Return to search results
-
Start a new search
- The consultation period for this application has now closed
Planning Application: 6/2020/1463/FULL
FULL PERMISSION
|
Decided - Refused
|
Ms Clare Howe
|
c.howe@welhat.gov.uk
|
1 Maynard Place Cuffley Potters Bar EN6 4JA
|
Erection of a one storey roof extension to create no 6 flats including 3 x 1 bed and 3 x 2 bed flats, associated parking and cycle and refuse provision.
|
530474
|
202727
|
|
|
Northaw and Cuffley
|
100081162253
|
22/06/2020
|
23/06/2020
|
|
23/07/2020
|
13/08/2020
|
|
Brooks Murray Architects Brooks Architects
|
|
Morris Place
Finsbury Park
N4 3JG
|
69 Woodlands
London
NW11 9QS
|
Description | Distance |
---|---|
Parish | 0.00 |
Article 4 Direction Misc (inc Walls, Gates, Gardens) | 0.00 |
Flood Zone Surface Water 1000mm | 0.00 |
Hertfordshire Ecological Network | 0.00 |
Sand and Gravel Belt | 0.00 |
Refused
|
10/09/2020
|
10/09/2020
|
Delegated
|
|
To download a selection of individual documents place a tick alongside each of the relevant rows and then click on Download selected files. To download all of the documents place a tick in the box alongside the header row and all of the files will be selected, then click on Download selected files. To view individual documents click on the File for the required row.
File | Description | Date Uploaded | |
---|---|---|---|
Application Form - Without Personal Information | |||
File: ApplicationFormRedacted.pdf (0 kb) | Description: Applicationformredacted | Created Date: 23/06/2020 | |
Location Plan | |||
File: 1254.01.001 - Proposed Location Plan(1).pdf (0 kb) | Description: Proposed Location Plan | Created Date: 23/06/2020 | |
Plans | |||
File: 1254.01.002 - Proposed Block Plan(1).pdf (0 kb) | Description: Proposed Block Plan | Created Date: 23/06/2020 | |
File: 1254.01.010 - Existing Ground and First Floor Plan.pdf (0 kb) | Description: Existing Ground And First Floor Plan | Created Date: 23/06/2020 | |
File: 1254.01.011 - Existing Second Floor and Roof Plan.pdf (0 kb) | Description: Existing Second Floor And Roof Plan | Created Date: 23/06/2020 | |
File: 1254.01.020 - Existing East and West Elevation.pdf (0 kb) | Description: Existing East And West Elevation | Created Date: 23/06/2020 | |
File: 1254.01.021 - Existing North and South Elevation.pdf (0 kb) | Description: Existing North And South Elevation | Created Date: 23/06/2020 | |
File: 1254.01.101 - Proposed First and Second Floor Plan.pdf (0 kb) | Description: Proposed First And Second Floor Plan | Created Date: 23/06/2020 | |
File: 1254.01.102 - Proposed Third Floor Plan.pdf (0 kb) | Description: Proposed Third Floor Plan | Created Date: 23/06/2020 | |
File: 1254.01.103 - Proposed Roof Plan.pdf (0 kb) | Description: Proposed Roof Plan | Created Date: 23/06/2020 | |
File: 1254.01.200 - Proposed East and West Elevation.pdf (0 kb) | Description: Proposed East And West Elevation | Created Date: 23/06/2020 | |
File: 1254.01.201 - Proposed North and South Elevation.pdf (0 kb) | Description: Proposed North And South Elevation | Created Date: 23/06/2020 | |
File: 1254.01.202 - Proposed Long South Elevation.pdf (0 kb) | Description: Proposed Long South Elevation | Created Date: 23/06/2020 | |
File: 1254.01.300 - Existing and Proposed Section A-A.pdf (0 kb) | Description: Existing And Proposed Section A A | Created Date: 23/06/2020 | |
