Return to search results
-
Start a new search
- The consultation period for this application has now closed
Planning Application: 6/2020/0825/FULL
FULL PERMISSION
|
Decided - Granted
|
Mr William Myers
|
w.myers@welhat.gov.uk
|
Groundwork East Mill Green Hertford Road Hatfield AL9 5PE
|
Erection of office building following demolition of existing office building, with ancillary car parking, cycle storage, external hardstanding and soft landscaping, and the retention of existing ancillary storage buildings
|
524568
|
209905
|
|
|
Hatfield
|
|
01/04/2020
|
21/04/2020
|
|
21/05/2020
|
19/08/2020
|
|
Mr D Murdoch
|
Groundwork East
|
Ivy Cottage
Berden
Bishops Stortford
CM23 1AE
|
Groundwork East, Mill Green
Hertford Road
Hatfield
AL9 5PE
|
Description | Distance |
---|---|
Green Belt | 0.00 |
Landscape Character Area | 0.00 |
Parish | 0.00 |
Cycle Paths | 2.13 |
Flood Zone Surface Water 1000mm | 0.00 |
Hertfordshire Ecological Network | 0.00 |
Hertfordshire Ecological Network | 0.00 |
Sand and Gravel Belt | 0.00 |
Hatfield Heritage Assesment Areas | 0.00 |
Granted
|
20/08/2020
|
20/08/2020
|
Delegated
|
|
To download a selection of individual documents place a tick alongside each of the relevant rows and then click on Download selected files. To download all of the documents place a tick in the box alongside the header row and all of the files will be selected, then click on Download selected files. To view individual documents click on the File for the required row.
File | Description | Date Uploaded | |
---|---|---|---|
Application Form - Without Personal Information | |||
File: ApplicationFormRedacted.pdf (157 kb) | Description: Applicationformredacted | Created Date: 02/04/2020 | |
Block Plan | |||
File: 1633-ADA-Z0-G0-DR-A-2001_2-A3.pdf (455 kb) | Description: Proposed Site Plan | Created Date: 21/04/2020 | |
Elevation and Floor Plans | |||
File: 23215-IBS-ZZ-ZZ-DR-W-1001-S3-P1-Plan_Layout_Elevations.pdf (1394 kb) | Description: Proposed Floor Plan and Elevations | Created Date: 21/04/2020 | |
Elevations | |||
File: Topographical Survey 10131_Elevations.pdf (454 kb) | Description: Existing Elevations | Created Date: 02/04/2020 | |
File: 2256-2020-001 A storage building elevation.pdf (119 kb) | Description: Outbuildings Elevations | Created Date: 30/07/2020 | |
File: 2256-2020-002 bike shed elevation.pdf (116 kb) | Description: Front and Side Cycle Store Elevations | Created Date: 30/07/2020 | |
Landscape Plans | |||
File: Groundwork East Landscape Plan GA_001.pdf (1880 kb) | Description: Groundwork East Landscape Plan Ga 001 | Created Date: 02/04/2020 | |
Location Plan | |||
File: 1633-ADA-Z0-G0-DR-A-1000_2-A3.pdf (135 kb) | Description: Proposed Location Plan | Created Date: 21/04/2020 | |
File: 1633-ADA-Z0-G0-DR-A-1001_2-A3.pdf (136 kb) | Description: Location Plan | Created Date: 21/04/2020 | |
Design & Access Statement | |||
File: DLP Planning Design and Access Statement dated Mar 2020.pdf (914 kb) | Description: Dlp Planning Design And Access Statement Dated Mar 2020 | Created Date: 02/04/2020 | |
Environmental Impact Assessment | |||
File: Green Ecological Assessment dated Jan 2020.pdf (5612 kb) | Description: Green Ecological Assessment Dated Jan 2020 | Created Date: 02/04/2020 | |
Transport Statement | |||
