 17/08/2021 | ||
139 Eddington Crescent Welwyn Garden City AL7 4SX | 27/07/2021 | 17/08/2021 | ||
141 Eddington Crescent Welwyn Garden City AL7 4SX | 27/07/2021 | 17/08/2021 | ||
143 Eddington Crescent Welwyn Garden City AL7 4SX | 27/07/2021 | 17/08/2021 | ||
145 Eddington Crescent Welwyn Garden City AL7 4SX | 27/07/2021 | 17/08/2021 | ||
147 Eddington Crescent Welwyn Garden City AL7 4SX | 27/07/2021 | 17/08/2021 | ||
149 Eddington Crescent Welwyn Garden City AL7 4SX | 27/07/2021 | 17/08/2021 | ||
151 Eddington Crescent Welwyn Garden City AL7 4SY | 27/07/2021 | 17/08/2021 | ||
153 Eddington Crescent Welwyn Garden City AL7 4SY | 27/07/2021 | 17/08/2021 | ||
155 Eddington Crescent Welwyn Garden City AL7 4SY | 27/07/2021 | 17/08/2021 | ||
157 Eddington Crescent Welwyn Garden City AL7 4SY | 27/07/2021 | 17/08/2021 | ||
159 Eddington Crescent Welwyn Garden City AL7 4SY | 27/07/2021 | 17/08/2021 | ||
161 Eddington Crescent Welwyn Garden City AL7 4SY | 27/07/2021 | 17/08/2021 | ||
163 Eddington Crescent Welwyn Garden City AL7 4SY | 27/07/2021 | 17/08/2021 | ||
165 Eddington Crescent Welwyn Garden City AL7 4SY | 27/07/2021 | 17/08/2021 | ||
167 Eddington Crescent Welwyn Garden City AL7 4SY | 27/07/2021 | 17/08/2021 | ||
169 Eddington Crescent Welwyn Garden City AL7 4SY | 27/07/2021 | 17/08/2021 | ||
171 Eddington Crescent Welwyn Garden City AL7 4SY | 27/07/2021 | 17/08/2021 | ||
173 Eddington Crescent Welwyn Garden City AL7 4SY | 27/07/2021 | 17/08/2021 | ||
175 Eddington Crescent Welwyn Garden City AL7 4SY | 27/07/2021 | 17/08/2021 | ||
177 Eddington Crescent Welwyn Garden City AL7 4SY | 27/07/2021 | 17/08/2021 | ||
179 Eddington Crescent Welwyn Garden City AL7 4SY | 27/07/2021 | 17/08/2021 | ||
181 Eddington Crescent Welwyn Garden City AL7 4SY | 27/07/2021 | 17/08/2021 | ||
183 Eddington Crescent Welwyn Garden City AL7 4SY | 27/07/2021 | 17/08/2021 | ||
185 Eddington Crescent Welwyn Garden City AL7 4SY | 27/07/2021 | 17/08/2021 | ||
187 Eddington Crescent Welwyn Garden City AL7 4SY | 27/07/2021 | 17/08/2021 | ||
189 Eddington Crescent Welwyn Garden City AL7 4SY | 27/07/2021 | 17/08/2021 | ||
191 Eddington Crescent Welwyn Garden City AL7 4SY | 27/07/2021 | 17/08/2021 | ||
193 Eddington Crescent Welwyn Garden City AL7 4SY | 27/07/2021 | 17/08/2021 | ||
195 Eddington Crescent Welwyn Garden City AL7 4SY | 27/07/2021 | 17/08/2021 | ||
197 Eddington Crescent Welwyn Garden City AL7 4SY | 27/07/2021 | 17/08/2021 | ||
199 Eddington Crescent Welwyn Garden City AL7 4SY | 27/07/2021 | 17/08/2021 | ||
201 Eddington Crescent Welwyn Garden City AL7 4SY | 27/07/2021 | 17/08/2021 | ||
203 Eddington Crescent Welwyn Garden City AL7 4SY | 27/07/2021 | 17/08/2021 | ||
205 Eddington Crescent Welwyn Garden City AL7 4SY | 27/07/2021 | 17/08/2021 | ||
207 Eddington Crescent Welwyn Garden City AL7 4SY | 27/07/2021 | 17/08/2021 | ||
209 Eddington Crescent Welwyn Garden City AL7 4SY | 27/07/2021 | 17/08/2021 | ||
211 Eddington Crescent Welwyn Garden City AL7 4SY | 27/07/2021 | 17/08/2021 | ||
213 Eddington Crescent Welwyn Garden City AL7 4SY | 27/07/2021 | 17/08/2021 | ||
215 Eddington Crescent Welwyn Garden City AL7 4SY | 27/07/2021 | 17/08/2021 | ||
217 Eddington Crescent Welwyn Garden City AL7 4SY | 27/07/2021 | 17/08/2021 | ||
219 Eddington Crescent Welwyn Garden City AL7 4SY | 27/07/2021 | 17/08/2021 | ||
221 Eddington Crescent Welwyn Garden City AL7 4SY | 27/07/2021 | 17/08/2021 | ||
223 Eddington Crescent Welwyn Garden City AL7 4SY | 27/07/2021 | 17/08/2021 | ||