File: 2000460-001D Car Park layout(1).pdf (0 kb) | Description: Car Park Swept Analysis | Created Date: 06/08/2020 | |
Design & Access Statement | |||
File: 1254.01 - DAS(1).pdf (0 kb) | Description: Design and Access Statement | Created Date: 23/06/2020 | |
Transport Statement | |||
File: 20-03-02 - 2000460-01 - Transport Technical Note (2000460-01B) Rev B.pdf (0 kb) | Description: Transport Technical Note | Created Date: 23/06/2020 | |
Consultee Response | |||
File: Comments.pdf (0 kb) | Description: Comment - Hertfordshire Constabulary | Created Date: 06/07/2020 | |
File: Ref 6_2020_1463_FULL - roof extension to 1 Maynard Place, Cuffley.pdf (0 kb) | Description: Comment - Network Rail | Created Date: 20/07/2020 | |
File: WK118620 - Delicious Deli 1 Maynard Place.pdf (0 kb) | Description: Conditional Response - Public Health & Protection | Created Date: 21/07/2020 | |
File: Comments(1).pdf (0 kb) | Description: Comment - Parking Services | Created Date: 26/07/2020 | |
File: Response_6-2020-1463-FULL.pdf (0 kb) | Description: Objection - Herts Transp Prog & Stratergy | Created Date: 30/07/2020 | |
File: 620201463 - LLFA 05.08.2020.pdf (0 kb) | Description: Comment - Lead Local Flood Authority | Created Date: 01/09/2020 | |
File: Response_6-2020-1463-FULL(2).pdf (0 kb) | Description: Objection - Herts Transport programmes & Strategy | Created Date: 01/09/2020 | |
Neighbour Representation - Without Personal Information | |||
File: plan_ss_16-07-2020_12-38-57_2_Redacted.pdf (0 kb) | Description: Objection - 5 Bittern Close - Redacted | Created Date: 08/07/2020 | |
File: plan_ss_16-07-2020_12-38-57_1_Redacted.pdf (0 kb) | Description: Objection - 1A Station Close - Redacted | Created Date: 09/07/2020 | |
File: Planning Objection_Redacted.pdf (0 kb) | Description: Objection - 20 Maynard Place - Attachment - Redacted | Created Date: 09/07/2020 | |
File: 20 Maynard Place, Cuffley, Potters Bar, EN6 4JA Objection 09-07-2020-Redacted.pdf (0 kb) | Description: Objection - 20 Maynard Place -Redacted | Created Date: 09/07/2020 | |
File: 3288794B-1B73-4294-A94A-7459F2CB76BE.pdf (0 kb) | Description: Objection - 21 Maynard Place -Redacted - Photo | Created Date: 10/07/2020 | |
File: AE3F8542-84B0-4980-9061-964A2B379DA7.pdf (0 kb) | Description: Objection - 21 Maynard Place -Redacted - Photo | Created Date: 10/07/2020 | |
File: 21 Maynard Place, Cuffley, Potters Bar, EN6 4JA Objection 10-07-2020-Redacted.pdf (0 kb) | Description: Objection - 21 Maynard Place -Redacted | Created Date: 10/07/2020 | |
File: 175 Willow Road Objection 15-07-2020-Redacted.pdf (0 kb) | Description: Objection - 175 Willow Road -Redacted | Created Date: 15/07/2020 | |
File: planning objection 15.7.20_Redacted.pdf (0 kb) | Description: Objection - 175 Willow Road - Attachment - Redacted | Created Date: 15/07/2020 | |
File: 6_2020_1463_FULL .....ref._Redacted.pdf (0 kb) | Description: Support - 11 Maynard Place - Redacted | Created Date: 15/07/2020 | |
File: 20 The Meadway, Cuffley, Potters Bar, EN6 4ES Objection 18-07-2020-Redacted.pdf (0 kb) | Description: Objection - 20 The Meadway -Redacted | Created Date: 18/07/2020 | |
File: MAYNARD PLACE PDF.pdf (0 kb) | Description: Objection - 20 The Meadway - Attachment | Created Date: 18/07/2020 | |