File: WSP Transport Statement Mar 2020.pdf (822 kb) | Description: Wsp Transport Statement Mar 2020 | Created Date: 02/04/2020 | |
File: WSP Transport Statement Mar 2020_Redacted.pdf (573 kb) | Description: Transport Statement - redacted | Created Date: 23/04/2020 | |
Consultee Response | |||
File: Comments.pdf (75 kb) | Description: Comment - WHBC - Client Services | Created Date: 04/05/2020 | |
File: Groundwork East Mill Green Hertford Road.pdf (129 kb) | Description: Conditional - WHBC - Public Health & Protection | Created Date: 01/05/2020 | |
File: Peter Hebden Support 07-05-2020.pdf (75 kb) | Description: Support - Cllr Hebden | Created Date: 07/05/2020 | |
File: Comments(1).pdf (74 kb) | Description: Comment - Public Health and Protection | Created Date: 21/05/2020 | |
File: Comments(2).pdf (75 kb) | Description: Comment - Parking Services | Created Date: 21/05/2020 | |
File: Response_6-2020-0825-FULL.pdf (82 kb) | Description: Comment - Herts Transp Prog & Stratergy | Created Date: 14/05/2020 | |
File: Groundwork East Mill Green Hertford Road Hatfield AL9 5PE 6-2020-0825-FULL_Bird and hedgehog inform_ap.pdf (131 kb) | Description: Comment - Hertfordshire Ecology | Created Date: 20/05/2020 | |
File: Comments(3).pdf (75 kb) | Description: Comment - Client Services | Created Date: 03/08/2020 | |
Neighbour Representation - Without Personal Information | |||
File: FW Groundwork application 0825_Redacted.pdf (9 kb) | Description: Comment - 38 Hazel Grove | Created Date: 12/05/2020 | |
Officer Report | |||
File: Delegated Report_620200825FULL(2).pdf (65 kb) | Description: Delegated Report | Created Date: 20/08/2020 | |
Decision Notice | |||
File: Decision Notice_620200825FULL.pdf (543 kb) | Description: Decision Notice PDF | Created Date: 20/08/2020 | |
Documents | |||
File: DWW-Kirium-Eco-2pp-Jan-20 (1).pdf (858 kb) | Description: Light Specification | Created Date: 07/04/2020 | |
File: DWW-Kirium-Sephora-Sept19.pdf (6643 kb) | Description: Light Specification - pathway illumination | Created Date: 07/04/2020 | |
File: DWW-NEW-Pharola-DS-3.02.16.pdf (2098 kb) | Description: Light Speicification - night time illumination | Created Date: 07/04/2020 | |
File: 2833 External Lighting Calculations.pdf (510 kb) | Description: External Lighting Design | Created Date: 07/04/2020 | |
File: Landscape and Visual Assessment.pdf (5183 kb) | Description: Landscape and Visual Assessment | Created Date: 04/05/2020 | |
Report | |||
File: Green Ecological Assessment dated Jan 2020_Redacted.pdf (5572 kb) | Description: Green Ecological Assessment - redacted | Created Date: 23/04/2020 | |
File: 2833 External Lighting Calculations R1.pdf (599 kb) | Description: External Lighting Calculations R1 | Created Date: 13/05/2020 | |
Site Notice | |||
File: Site Notice_620200825FULL.pdf (85 kb) | Description: Site Notice | Created Date: 27/05/2020 | |
File: Site Notice_620200825FULL(1).pdf (85 kb) | Description: Site Notice | Created Date: 29/07/2020 | |
Site Plan | |||
File: 1633-ADA-Z0-G0-DR-A-2000_2-A3.pdf (269 kb) | Description: Existing Site Plan | Created Date: 21/04/2020 | |
Supporting Information | |||
File: 2833-EX05.pdf (433 kb) | Description: Upward Illumination Lux Plot | Created Date: 07/04/2020 | |
File: 2833-EX02.pdf (444 kb) | Description: Sitewide lux plot | Created Date: 07/04/2020 | |