225 Eddington Crescent Welwyn Garden City AL7 4SY | 27/07/2021 | 17/08/2021 | ||
227 Eddington Crescent Welwyn Garden City AL7 4SY | 27/07/2021 | 17/08/2021 | ||
84 Eddington Crescent Welwyn Garden City AL7 4SQ | 27/07/2021 | 17/08/2021 | ||
86 Eddington Crescent Welwyn Garden City AL7 4SQ | 27/07/2021 | 17/08/2021 | ||
88 Eddington Crescent Welwyn Garden City AL7 4SQ | 27/07/2021 | 17/08/2021 | ||
90 Eddington Crescent Welwyn Garden City AL7 4SQ | 27/07/2021 | 17/08/2021 | ||
92 Eddington Crescent Welwyn Garden City AL7 4SQ | 27/07/2021 | 17/08/2021 | ||
94 Eddington Crescent Welwyn Garden City AL7 4SQ | 27/07/2021 | 17/08/2021 | ||
96 Eddington Crescent Welwyn Garden City AL7 4SQ | 27/07/2021 | 17/08/2021 | ||
98 Eddington Crescent Welwyn Garden City AL7 4SQ | 27/07/2021 | 17/08/2021 | ||
100 Eddington Crescent Welwyn Garden City AL7 4SQ | 27/07/2021 | 17/08/2021 | ||
102 Eddington Crescent Welwyn Garden City AL7 4SQ | 27/07/2021 | 17/08/2021 | ||
41 St Josephs Green Welwyn Garden City AL7 4TT | 27/07/2021 | 17/08/2021 | ||
43 St Josephs Green Welwyn Garden City AL7 4TT | 27/07/2021 | 17/08/2021 | ||
45 St Josephs Green Welwyn Garden City AL7 4TT | 27/07/2021 | 17/08/2021 | ||
47 St Josephs Green Welwyn Garden City AL7 4TT | 27/07/2021 | 17/08/2021 | ||
49 St Josephs Green Welwyn Garden City AL7 4TT | 27/07/2021 | 17/08/2021 | ||
81 Crawford Road Hatfield AL10 0PF | ||||
111 Lemsford Lane Welwyn Garden City AL8 6YU | 27/07/2021 | 17/08/2021 | ||
104 Springfields Welwyn Garden City AL8 6XL | 27/07/2021 | 17/08/2021 | ||
106 Springfields Welwyn Garden City AL8 6XL | 27/07/2021 | 17/08/2021 | ||
108 Springfields Welwyn Garden City AL8 6XL | 27/07/2021 | 17/08/2021 | ||
110 Springfields Welwyn Garden City AL8 6XL | 27/07/2021 | 17/08/2021 | ||
112 Springfields Welwyn Garden City AL8 6XL | 27/07/2021 | 17/08/2021 | ||
114 Springfields Welwyn Garden City AL8 6XL | 27/07/2021 | 17/08/2021 | ||
116 Springfields Welwyn Garden City AL8 6XL | 27/07/2021 | 17/08/2021 | ||
118 Springfields Welwyn Garden City AL8 6XL | 27/07/2021 | 17/08/2021 | ||
120 Springfields Welwyn Garden City AL8 6XL | 27/07/2021 | 17/08/2021 | ||
122 Springfields Welwyn Garden City AL8 6XL | 27/07/2021 | 17/08/2021 | ||
124 Springfields Welwyn Garden City AL8 6XL | 27/07/2021 | 17/08/2021 | ||
126 Springfields Welwyn Garden City AL8 6XL | 27/07/2021 | 17/08/2021 | ||
128 Springfields Welwyn Garden City AL8 6XL | 27/07/2021 | 17/08/2021 | ||
130 Springfields Welwyn Garden City AL8 6XL | 27/07/2021 | 17/08/2021 | ||
132 Springfields Welwyn Garden City AL8 6XL | 27/07/2021 | 17/08/2021 | ||
134 Springfields Welwyn Garden City AL8 6XL | 27/07/2021 | 17/08/2021 | ||
24 Stanborough Green Welwyn Garden City AL8 6XH | 27/07/2021 | 17/08/2021 | ||
26 Stanborough Green Welwyn Garden City AL8 6XH | 27/07/2021 | 17/08/2021 | ||
28 Stanborough Green Welwyn Garden City AL8 6XH | 27/07/2021 | 17/08/2021 | ||
30 Stanborough Green Welwyn Garden City AL8 6XH | 27/07/2021 | 17/08/2021 | ||
64 Stanborough Green Welwyn Garden City AL8 6XH | 27/07/2021 | 17/08/2021 | ||
66 Stanborough Green Welwyn Garden City AL8 6XH | 27/07/2021 | 17/08/2021 | ||
68 Stanborough Green Welwyn Garden City AL8 6XH | 27/07/2021 | 17/08/2021 | ||
70 Stanborough Green Welwyn Garden City AL8 6XH | 27/07/2021 | 17/08/2021 | ||
72 Stanborough Green Welwyn Garden City AL8 6XH | 27/07/2021 | 17/08/2021 | ||
74 Stanborough Green Welwyn Garden City AL8 6XH | 27/07/2021 | 17/08/2021 | ||
76 Stanborough Green Welwyn Garden City AL8 6XH | 27/07/2021 | 17/08/2021 | ||