File: 9 Maynard Place, Cuffley, Potters Bar, EN6 4JA Objection 19-07-2020-Redacted.pdf (0 kb) | Description: Objection - 9 Maynard Place -Redacted | Created Date: 19/07/2020 | |
File: 9 Maynard Place, Cuffley, Potters Bar, EN6 4JA Support 19-07-2020-Redacted.pdf (0 kb) | Description: Supoort - 9 Maynard Place -Redacted | Created Date: 19/07/2020 | |
File: 9 Maynard Place, Cuffley, Potters Bar, EN6 4JA Comment 19-07-2020-Redacted.pdf (0 kb) | Description: Comment - 9 Maynard Place -Redacted | Created Date: 19/07/2020 | |
File: 14 Maynard Place, Cuffley, Potters Bar, EN6 4JA Objection 19-07-2020-Redacted.pdf (0 kb) | Description: Objection - 14 Maynard Place -Redacted | Created Date: 19/07/2020 | |
File: Maynard Place extension objection 08-07-2020_Redacted.pdf (0 kb) | Description: Objection - 14 Maynard Place -Attachment Redacted | Created Date: 19/07/2020 | |
File: FW_ 6_2020_1463_FULL .....ref._Redacted.pdf (0 kb) | Description: Support - 11 Maynards Place - Redacted | Created Date: 15/07/2020 | |
File: 17 Maynard Place, Cuffley, Potters Bar, EN6 4JA Objection 20-07-2020-Redacted.pdf (0 kb) | Description: Objection - 17 Maynard Place -Redacted | Created Date: 20/07/2020 | |
File: 5 Plough Hill, Cuffley, Potters Bar, EN6 4DN Objection 20-07-2020-Redacted.pdf (0 kb) | Description: Objection - 5 Plough Hill -Redacted | Created Date: 20/07/2020 | |
File: 21 Maynard Place, Cuffley, Potters Bar, EN6 4JA Objection 21-07-2020-Redacted.pdf (0 kb) | Description: Objection - 21 Maynard Place -Redacted | Created Date: 21/07/2020 | |
File: Maynard Palce Objection.pdf (0 kb) | Description: Objection - 2 Plough Hill - Attachment | Created Date: 21/07/2020 | |
File: 2 Plough Hill, Cuffley, Potters Bar, EN6 4DR Objection 21-07-2020-Redacted.pdf (0 kb) | Description: Objection - 2 Plough Hill -Redacted | Created Date: 21/07/2020 | |
File: 2A Plough Hill, Cuffley, Potters Bar, EN6 4DR Objection 22-07-2020-Redacted.pdf (0 kb) | Description: Objection - 2A Plough Hill -Redacted | Created Date: 22/07/2020 | |
File: 2B Plough Hill, Cuffley, Potters Bar, EN6 4DR Objection 22-07-2020-Redacted.pdf (0 kb) | Description: Objection - 2B Plough Hill -Redacted | Created Date: 22/07/2020 | |
File: 115 Brookside Crescent, Cuffley, Potters Bar, EN6 4QP Objection 22-07-2020-Redacted.pdf (0 kb) | Description: Objection - 115 Brookside Crescent -Redacted | Created Date: 22/07/2020 | |
File: The Flat, 1 Station Road, Cuffley, Potters Bar, EN6 4HU Objection 22-07-2020-Redacted.pdf (0 kb) | Description: Objection - The Flat 1 Station Road - Redacted | Created Date: 22/07/2020 | |
File: 6_2020_1463_FULL_Objection.pdf (0 kb) | Description: Objection - 4 Plough Hill- Attachment | Created Date: 22/07/2020 | |
File: IMG_0947_Redacted.pdf (0 kb) | Description: Objection - 8 Maynard Place -Redacted - Photo | Created Date: 23/07/2020 | |
File: IMG_0850_Redacted.pdf (0 kb) | Description: Objection - 8 Maynard Place -Redacted - Photo | Created Date: 23/07/2020 | |
File: 8 Maynard Place, Cuffley, Potters Bar, EN6 4JA Objection 23-07-2020-Redacted.pdf (0 kb) | Description: Objection - 8 Maynard Place - Part 2 - Redacted | Created Date: 23/07/2020 | |
Officer Report | |||
File: Delegated Report_620201463FULL.pdf (0 kb) | Description: Delegated Report | Created Date: 10/09/2020 | |
Correspondence | |||