File: 2833-EX04.pdf (437 kb) | Description: Outisde Site Boundary Lux Plot | Created Date: 07/04/2020 | |
File: 2833-EX01.pdf (404 kb) | Description: Lighting Layout | Created Date: 07/04/2020 | |
File: 2833-EX03.pdf (453 kb) | Description: Vehicle and Pedestrian Areas Lux Plot | Created Date: 07/04/2020 | |
Topographical | |||
File: Topographical Survey 10131_A0-1.pdf (750 kb) | Description: Topographical Survey 10131 A0 1 | Created Date: 02/04/2020 | |
File: Topographical Survey 10131_A0-2.pdf (584 kb) | Description: Topographical Survey 10131 A0 2 | Created Date: 02/04/2020 |
Organisation | Name | Sent | Reply Due | Reply Received |
---|---|---|---|---|
Welwyn Hatfield Borough Council | Councillor Caron Anne Juggins | 29/04/2020 | 20/05/2020 | |
Welwyn Hatfield Borough Council | Councillor Caron Anne Juggins | 30/07/2020 | 09/08/2020 | |
Welwyn Hatfield Borough Council | Councillor Caron Anne Juggins | 20/08/2020 | ||
Welwyn Hatfield Borough Council | Councillor Edward Boulton | 20/08/2020 | ||
Welwyn Hatfield Borough Council | Councillor Edward Boulton | 30/07/2020 | 09/08/2020 | |
Welwyn Hatfield Borough Council | Councillor Edward Boulton | 29/04/2020 | 20/05/2020 | |
Welwyn Hatfield Borough Council | Councillor Peter Hebden | 29/04/2020 | 20/05/2020 | 07/05/2020 |
Welwyn Hatfield Borough Council | Councillor Peter Hebden | 20/08/2020 | ||
Welwyn Hatfield Borough Council | Councillor Peter Hebden | 30/07/2020 | 09/08/2020 | |
Welwyn Hatfield Borough Council | Economic Development | 30/07/2020 | 09/08/2020 | |
Welwyn Hatfield Borough Council | Economic Development | 20/08/2020 | ||
Welwyn Hatfield Borough Council | Economic Development | 29/04/2020 | 20/05/2020 | |
Hertfordshire County Council | Hertfordshire Transport Programmes & Strategy | 29/04/2020 | 20/05/2020 | 14/05/2020 |
Hertfordshire County Council | Hertfordshire Transport Programmes & Strategy | 30/07/2020 | 09/08/2020 | |
Hertfordshire County Council | Hertfordshire Transport Programmes & Strategy | 20/08/2020 | ||
Hatfield Town Council | Jonah Anthony | 30/07/2020 | 09/08/2020 | |
Hatfield Town Council | Jonah Anthony | 20/08/2020 | ||
Hatfield Town Council | Jonah Anthony | 29/04/2020 | 20/05/2020 | |
Welwyn Hatfield Borough Council | Landscapes Department | 29/04/2020 | 20/05/2020 | |
Welwyn Hatfield Borough Council | Landscapes Department | 30/07/2020 | 09/08/2020 | |
Welwyn Hatfield Borough Council | Landscapes Department | 20/08/2020 | ||
WHBC - Client Services | Lorraine Davis | 30/07/2020 | 09/08/2020 | 03/08/2020 |
WHBC - Client Services | Lorraine Davis | 20/08/2020 | ||
WHBC - Client Services | Lorraine Davis | 29/04/2020 | 20/05/2020 | 04/05/2020 |
Hertfordshire Ecology | Martin Hicks | 29/04/2020 | 20/05/2020 | 20/05/2020 |
Hertfordshire Ecology | Martin Hicks | 30/07/2020 | 09/08/2020 | |
Hertfordshire Ecology | Martin Hicks | 20/08/2020 | ||
Welwyn Hatfield Borough Council | Parking Services | 20/08/2020 | ||
Welwyn Hatfield Borough Council | Parking Services | 30/07/2020 | 09/08/2020 | |
Welwyn Hatfield Borough Council | Parking Services | 29/04/2020 | 20/05/2020 | 21/05/2020 |
WHBC - Public Health and Protection | Public Health and Protection | 29/04/2020 | 20/05/2020 | 01/05/2020 |
WHBC - Public Health and Protection | Public Health and Protection | 30/07/2020 | 09/08/2020 | 21/05/2020 |