78 Stanborough Green Welwyn Garden City AL8 6XH | 27/07/2021 | 17/08/2021 | ||
80 Stanborough Green Welwyn Garden City AL8 6XH | 27/07/2021 | 17/08/2021 | ||
82 Stanborough Green Welwyn Garden City AL8 6XH | 27/07/2021 | 17/08/2021 | ||
84 Stanborough Green Welwyn Garden City AL8 6XH | 27/07/2021 | 17/08/2021 | ||
86 Stanborough Green Welwyn Garden City AL8 6XH | 27/07/2021 | 17/08/2021 | ||
88 Stanborough Green Welwyn Garden City AL8 6XJ | 27/07/2021 | 17/08/2021 | ||
90 Stanborough Green Welwyn Garden City AL8 6XJ | 27/07/2021 | 17/08/2021 | ||
92 Stanborough Green Welwyn Garden City AL8 6XJ | 27/07/2021 | 17/08/2021 | ||
94 Stanborough Green Welwyn Garden City AL8 6XJ | 27/07/2021 | 17/08/2021 | ||
96 Stanborough Green Welwyn Garden City AL8 6XJ | 27/07/2021 | 17/08/2021 | ||
98 Stanborough Green Welwyn Garden City AL8 6XJ | 27/07/2021 | 17/08/2021 | ||
100 Stanborough Green Welwyn Garden City AL8 6XJ | 27/07/2021 | 17/08/2021 | ||
102 Stanborough Green Welwyn Garden City AL8 6XJ | 27/07/2021 | 17/08/2021 | ||
104 Stanborough Green Welwyn Garden City AL8 6XJ | 27/07/2021 | 17/08/2021 | ||
106 Stanborough Green Welwyn Garden City AL8 6XJ | 27/07/2021 | 17/08/2021 | ||
108 Stanborough Green Welwyn Garden City AL8 6XJ | 27/07/2021 | 17/08/2021 | ||
110 Stanborough Green Welwyn Garden City AL8 6XJ | 27/07/2021 | 17/08/2021 | ||
112 Stanborough Green Welwyn Garden City AL8 6XJ | 27/07/2021 | 17/08/2021 | ||
114 Stanborough Green Welwyn Garden City AL8 6XJ | 27/07/2021 | 17/08/2021 | ||
116 Stanborough Green Welwyn Garden City AL8 6XJ | 27/07/2021 | 17/08/2021 | ||
118 Stanborough Green Welwyn Garden City AL8 6XJ | 27/07/2021 | 17/08/2021 | ||
120 Stanborough Green Welwyn Garden City AL8 6XJ | 27/07/2021 | 17/08/2021 | ||
122 Stanborough Green Welwyn Garden City AL8 6XJ | 27/07/2021 | 17/08/2021 | ||
124 Stanborough Green Welwyn Garden City AL8 6XJ | 27/07/2021 | 17/08/2021 | ||
126 Stanborough Green Welwyn Garden City AL8 6XJ | 27/07/2021 | 17/08/2021 | ||
128 Stanborough Green Welwyn Garden City AL8 6XJ | 27/07/2021 | 17/08/2021 | ||
130 Stanborough Green Welwyn Garden City AL8 6XJ | 27/07/2021 | 17/08/2021 | ||
132 Stanborough Green Welwyn Garden City AL8 6XJ | 27/07/2021 | 17/08/2021 | ||
134 Stanborough Green Welwyn Garden City AL8 6XJ | 27/07/2021 | 17/08/2021 | ||
136 Stanborough Green Welwyn Garden City AL8 6XJ | 27/07/2021 | 17/08/2021 | ||
138 Stanborough Green Welwyn Garden City AL8 6XJ | 27/07/2021 | 17/08/2021 | ||
140 Stanborough Green Welwyn Garden City AL8 6XJ | 27/07/2021 | 17/08/2021 | ||
142 Stanborough Green Welwyn Garden City AL8 6XJ | 27/07/2021 | 17/08/2021 | ||
144 Stanborough Green Welwyn Garden City AL8 6XJ | 27/07/2021 | 17/08/2021 | ||
146 Stanborough Green Welwyn Garden City AL8 6XJ | 27/07/2021 | 17/08/2021 | ||
148 Stanborough Green Welwyn Garden City AL8 6XJ | 27/07/2021 | 17/08/2021 | ||
14 West Burrowfield Welwyn Garden City AL7 4TW | 27/07/2021 | 17/08/2021 | ||
4 West Burrowfield Welwyn Garden City AL7 4TW | 27/07/2021 | 17/08/2021 | ||
7 West Burrowfield Welwyn Garden City AL7 4TW | 27/07/2021 | 17/08/2021 | ||
2 East Burrowfield Welwyn Garden City AL7 4TB | 27/07/2021 | 17/08/2021 | ||
4 East Burrowfield Welwyn Garden City AL7 4TB | 27/07/2021 | 17/08/2021 | ||
8 East Burrowfield Welwyn Garden City AL7 4TB | 27/07/2021 | 17/08/2021 | ||
1 West Burrowfield Welwyn Garden City AL7 4TW | 27/07/2021 | 17/08/2021 | ||
2 West Burrowfield Welwyn Garden City AL7 4TW | 27/07/2021 | 17/08/2021 | ||
5 West Burrowfield Welwyn Garden City AL7 4TW | 27/07/2021 | 17/08/2021 | ||