File: Email-FW 1254 01 - Maynard Place - 6 2020 1463 FULL.msg (0 kb) | Description: Email from Agent - Transport Consultation Response | Created Date: 06/08/2020 | |
Decision Notice | |||
File: Decision Notice_620201463FULL.pdf (0 kb) | Description: Decision Notice | Created Date: 10/09/2020 | |
Site Notice | |||
File: Site Notice_620201463FULL.pdf (0 kb) | Description: Site Notice | Created Date: 23/07/2020 |
Organisation | Name | Sent | Reply Due | Reply Received |
---|---|---|---|---|
Herts & Middlesex Wildlife Trust | 03/07/2020 | 24/07/2020 | ||
Herts & Middlesex Wildlife Trust | 10/09/2020 | |||
Welwyn Hatfield Borough Council | Councillor Bernard Sarson | 12/08/2020 | 22/08/2020 | |
Welwyn Hatfield Borough Council | Councillor Bernard Sarson | 10/09/2020 | ||
Welwyn Hatfield Borough Council | Councillor Bernard Sarson | 02/07/2020 | 23/07/2020 | |
Welwyn Hatfield Borough Council | Councillor George Michaelides | 02/07/2020 | 23/07/2020 | |
Welwyn Hatfield Borough Council | Councillor George Michaelides | 12/08/2020 | 22/08/2020 | |
Welwyn Hatfield Borough Council | Councillor George Michaelides | 10/09/2020 | ||
Welwyn Hatfield Borough Council | Councillor Simon Wrenn | 10/09/2020 | ||
Welwyn Hatfield Borough Council | Councillor Simon Wrenn | 12/08/2020 | 22/08/2020 | |
Welwyn Hatfield Borough Council | Councillor Simon Wrenn | 02/07/2020 | 23/07/2020 | |
Lead Local Flood Authority | Fiona Lai | 03/07/2020 | 24/07/2020 | 19/08/2020 |
Lead Local Flood Authority | Fiona Lai | 10/09/2020 | ||
Hertfordshire Constabulary | Gerry Brophy | 10/09/2020 | ||
Hertfordshire Constabulary | Gerry Brophy | 03/07/2020 | 24/07/2020 | 06/07/2020 |
Hertfordshire County Council | Hertfordshire Transport Programmes & Strategy | 03/07/2020 | 24/07/2020 | 30/07/2020 |
Hertfordshire County Council | Hertfordshire Transport Programmes & Strategy | 10/09/2020 | ||
Hertfordshire County Council | Hertfordshire Transport Programmes & Strategy | 12/08/2020 | 22/08/2020 | 01/09/2020 |
HFRS Fire Protection | Kathleen Montgomery | 10/09/2020 | ||
HFRS Fire Protection | Kathleen Montgomery | 03/07/2020 | 24/07/2020 | |
WHBC - Client Services | Lorraine Davis | 10/09/2020 | ||
WHBC - Client Services | Lorraine Davis | 02/07/2020 | 23/07/2020 | |
Hertfordshire Ecology | Martin Hicks | 03/07/2020 | 24/07/2020 | |
Hertfordshire Ecology | Martin Hicks | 10/09/2020 | ||
Network Rail | Mr Matt Leighton | 10/09/2020 | ||
Network Rail | Mr Matt Leighton | 03/07/2020 | 24/07/2020 | 20/07/2020 |
Environment Agency | Natasha Smith | 03/07/2020 | 24/07/2020 | |
Environment Agency | Natasha Smith | 10/09/2020 | ||
Thames Water, Development Control | Nicky McHugh | 10/09/2020 | ||
Thames Water, Development Control | Nicky McHugh | 03/07/2020 | 24/07/2020 | |
Welwyn Hatfield Borough Council | Parking Services | 10/09/2020 | ||
Welwyn Hatfield Borough Council | Parking Services | 03/07/2020 | 24/07/2020 | |
Highways England | Planning | 10/09/2020 | ||
Highways England | Planning | 03/07/2020 | 24/07/2020 | |
Affinity Water Ltd | Planning Team | 03/07/2020 | 24/07/2020 | |
Affinity Water Ltd | Planning Team | 10/09/2020 | ||
WHBC - Public Health and Protection | Public Health and Protection | 02/07/2020 | 23/07/2020 | 21/07/2020 |
WHBC - Public Health and Protection | Public Health and Protection | 10/09/2020 | ||