WHBC - Public Health and Protection | Public Health and Protection | 20/08/2020 |
Address | Date Sent | Expiry Date | Date Reconsulted | Reconsult Expiry Date |
---|---|---|---|---|
38 Hazel Grove Hatfield AL10 9DN | 30/07/2020 | 09/08/2020 | ||
6A Barbaraville Camp Hertford Road Hatfield AL9 5PE | 29/04/2020 | 21/05/2020 | 30/07/2020 | 09/08/2020 |
1A Barbaraville Hertford Road Hatfield AL9 5PE | 29/04/2020 | 21/05/2020 | 30/07/2020 | 09/08/2020 |
1 Barbaraville Camp Hertford Road Hatfield AL9 5PE | 29/04/2020 | 21/05/2020 | 30/07/2020 | 09/08/2020 |
2 Barbaraville Camp Hertford Road Hatfield AL9 5PE | 29/04/2020 | 21/05/2020 | 30/07/2020 | 09/08/2020 |
3 Barbararville Camp Hertford Road Hatfield AL9 5PE | 29/04/2020 | 21/05/2020 | 30/07/2020 | 09/08/2020 |
4 Barbaraville Camp Hertford Road Hatfield AL9 5PE | 29/04/2020 | 21/05/2020 | 30/07/2020 | 09/08/2020 |
5 Barbaraville Camp Hertford Road Hatfield AL9 5PE | 29/04/2020 | 21/05/2020 | 30/07/2020 | 09/08/2020 |
6 Barbaraville Camp Hertford Road Hatfield AL9 5PE | 29/04/2020 | 21/05/2020 | 30/07/2020 | 09/08/2020 |
Mill Green Stw Barbaraville Camp Hertford Road Hatfield AL9 5PE | 29/04/2020 | 21/05/2020 | 30/07/2020 | 09/08/2020 |
Mill Green Sewerage Treatment Works Barbaraville Camp Hertford Road Hatfield AL9 5PE | 29/04/2020 | 21/05/2020 | 30/07/2020 | 09/08/2020 |
7 Barbaraville Camp Hertford Road Hatfield AL9 5PE | 29/04/2020 | 21/05/2020 | 30/07/2020 | 09/08/2020 |
7A Barbaraville Camp Hertford Road Hatfield AL9 5PE | 29/04/2020 | 21/05/2020 | 30/07/2020 | 09/08/2020 |
Application Number | Proposal | Decision | Distance |
---|---|---|---|
6/2022/0747/COND | Submission of details pursuant to condition 1(a) (site characterisation) and 1(b) (submission of remediation scheme); Condition 2 (Construction Management Plan); Condition 3 (Footpath); and Condition 6 (Cycle Storage) on planning application 6/2020/0825/FULL | Granted | 0 |
6/2018/2588/LAWE | Certificate of lawfulness for existing use of Offices (B1) and Training (D1) | Refused | 0 |
N6/2010/1179/FP | Temporary permission for siting of office accommodation and ancillary storage | Granted | 0 |
S6/2007/0159/FP | ERECTION OF NEW SEWER TUNNEL VENTILATION COLUMN | Granted | 0 |
N6/2004/0615/FP | PROPOSED TEMPORARY OFFICE ACCOMMODATION | Granted | 0 |
N6/1998/0423/FP | Extension to existing temporary office | Granted | 0 |
N6/1998/0133/FP | Retention of temporary office accommodation. (Renewal of previous planning permission N6/0691/92/FP) | Granted | 0 |
N6/1997/0716/FP | Use of site as caravan park | Granted | 0 |
N6/1992/0691/FP | Retention of temporary office accommodation (Renewal of previous planning permission Ref C6/0881/87/FP) | Granted | 0 |
N6/1992/0247/FP | Use of site as caravan park | Granted | 0 |
N6/1990/0599/FP | 18 and 9 hole (par 3) golf courses, clubhouse and staff accommodation practice ground and car park | Approval Subject to s106 | 0 |
C6/1987/0881/FP | Erection of temporary office accommodation and resiting of existing temporary office | Granted | 0 |
S6/1983/0807/ | Continued use of land as caravan site | Granted | 0 |
S6/1979/0812/ | Extension to drainage system | Granted | 0 |
S6/1978/0618/ | Continued use of land as caravan site | Granted | 0 |
There are no NMAs associated with this application