6 West Burrowfield Welwyn Garden City AL7 4TW | 27/07/2021 | 17/08/2021 | ||
8 West Burrowfield Welwyn Garden City AL7 4TW | 27/07/2021 | 17/08/2021 | ||
9-11 West Burrowfield Welwyn Garden City AL7 4TW | 27/07/2021 | 17/08/2021 | ||
45 Burrowfield Welwyn Garden City AL7 4SS | 27/07/2021 | 17/08/2021 | ||
Stanborough School Lemsford Lane Welwyn Garden City AL8 6YR | 27/07/2021 | 17/08/2021 | ||
37 Chequers Field Welwyn Garden City AL7 4TX | 27/07/2021 | 17/08/2021 | ||
39 Chequers Field Welwyn Garden City AL7 4TX | 27/07/2021 | 17/08/2021 | ||
41 Chequers Field Welwyn Garden City AL7 4TX | 27/07/2021 | 17/08/2021 | ||
43 Chequers Field Welwyn Garden City AL7 4TX | 27/07/2021 | 17/08/2021 | ||
45 Chequers Field Welwyn Garden City AL7 4TX | 27/07/2021 | 17/08/2021 | ||
47 Chequers Field Welwyn Garden City AL7 4TX | 27/07/2021 | 17/08/2021 | ||
49 Chequers Field Welwyn Garden City AL7 4TX | 27/07/2021 | 17/08/2021 | ||
51 Chequers Field Welwyn Garden City AL7 4TX | 27/07/2021 | 17/08/2021 | ||
53 Chequers Field Welwyn Garden City AL7 4TX | 27/07/2021 | 17/08/2021 | ||
55 Chequers Field Welwyn Garden City AL7 4TX | 27/07/2021 | 17/08/2021 | ||
57 Chequers Field Welwyn Garden City AL7 4TX | 27/07/2021 | 17/08/2021 | ||
59 Chequers Field Welwyn Garden City AL7 4TX | 27/07/2021 | 17/08/2021 | ||
61 Chequers Field Welwyn Garden City AL7 4TX | 27/07/2021 | 17/08/2021 | ||
63 Chequers Field Welwyn Garden City AL7 4TX | 27/07/2021 | 17/08/2021 | ||
65 Chequers Field Welwyn Garden City AL7 4TX | 27/07/2021 | 17/08/2021 | ||
67 Chequers Field Welwyn Garden City AL7 4TX | 27/07/2021 | 17/08/2021 | ||
69 Chequers Field Welwyn Garden City AL7 4TX | 27/07/2021 | 17/08/2021 | ||
71 Chequers Field Welwyn Garden City AL7 4TX | 27/07/2021 | 17/08/2021 | ||
73 Chequers Field Welwyn Garden City AL7 4TX | 27/07/2021 | 17/08/2021 | ||
75 Chequers Field Welwyn Garden City AL7 4TX | 27/07/2021 | 17/08/2021 | ||
77 Chequers Field Welwyn Garden City AL7 4TX | 27/07/2021 | 17/08/2021 | ||
79 Chequers Field Welwyn Garden City AL7 4TX | 27/07/2021 | 17/08/2021 | ||
81 Chequers Field Welwyn Garden City AL7 4TX | 27/07/2021 | 17/08/2021 | ||
83 Chequers Field Welwyn Garden City AL7 4TX | 27/07/2021 | 17/08/2021 | ||
85 Chequers Field Welwyn Garden City AL7 4TX | 27/07/2021 | 17/08/2021 | ||
87 Chequers Field Welwyn Garden City AL7 4TX | 27/07/2021 | 17/08/2021 | ||
89 Chequers Field Welwyn Garden City AL7 4TX | 27/07/2021 | 17/08/2021 | ||
91 Chequers Field Welwyn Garden City AL7 4TX | 27/07/2021 | 17/08/2021 | ||
93 Chequers Field Welwyn Garden City AL7 4TX | 27/07/2021 | 17/08/2021 | ||
95 Chequers Field Welwyn Garden City AL7 4TX | 27/07/2021 | 17/08/2021 | ||
97 Chequers Field Welwyn Garden City AL7 4TX | 27/07/2021 | 17/08/2021 | ||
99 Chequers Field Welwyn Garden City AL7 4TX | 27/07/2021 | 17/08/2021 | ||
101 Chequers Field Welwyn Garden City AL7 4TX | 27/07/2021 | 17/08/2021 | ||
103 Chequers Field Welwyn Garden City AL7 4TX | 27/07/2021 | 17/08/2021 | ||
105 Chequers Field Welwyn Garden City AL7 4TX | 27/07/2021 | 17/08/2021 | ||
107 Chequers Field Welwyn Garden City AL7 4TX | 27/07/2021 | 17/08/2021 | ||
109 Chequers Field Welwyn Garden City AL7 4TX | 27/07/2021 | 17/08/2021 | ||
111 Chequers Field Welwyn Garden City AL7 4TX | 27/07/2021 | 17/08/2021 | ||
113 Chequers Field Welwyn Garden City AL7 4TX | 27/07/2021 | 17/08/2021 | ||
115 Chequers Field Welwyn Garden City AL7 4TX | 27/07/2021 | 17/08/2021 | ||
117 Chequers Field Welwyn Garden City AL7 4TX | 27/07/2021 | 17/08/2021 | ||