Northaw & Cuffley Parish Council | The Clerk | 02/07/2020 | 23/07/2020 | |
Northaw & Cuffley Parish Council | The Clerk | 10/09/2020 |
Address | Date Sent | Expiry Date | Date Reconsulted | Reconsult Expiry Date |
---|---|---|---|---|
J R Property Services | 14/08/2020 | 05/09/2020 | ||
11 Maynard Place Cuffley Potters Bar EN6 4JA | 14/08/2020 | 05/09/2020 | ||
175 Willow Road | 14/08/2020 | 05/09/2020 | ||
6 Maynard Place Station Road Cuffley EN6 4JA | 02/07/2020 | 23/07/2020 | 14/08/2020 | 05/09/2020 |
2 Valley View Goffs Oak EN7 5HL | 02/07/2020 | 23/07/2020 | 14/08/2020 | 05/09/2020 |
26 Station Road Cuffley EN6 4HT | 02/07/2020 | 23/07/2020 | 14/08/2020 | 05/09/2020 |
145 Hertford Road Edmonton London N9 7EL | 02/07/2020 | 23/07/2020 | 14/08/2020 | 05/09/2020 |
24 Station Road Cuffley EN6 4HT | 02/07/2020 | 23/07/2020 | 14/08/2020 | 05/09/2020 |
8 Baytree Close Cheshunt Waltham Cross EN7 6BN | 02/07/2020 | 23/07/2020 | 14/08/2020 | 05/09/2020 |
5 Bittern Close Cheshunt Hertfordshire EN7 6WF | 02/07/2020 | 23/07/2020 | 14/08/2020 | 05/09/2020 |
8 Maynard Place Station Road Cuffley EN6 4JA | 02/07/2020 | 23/07/2020 | 14/08/2020 | 05/09/2020 |
51 Theobalds Road Cuffley EN6 4HL | 02/07/2020 | 23/07/2020 | 14/08/2020 | 05/09/2020 |
14 Maynard Place Station Road Cuffley EN6 4JA | 02/07/2020 | 23/07/2020 | 14/08/2020 | 05/09/2020 |
17 The Elms Hertford Hertfordshire SG13 7UY | 02/07/2020 | 23/07/2020 | 14/08/2020 | 05/09/2020 |
21 Maynard Place Station Road Cuffley EN6 4JA | 02/07/2020 | 23/07/2020 | 14/08/2020 | 05/09/2020 |
17 Maynard Place Station Road Cuffley EN6 4JA | 02/07/2020 | 23/07/2020 | 14/08/2020 | 05/09/2020 |
175 Willow Road Enfield Middlesex EN1 3BT | 02/07/2020 | 23/07/2020 | 14/08/2020 | 05/09/2020 |
8 Ploug Hill Cuffley EN6 4DR | 02/07/2020 | 23/07/2020 | 14/08/2020 | 05/09/2020 |
7 Maynard Place Station Road Cuffley EN6 4JA | 02/07/2020 | 23/07/2020 | 14/08/2020 | 05/09/2020 |
9 Maynard Place Station Road Cuffley EN6 4JA | 02/07/2020 | 23/07/2020 | 14/08/2020 | 05/09/2020 |
13 The Gardens Brookmans Park Hertsmere AL9 7UL | 02/07/2020 | 23/07/2020 | 14/08/2020 | 05/09/2020 |
TSG House Cranborne Road Potters Bars EN6 3JN | 02/07/2020 | 23/07/2020 | 14/08/2020 | 05/09/2020 |
115 Brookside Crescent Cuffley Potters Bar EN6 4QP | 14/08/2020 | 05/09/2020 | ||
2A Plough Hill Cuffley Potters Bar EN6 4DR | 02/07/2020 | 23/07/2020 | 14/08/2020 | 05/09/2020 |
2B Plough Hill Cuffley Potters Bar EN6 4DR | 02/07/2020 | 23/07/2020 | 14/08/2020 | 05/09/2020 |
2C Plough Hill Cuffley Potters Bar EN6 4DR | 02/07/2020 | 23/07/2020 | 14/08/2020 | 05/09/2020 |
2D Plough Hill Cuffley Potters Bar EN6 4DR | 02/07/2020 | 23/07/2020 | 14/08/2020 | 05/09/2020 |
2 Plough Hill Cuffley Potters Bar EN6 4DR | 02/07/2020 | 23/07/2020 | 14/08/2020 | 05/09/2020 |
4 Plough Hill Cuffley Potters Bar EN6 4DR | 02/07/2020 | 23/07/2020 | 14/08/2020 | 05/09/2020 |
5 Plough Hill Cuffley Potters Bar EN6 4DN | 14/08/2020 | 05/09/2020 | ||
6 Plough Hill Cuffley Potters Bar EN6 4DR | 02/07/2020 | 23/07/2020 | 14/08/2020 | 05/09/2020 |
4A Station Road Cuffley Potters Bar EN6 4HT | 02/07/2020 | 23/07/2020 | 14/08/2020 | 05/09/2020 |
6A Station Road Cuffley Potters Bar EN6 4HT | 02/07/2020 | 23/07/2020 | 14/08/2020 | 05/09/2020 |
10A Station Road Cuffley Potters Bar EN6 4HT | 02/07/2020 | 23/07/2020 | 14/08/2020 | 05/09/2020 |