119 Chequers Field Welwyn Garden City AL7 4TX | 27/07/2021 | 17/08/2021 | ||
121 Chequers Field Welwyn Garden City AL7 4TX | 27/07/2021 | 17/08/2021 | ||
123 Chequers Field Welwyn Garden City AL7 4TX | 27/07/2021 | 17/08/2021 | ||
125 Chequers Field Welwyn Garden City AL7 4TX | 27/07/2021 | 17/08/2021 | ||
127 Chequers Field Welwyn Garden City AL7 4TX | 27/07/2021 | 17/08/2021 | ||
129 Chequers Field Welwyn Garden City AL7 4TX | 27/07/2021 | 17/08/2021 | ||
131 Chequers Field Welwyn Garden City AL7 4TX | 27/07/2021 | 17/08/2021 | ||
47-49 Burrowfield Welwyn Garden City AL7 4SS | 27/07/2021 | 17/08/2021 | ||
50-52 Burrowfield Welwyn Garden City AL7 4SR | 27/07/2021 | 17/08/2021 | ||
Car Wash Gosling Stadium Stanborough Road | 02/02/2022 | 23/02/2022 | ||
Golf Driving Range Gosling Stadium Stanborough Road | 02/02/2022 | 23/02/2022 | ||
3 West Burrowfield Welwyn Garden City AL7 4TW | 27/07/2021 | 17/08/2021 | ||
Coffee Shop Stanborough Park Stanborough Road Welwyn Garden City AL8 6DR | 27/07/2021 | 17/08/2021 | ||
Terranova Restaurant Stanborough Park Stanborough Road Welwyn Garden City AL8 6DF | 27/07/2021 | 17/08/2021 | ||
Gosling Stadium Stanborough Road | 02/02/2022 | 23/02/2022 |
Application Number | Proposal | Decision | Distance |
---|---|---|---|
6/2025/0419/ADV | Installation of illuminated signage and logos mounted on building façade | 0 | |
6/2025/0410/COND | Submission of details pursuant to condition number 18 (Scheme to mitigate noise from new plant and equipment) on planning permission 6/2022/2249/VAR | 0 | |
6/2024/1906/TPO | T1. Ash - Behind the substation adjacent to the waste tyre store. Cut back the overhang by 4-5 metres, cutting to viable growth, and remove any deadwood G1. Mixed Trees - Cut back the overhanging Ash Trees to the fence line and remove the self-set Ash. Cut the Hawthorns adjacent to fence height and cut back the Ivy. T2. Oak - Lift the lower branches giving 3 metres clearance off the ground. Cut back the overhanging branches touching the building by 4-5 metres. | Withdrawn | 0 |
6/2024/1701/COND | Submission of details pursuant of conditions 13 (management and maintenance plan for the SuDS features and drainage network) on planning permission 6/2022/2249/VAR | Granted | 0 |
6/2024/1510/COND | Submission of details pursuant to condition number 17 (Samples of Materials) on planning consent 6/2022/2249/VAR | Granted | 0 |
6/2024/0680/COND | Submission of details pursuant to condition number 4 Parts A (Site Characterisation) and B (Submission of Remediation Scheme) (Phase 2 only) on planning permission 6/2022/2249/VAR | Granted | 0 |
6/2024/0253/COND | Submission of details pursuant to condition 4 (Part A- Site Characterisation and Part B - Remediation Scheme) for Phase 1 on planning permission 6/2022/2249/VAR | Granted | 0 |
6/2023/2082/COND | Submission of details pursuant to condition 15 (noise) on planning permission 6/2022/2249/VAR | Granted | 0 |
6/2023/1957/COND | Submission of details pursuant to conditions 1 (Parking), 6 (Construction Traffic Management Plan - Phases 1 and 2) and 7 (Details of Haul Road) on planning permission 6/2022/2249/VAR | Granted | 0 |
6/2023/1079/COND | Submission of details pursuant of condition 10 (Landscape and Ecology Management Plan) attached to planning application 6/2022/2249VAR (a variation of application ref: 6/2021/2125/MAJ) | Granted | 0 |
6/2023/0435/COND | Submission of details pursuant to condition 5 (surface water drainage scheme) attached to planning application 6/2022/2249VAR (a variation of application ref: 6/2021/2125/MAJ) | Granted | 0 |
6/2023/0190/COND | Submission of details pursuant to condition 3 (archaeological report for Part A & B, items 2 to 6 for Phases 1, excluding decant building) on planning permission 6/2021/2125/MAJ | Granted | 0 |
6/2022/2893/COND | Submission of details pursuant of Condition 1 (Gosling Sports Park Car Park) Condition 6 (Construction Traffic Management Plan) Condition 7 (Haul Road (fencing, gates and final materials) Condition 9 (Car parking – disabled access) Condition 17 (Phase 2 Disabled Access) on planning permission 6/2021/2125/MAJ | Granted | 0 |
6/2022/2847/COND | Submission of details pursuant to Condition 4 A (partial discharge site characterisation) and B (partial discharge remediation scheme) attached to planning application 6/2022/2249VAR (a variation of application ref: 6/2021/2125/MAJ) | Part Discharged | 0 |
6/2022/2459/COND | Submission of details pursuant to condition 5 (Surface Water Drainage Scheme - Partial, Phases 2 + 3) on planning permission 6/2021/2125/MAJ | Refused | 0 |
6/2022/2460/COND | Submission of details pursuant to condition 8 (Landscape Management Plan - Memorial Garden, attenuation pond and car parking area to the south) on planning permission 6/2021/2125/MAJ | Granted | 0 |
6/2022/2422/COND | Submission of details pursuant of condition 7 (haul road fencing and gates) condition 11 (LEMP) condition 12 (external materials phase 1) condition 18 (external materials phase 2) on planning permission 6/2021/2125/MAJ | Refused | 0 |
6/2022/2335/COND | Submission of details pursuant of condition 5 (Memorial Garden, the Attenuation Pond, the Dog’s Unit and the Haul Road) on planning permission 6/2021/2125/MAJ | Refused | 0 |
6/2022/2284/COND | Submission of details pursuant to condition 2 (Construction environment management plan), 6 (Construction traffic management plan) and 15 (Fire hydrants) on planning permission 6/2021/2125/MAJ | Part Approved / Part Refused | 0 |
6/2022/2249/VAR | Variation of condition 1 (parking), amendment of condition 3 (archaeological significance), amendment of condition 9 (phase 1 disabled access), removal of condition 10 (shipping containers), amendment of condition 13 (phase 1 main application site and Gosling Sports Centre, amendment of condition 17 (phase 2 materials), amendment of condition 20 (phase 3 submission of non-native species management plan, revision of phase numbers on condition 21 (hard and soft landscaping), 22 (cycle provision), 23 (motorcycle provision), 24 (car parking), 25 (parking), 26 (removal of temporary buildings), 27 (surface water) and variation of condition 33 (approved plans) on planning reference 6/2021/2125/MAJ | Granted | 0 |
6/2022/2164/COND | Submission of details pursuant to Condition 3a (archaeological significance) on planning permission 6/2021/2125/MAJ | Granted | 0 |
6/2022/2065/COND | Submission of details pursuant to conditions 1 (Gosling Sports Park car park), 9 (phase 1 car parking disabled access), 13 (c only) (tree protection), 17 (phase 2 - car parking disabled access), and 20 (phase 3 non-native species management) on planning application 6/2021/2125/MAJ | Part Approved / Part Refused | 0 |
6/2017/1273/COND | Submission of details pursuant to condition 1 (parking during construction) on planning permission 6/2017/0504/FULL dated 01/06/2017 | Granted | 0 |
6/2017/0504/FULL | Alterations to existing highway junction, internal access road and car park, including replacement parking spaces, and erection of new security fencing and gates. | Granted | 0 |