12A Station Road Cuffley Potters Bar EN6 4HT | 02/07/2020 | 23/07/2020 | 14/08/2020 | 05/09/2020 |
14A Station Road Cuffley Potters Bar EN6 4HT | 02/07/2020 | 23/07/2020 | 14/08/2020 | 05/09/2020 |
17A Station Road Cuffley Potters Bar EN6 4HX | 02/07/2020 | 23/07/2020 | 14/08/2020 | 05/09/2020 |
17B Station Road Cuffley Potters Bar EN6 4HX | 02/07/2020 | 23/07/2020 | 14/08/2020 | 05/09/2020 |
19A Station Road Cuffley Potters Bar EN6 4HX | 02/07/2020 | 23/07/2020 | 14/08/2020 | 05/09/2020 |
19B Station Road Cuffley Potters Bar EN6 4HX | 02/07/2020 | 23/07/2020 | 14/08/2020 | 05/09/2020 |
21A Station Road Cuffley Potters Bar EN6 4HX | 02/07/2020 | 23/07/2020 | 14/08/2020 | 05/09/2020 |
21B Station Road Cuffley Potters Bar EN6 4HX | 02/07/2020 | 23/07/2020 | 14/08/2020 | 05/09/2020 |
23A Station Road Cuffley Potters Bar EN6 4HX | 02/07/2020 | 23/07/2020 | 14/08/2020 | 05/09/2020 |
23B Station Road Cuffley Potters Bar EN6 4HX | 02/07/2020 | 23/07/2020 | 14/08/2020 | 05/09/2020 |
29 Station Road Cuffley Potters Bar EN6 4HX | 02/07/2020 | 23/07/2020 | 14/08/2020 | 05/09/2020 |
31 Station Road Cuffley Potters Bar EN6 4HX | 02/07/2020 | 23/07/2020 | 14/08/2020 | 05/09/2020 |
20 The Meadway Cuffley Potters Bar EN6 4ES | 14/08/2020 | 05/09/2020 | ||
7 Tolmers Gardens Cuffley Potters Bar EN6 4JE | 02/07/2020 | 23/07/2020 | 14/08/2020 | 05/09/2020 |
8 Tolmers Gardens Cuffley Potters Bar EN6 4JE | 02/07/2020 | 23/07/2020 | 14/08/2020 | 05/09/2020 |
9 Tolmers Gardens Cuffley Potters Bar EN6 4JE | 02/07/2020 | 23/07/2020 | 14/08/2020 | 05/09/2020 |
10 Tolmers Gardens Cuffley Potters Bar EN6 4JE | 02/07/2020 | 23/07/2020 | 14/08/2020 | 05/09/2020 |
4 Station Road Cuffley Potters Bar EN6 4HT | 02/07/2020 | 23/07/2020 | 14/08/2020 | 05/09/2020 |
8 Station Road Cuffley Potters Bar EN6 4HT | 02/07/2020 | 23/07/2020 | 14/08/2020 | 05/09/2020 |
2 Station Road Cuffley Potters Bar EN6 4HT | 02/07/2020 | 23/07/2020 | 14/08/2020 | 05/09/2020 |
10 Maynard Place Cuffley Potters Bar EN6 4JA | 02/07/2020 | 23/07/2020 | 14/08/2020 | 05/09/2020 |
11 Maynard Place Cuffley Potters Bar EN6 4JA | 02/07/2020 | 23/07/2020 | 14/08/2020 | 05/09/2020 |
12 Maynard Place Cuffley Potters Bar EN6 4JA | 02/07/2020 | 23/07/2020 | 14/08/2020 | 05/09/2020 |
14 Maynard Place Cuffley Potters Bar EN6 4JA | 02/07/2020 | 23/07/2020 | 14/08/2020 | 05/09/2020 |
15 Maynard Place Cuffley Potters Bar EN6 4JA | 02/07/2020 | 23/07/2020 | 14/08/2020 | 05/09/2020 |
16 Maynard Place Cuffley Potters Bar EN6 4JA | 02/07/2020 | 23/07/2020 | 14/08/2020 | 05/09/2020 |
17 Maynard Place Cuffley Potters Bar EN6 4JA | 02/07/2020 | 23/07/2020 | 14/08/2020 | 05/09/2020 |
18 Maynard Place Cuffley Potters Bar EN6 4JA | 02/07/2020 | 23/07/2020 | 14/08/2020 | 05/09/2020 |
19 Maynard Place Cuffley Potters Bar EN6 4JA | 02/07/2020 | 23/07/2020 | 14/08/2020 | 05/09/2020 |
20 Maynard Place Cuffley Potters Bar EN6 4JA | 02/07/2020 | 23/07/2020 | 14/08/2020 | 05/09/2020 |
21 Maynard Place Cuffley Potters Bar EN6 4JA | 14/08/2020 | 05/09/2020 | ||
21 Maynard Place Cuffley Potters Bar EN6 4JA | 02/07/2020 | 23/07/2020 | 14/08/2020 | 05/09/2020 |
22 Maynard Place Cuffley Potters Bar EN6 4JA | 02/07/2020 | 23/07/2020 | 14/08/2020 | 05/09/2020 |
Cuffley Hall Maynard Place Cuffley Potters Bar EN6 4JA | 02/07/2020 | 23/07/2020 | 14/08/2020 | 05/09/2020 |