C6/1987/0407/CC | Change of use from dormitory block to offices | Granted | 0 |
C6/1988/1255/FP | Siting of two temporary portable buildings for use as site office, with portable toilets and wash cabin | Granted | 0 |
N6/2014/2149/FP | Proposed enlargement of existing police firearms training range including enlarged replacement bullet catcher and backstop, erection of single storey support building and associated landscaping | Granted | 0 |
N6/2012/0854/MA | Formation of new firearms training range, replacement bullet catcher and backstop structure with associated landscaping | Granted | 0 |
N6/2011/0952/FP | Replacement bullet proof catcher and backstop structure | Granted | 0 |
N6/2011/0074/FP | Installation of 120cm aperture terminal and 200cm encasing radome (radar dish dome) in an enclosed fenced area | Granted | 0 |
N6/2006/0076/FP | INSTALLATION OF NEW PETROL TANK | Granted | 0 |
N6/2005/1605/FP | Conversion of existing Sports Hall. Erection of two storey extension to create Spa Centre, demolition of existing Golf Driving Range and construction of New Two Storey Driving Range, Shop and associated external works | Granted | 0 |
N6/2005/0524/FP | REMOVE EXISTING 36 METRE TELECOMS MAST & ERECTION OF A NEW 45 METRE TELECOMS MAST WITHIN FENCED COMPOUND | Granted | 0 |
N6/2004/0593/AD | ERECTION OF 2 FREE STANDING INTERNALLY ILLUMINATED TOTEM SIGNS | Granted | 0 |
N6/2003/0949/FP | PHASED REDEVELOPMENT OF EXISTING POLICE AUTHORITY HEADQUARTERS INVOLVING PARTIAL DEMOLITION AND CONSTRUCTION OF UP TO A TOTAL OF 20,000 SQUARE METRES OF B1 OFFICE FLOORSPACE, CREATION OF NEW EMERGENCY ACCESS, EXTENSION AND RECONFIGURATION OF EXISTING CAR PARKING, RELOCATION OF EXISTING TELECOMMUNICATIONS MAST AND AERIALS AND COMPREHENSIVE LANDSCAPING | Approval Subject to s106 | 0 |
N6/2002/0895/FP | RETENTION OF MOBILE UNIT | Granted | 0 |
N6/2002/0752/DT | SIX PANEL ANTENNAS, FOUR DISH ANTENNAS TO EXISTING MAST, EQUIPMENT CABIN AND ASSOCIATED DEVELOPMENT | Granted | 0 |
N6/2001/1255/FP | ERECTION OF SINGLE STOREY COMMUNICATIONS BUILDING WITH FLAT ROOF WITHIN EXISTING RETAINING WALL | Granted | 0 |
N6/2001/1143/FP | CHANGE OF USE OF DWELLING TO OFFICE ACCOMMODATION | Granted | 0 |
N6/2001/0755/FP | REPLACEMENT OF FLAT ROOFS OVER GARAGE, ADMINISTRATION / STORES & VEHICLE MAINTENANCE BUILDING, TO PITCHED METAL SHEETING ROOFS | Granted | 0 |
N6/2001/0543/FP | CONVERSION OF PART OF GARAGE BLOCK TO FORM BRIEFING ROOM, LOCKER ROOM AND ANCILLARY ACCOMMODATION | Granted | 0 |
N6/2000/1490/FP | NON COMPLIANCE WITH CONDITION 2 OF PLANNING PERMISSION N6/0929/98 TO PERMIT CONTINUED USE OF TEMPORARY BUILDING AS OFFICE ACCOMMODATION | Granted | 0 |
N6/2000/0751/FP | NEW SCIENTIFIC SERVICES BUILDING | Granted | 0 |
N6/2000/0666/OP | OUTLINE APPLICATION FOR NEW SCIENCE SERVICES BUILDING | Granted | 0 |
N6/2000/0561/FP | ALTERATIONS TO ELEVATIONS | Granted | 0 |
N6/2000/0450/FP | CONSTRUCTION OF NEW CAR PARK AND OPEN TRAINING FACILITY AND TWO 8M PYLONS WITH LIGHTING | Granted | 0 |
N6/2000/0311/FP | INSTALLATION OF EXTERNAL DISABLED ACCESS CHAIR LIFT | Granted | 0 |
N6/1999/0706/FP | Change of use of garage to office | Granted | 0 |
N6/1999/0368/FP | Change of use of garage/workshop to office use | Granted | 0 |
N6/1999/0369/FP | Change of use of first floor accommodation to office use | Granted | 0 |
N6/1999/0046/FP | Change of use of garage for use as office | Granted | 0 |
N6/1998/0929/FP | Non compliance with condition 2 of planning permission N6/0384/95/FP to permit continued use of temporary building as office accommodation | Granted | 0 |
N6/1998/0603/FP | Erection of 2.1m high gates and mesh fence to form compound | Granted | 0 |
N6/1998/0593/FP | Rentention of temporary building for office use | Granted | 0 |
N6/1998/0304/FP | Installation of window | Granted | 0 |
N6/1998/0064/FP | Provision of portable storage unit within a fenced compound with external lighting | Granted | 0 |
N6/1998/0065/FP | Erection of 2.1 metre high weld mesh fence around site perimeter | Granted | 0 |
N6/1998/0066/FP | Insertion of 5 No. windows in north east elevation of stores building | Granted | 0 |
N6/1996/0952/FP | Provision of additional car parking and erection of 2 No. cycle sheds | Granted | 0 |
N6/1996/0644/FP | Extension to golf practice bays, and provision of single storey store and office/video room | Granted | 0 |
N6/1996/0625/FP | Retention of a portakabin for office use. (Renewal of planning permission Ref: N6/0384/95/FP) | Granted | 0 |
N6/1995/0384/FP | Siting of portakabin (Renewal of previous planning permission N6/0219/94) | Granted | 0 |
N6/1994/0781/FP | Retention of existing mobile office unit, and erection of single storey extension. | Granted | 0 |
N6/1994/0724/FP | Change of use of 3 No. hostel blocks to offices for police use, and an additional 57 No. car parking spaces | Granted | 0 |
N6/1994/0219/FP | Siting of portakabin | Granted | 0 |
S6/1992/0705/FP | Demolition of existing single storey flat roof rear extension and erection of replacement extension incorporating pitched roof with dormer windows | Deemed Refusal | 0 |
N6/1992/0615/TP | Various tree works in rear garden | Granted | 0 |
N6/1992/0514/FP | Temporary siting of portakabin (renewal of consent N6/0863/91/FP) | Granted | 0 |
S6/1992/0163/TP | Fell one ash tree | Granted | 0 |
N6/1992/0109/FP | Erection of temporary building for use as offices | Granted | 0 |
N6/1991/0806/FP | Formation of landscaping Bund | Withdrawn | 0 |
N6/1991/0863/FP | Siting of two temporary portable buildings for office use for 8 months (renewal of consent N6/1255/88/fp) | Granted | 0 |
N6/1990/7062/AD | Illuminated and non-illuminated wall signs and logos and non-illuminated direction signs | Granted | 0 |
N6/1989/0675/FP | Temporary access for ski slope construction | Granted | 0 |
N6/1989/0410/FP | Erection of indoor tennis hall, bowls hall, ski lodge and administrative centre; the formation of outdoor tennis courts, bowling green and golf range together with associated car parking | Granted | 0 |
N6/1989/0280/FP | Erection of a new dry ski slope with ski tow and floodlighting | Granted | 0 |
C6/1986/0074/FP | 2 Temporary portable buildings for use as site offices with portable toilet/wash cabin | Granted | 0 |
C6/1985/0593/CC | New dog kennels and enclosure | Granted | 0 |
C6/1984/0750/ | Extension and alterations to radio workshop. | No Information | 0 |
N6/1983/0050/CC | Communication centre and office extension to the existing office block | Granted | 0 |
N6/1983/0085/CC | Replacement of existing 36 metres high tubular steel radio tower | Granted | 0 |
N6/1982/0273/ | Raising of ground level with non-toxic waste to extend playing field. (Two sites to one Application Ref No.) | Granted | 0 |
N6/1977/0250/CC | Open air firearms range | Granted | 0 |
N6/1976/0263/CC | Office accommodation | Granted | 0 |
N6/1975/0263/ | New pedestrian access | Granted | 0 |
There are no NMAs associated with this application