9 Maynard Place Cuffley Potters Bar EN6 4JA | 14/08/2020 | 05/09/2020 | ||
9 Maynard Place Cuffley Potters Bar EN6 4JA | 14/08/2020 | 05/09/2020 | ||
9 Maynard Place Cuffley Potters Bar EN6 4JA | 02/07/2020 | 23/07/2020 | 14/08/2020 | 05/09/2020 |
12 Station Road Cuffley Potters Bar EN6 4HT | 02/07/2020 | 23/07/2020 | 14/08/2020 | 05/09/2020 |
6 Station Road Cuffley Potters Bar EN6 4HT | 02/07/2020 | 23/07/2020 | 14/08/2020 | 05/09/2020 |
16A Station Road Cuffley Potters Bar EN6 4HT | 02/07/2020 | 23/07/2020 | 14/08/2020 | 05/09/2020 |
10 Station Road Cuffley Potters Bar EN6 4HT | 02/07/2020 | 23/07/2020 | 14/08/2020 | 05/09/2020 |
16 Station Road Cuffley Potters Bar EN6 4HT | 02/07/2020 | 23/07/2020 | 14/08/2020 | 05/09/2020 |
1A Station Road Cuffley Potters Bar EN6 4HU | 02/07/2020 | 23/07/2020 | 14/08/2020 | 05/09/2020 |
3 Station Road Cuffley Potters Bar EN6 4HU | 02/07/2020 | 23/07/2020 | 14/08/2020 | 05/09/2020 |
17 Station Road Cuffley Potters Bar EN6 4HX | 02/07/2020 | 23/07/2020 | 14/08/2020 | 05/09/2020 |
19-23 Station Road Cuffley Potters Bar EN6 4HX | 02/07/2020 | 23/07/2020 | 14/08/2020 | 05/09/2020 |
27 Station Road Cuffley Potters Bar EN6 4HX | 02/07/2020 | 23/07/2020 | 14/08/2020 | 05/09/2020 |
2 Maynard Place Cuffley Potters Bar EN6 4JA | 02/07/2020 | 23/07/2020 | 14/08/2020 | 05/09/2020 |
3 Maynard Place Cuffley Potters Bar EN6 4JA | 02/07/2020 | 23/07/2020 | 14/08/2020 | 05/09/2020 |
4 Maynard Place Cuffley Potters Bar EN6 4JA | 02/07/2020 | 23/07/2020 | 14/08/2020 | 05/09/2020 |
6 Maynard Place Cuffley Potters Bar EN6 4JA | 02/07/2020 | 23/07/2020 | 14/08/2020 | 05/09/2020 |
7 Maynard Place Cuffley Potters Bar EN6 4JA | 02/07/2020 | 23/07/2020 | 14/08/2020 | 05/09/2020 |
5 Maynard Place Cuffley Potters Bar EN6 4JA | 02/07/2020 | 23/07/2020 | 14/08/2020 | 05/09/2020 |
25 Station Road Cuffley Potters Bar EN6 4HX | 02/07/2020 | 23/07/2020 | 14/08/2020 | 05/09/2020 |
8 Maynard Place Cuffley Potters Bar EN6 4JA | 02/07/2020 | 23/07/2020 | 14/08/2020 | 05/09/2020 |
Telephone Exchange Northaw Road East Cuffley Potters Bar EN6 4LU | 02/07/2020 | 23/07/2020 | 14/08/2020 | 05/09/2020 |
14 Station Road Cuffley Potters Bar EN6 4HT | 02/07/2020 | 23/07/2020 | 14/08/2020 | 05/09/2020 |
Cuffley Library Maynard Place Cuffley Potters Bar EN6 4JA | 02/07/2020 | 23/07/2020 | 14/08/2020 | 05/09/2020 |
1 Station Road Cuffley Potters Bar EN6 4HU | 02/07/2020 | 23/07/2020 | 14/08/2020 | 05/09/2020 |
The Flat 1 Station Road Cuffley Potters Bar EN6 4HU | 02/07/2020 | 23/07/2020 | 14/08/2020 | 05/09/2020 |
Flat 2 Station Road Cuffley Potters Bar EN6 4HT | 02/07/2020 | 23/07/2020 | 14/08/2020 | 05/09/2020 |
Flat 8 Station Road Cuffley Potters Bar EN6 4HT | 02/07/2020 | 23/07/2020 | 14/08/2020 | 05/09/2020 |
2A Station Road Cuffley Potters Bar EN6 4HT | 02/07/2020 | 23/07/2020 | 14/08/2020 | 05/09/2020 |
15A Station Road Cuffley Potters Bar EN6 4HX | 02/07/2020 | 23/07/2020 | 14/08/2020 | 05/09/2020 |
15B Station Road Cuffley Potters Bar EN6 4HX | 02/07/2020 | 23/07/2020 | 14/08/2020 | 05/09/2020 |
15C Station Road Cuffley Potters Bar EN6 4HX | 02/07/2020 | 23/07/2020 | 14/08/2020 | 05/09/2020 |
15D Station Road Cuffley Potters Bar EN6 4HX | 02/07/2020 | 23/07/2020 | 14/08/2020 | 05/09/2020 |
15E Station Road Cuffley Potters Bar EN6 4HX | 02/07/2020 | 23/07/2020 | 14/08/2020 | 05/09/2020 |
15 Station Road Cuffley Potters Bar EN6 4HX | 02/07/2020 | 23/07/2020 | 14/08/2020 | 05/09/2020 |
Gp Practice Maynard Place Cuffley Potters Bar EN6 4JA | 02/07/2020 | 23/07/2020 | 14/08/2020 | 05/09/2020 |
Application Number | Proposal | Decision | Distance |
---|---|---|---|
6/2023/2464/FULL | Alterations to shop front | Granted | 0 |
6/2023/1546/LAWE | Certificate of lawfulness for the existing use of property as cafe/restaurant (Class E) | Granted | 0 |
6/2023/0426/FULL | Renewal of existing kitchen extract system | Granted | 0 |
6/2021/0773/FULL | The erection of a one storey roof extension to create 6 no. flats including 3 x 1 bed and 3 x 2 bed flats, with associated parking and cycle and refuse provision | Refused | 0 |
6/2020/3195/FULL | Replacement shop front to the front and side elevations. | Granted | 0 |
6/2019/2022/ADV | Installation of 2x fascia boards | Granted | 0 |
6/2018/1977/FULL | Change of use from retail (A1) to a mixed use retail and beauty salon (A1 and Sui Generis) | Refused | 0 |
6/2016/1857/VAR | Variation of condition 1 (plans) on planning permission 6/2015/2333/FULL | Granted | 0 |
6/2015/2333/FULL | Erection of 5 new dwellings and shop (Use Class A5) with new access following demolition of shed and two garages | Granted | 0 |
S6/2015/0027/FP | Internal installation of air conditioning system and external installation of heat exchange unit to rear wall | Granted | 0 |
S6/2013/0204/S73B | Variation of condition 1 (time limit) from planning permission S6/2009/1311/FP - Installation of ventilation flue to rear of premises to cover existing extraction fan | Granted | 0 |
S6/2011/2483/FP | Change of use from A1 (Opticians) to D1 (Physiotherapy Clinic) | Granted | 0 |
S6/2010/0458/FP | Change of use Class A1 (Laundry shop) to use class Sui Generis (Dog grooming parlour) with ancillary sales | Granted | 0 |
S6/2009/1311/FP | INSTALLATION OF VENTILATION FLUE TO REAR OF PREMISES TO COVER EXISTING EXTRACTION FAN | Granted | 0 |
S6/2008/0988/FP | INSTALLATION OF NEW SHOP FRONT | Granted | 0 |
S6/2008/0816/FP | CHANGE OF USE FROM A1 TO SUI GENERIS (BEAUTY SALON) | Refused | 0 |
S6/2008/0001/LU | CERTIFICATE OF LAWFULNESS FOR THE USE OF PREMISES AS A BAKERY AND CAFÉ (A3) | Granted | 0 |
S6/2007/0868/FP | CHANGE OF USE FROM CLASS D2 TO CLASS A2 | Granted | 0 |
S6/2003/1175/FP | AIR CONDITIONING UNIT TO SIDE ELEVATION | Granted | 0 |
S6/1994/0381/FP | Addition of flue for use in connection with dry cleaners | Granted | 0 |
S6/1993/0092/FP | Change of use of shop for use as community office | Granted | 0 |
S6/1988/0716/FP | Change of use of premises from retail (Class A1) to restaurant/ takeaway (Class A3) | Refused | 0 |
S6/1984/0155/ | Change of use from dry cleaners to restaurant | Refused | 0 |
S6/1980/0057/ | First floor extension to provide committee room and store | Granted | 0 |
S6/1980/0780/ | Garage for storage purposes | Granted | 0 |
S6/1978/7007/AD | Illuminated canopy sign | Refused | 0 |
S6/1976/0027/ | Change of use from shop to estate agents office | Granted | 0 |
S6/1976/0095/ | Use of shop for the sale of hot food | Granted | 0 |
S6/1976/7009/AD | Non - illuminated poster unit | Refused | 0 |
There are no NMAs associated with this application