Return to search results
-
Start a new search
- The consultation period for this application has now closed
Planning Application: 6/2019/1411/MAJ
MAJOR DEVELOPMENT
|
Decided - Granted
|
Mr David Elmore
|
d.elmore@welhat.gov.uk
|
Plot 5100, Mosquito Way, Hatfield Business Park, Hatfield, AL10 9WN
|
Erection of a multi-franchise car dealership (sui generis use) with offices (B1 use class), workshops (B2 use class) and car storage (B8 use class), together with car parking, cycle parking, boundary treatment, landscaping, lighting and access
|
521346
|
209145
|
|
|
Hatfield
|
10093070916
|
12/06/2019
|
12/06/2019
|
24/07/2019
|
23/07/2019
|
09/08/2019
|
|
Mr R Moxon
|
HR Owen Plc
|
Arlington
1230 Parkview
Arlington Business Park
Theale
Berkshire
RG7 4SA
|
C/O Agent
|
Description | Distance |
---|---|
Employment Area | 0.00 |
Landscape Character Area | 0.00 |
Parish | 0.00 |
Urban Open Land | 0.00 |
Article 4 HMO Direction | 0.00 |
Cycle Paths | 9.64 |
Flood Zone Surface Water 30mm | 0.00 |
Flood Zone Surface Water 100mm | 0.00 |
Flood Zone Surface Water 100mm | 0.00 |
Flood Zone Surface Water 100mm | 0.00 |
Flood Zone Surface Water 100mm | 0.00 |
Flood Zone Surface Water 100mm | 0.00 |
Flood Zone Surface Water 100mm | 0.00 |
Flood Zone Surface Water 100mm | 0.00 |
Flood Zone Surface Water 1000mm | 0.00 |
Flood Zone Surface Water 1000mm | 0.00 |
Flood Zone Surface Water 1000mm | 0.00 |
Flood Zone Surface Water 1000mm | 0.00 |
Flood Zone Surface Water 1000mm | 0.00 |
Flood Zone Surface Water 1000mm | 0.00 |
Flood Zone Surface Water 1000mm | 0.00 |
Flood Zone Surface Water 1000mm | 0.00 |
Flood Zone Surface Water 1000mm | 0.00 |
Flood Zone Surface Water 1000mm | 0.00 |
Flood Zone Surface Water 1000mm | 0.00 |
Flood Zone Surface Water 1000mm | 0.00 |
Flood Zone Surface Water 1000mm | 0.00 |
Flood Zone Surface Water 1000mm | 0.00 |
Hatfield Aerodrome | 0.00 |
Hertfordshire Ecological Network | 0.00 |
Sand and Gravel Belt | 0.00 |
Hatfield Heritage Assesment Areas | 0.00 |
Granted
|
04/09/2020
|
04/09/2020
|
Delegated
|
|
To download a selection of individual documents place a tick alongside each of the relevant rows and then click on Download selected files. To download all of the documents place a tick in the box alongside the header row and all of the files will be selected, then click on Download selected files. To view individual documents click on the File for the required row.
File | Description | Date Uploaded | |
---|---|---|---|
Application Form - Without Personal Information | |||
File: ApplicationFormNoPersonalData.pdf (0 kb) | Description: Applicationformnopersonaldata | Created Date: 12/06/2019 | |
File: ApplicationFormRedacted.pdf (0 kb) | Description: NMA Application Form Redacted | Created Date: 31/12/2020 | |
File: ApplicationFormRedacted(1).pdf (0 kb) | Description: NMA2 Applicationformredacted(1) | Created Date: 11/05/2021 | |
Elevation and Floor Plans | |||
File: 2018-22 A-140 Rev.F - East Showroom Complex - Plans.pdf (0 kb) | Description: East Showroom - Ground & Mezzanine Floor Plan | Created Date: 10/10/2019 | |
File: 1226-001 Rev.E - Landscape General Arrangement Plan.pdf (0 kb) | Description: NMA2 Landscape General Arrangement Plan | Created Date: 11/05/2021 | |
File: 1226-003 Rev.B - Vegetation Retention and Removal Plan.pdf (0 kb) | Description: NMA2 Vegetation Retention And Removal Plan | Created Date: 11/05/2021 | |
File: 1226-010 Rev.C - Site Section A-A Existing and Proposed.pdf (0 kb) | Description: NMA2 Site Section A A Existing And Proposed | Created Date: 11/05/2021 | |
File: 1226-011 Rev.C - Site Section B-B Existing and Proposed.pdf (0 kb) | Description: NMA2 Site Section B B Existing And Proposed | Created Date: 11/05/2021 | |
File: 1226-012 Rev.C - Site Section C-C Existing and Proposed.pdf (0 kb) | Description: NMA2 Site Section C C Existing And Proposed | Created Date: 11/05/2021 | |
File: 1226-013 Rev.C - Site Section D-D Existing and Proposed.pdf (0 kb) | Description: NMA2 Site Section D D Existing And Proposed | Created Date: 11/05/2021 | |
File: 1226-014 Rev.B - Site Section E-E Existing and Proposed.pdf (0 kb) | Description: NMA2 Site Section E E Existing And Proposed | Created Date: 11/05/2021 | |
File: 1226-015 Rev.B - Site Section F-F Existing and Proposed.pdf (0 kb) | Description: NMA2 Site Section F F Existing And Proposed | Created Date: 11/05/2021 | |
File: 1226-016 Rev.B - Site Section G-G Existing and Proposed.pdf (0 kb) | Description: NMA2 Site Section G G Existing And Proposed | Created Date: 11/05/2021 | |
File: 1226-201 Rev.E - Planting Plan 1 of 2.pdf (0 kb) | Description: NMA2 Planting Plan 1 Of 2 | Created Date: 11/05/2021 | |
File: 1226-202 Rev.E - Planting Plan 2 of 2.pdf (0 kb) | Description: NMA2 Planting Plan 2 Of 2 | Created Date: 11/05/2021 | |
File: 2018-22 A-140 Rev.G - East Showroom Complex - Plans.pdf (0 kb) | Description: NMA2 East Showroom Complex Plans | Created Date: 11/05/2021 | |
File: 2018-22 A-220 Rev.H - East Showroom Complex - Elevations.pdf (0 kb) | Description: NMA2 East Showroom Complex Elevations | Created Date: 11/05/2021 | |
File: 2018-22 A-310 Rev.B - East Showroom and Workshop Complex - Sections.pdf (0 kb) | Description: NMA2 East Showroom And Workshop Complex Sections | Created Date: 11/05/2021 | |
File: 2018-22 B-150 Rev.F - Workshop A and B - Plans.pdf (0 kb) | Description: NMA2 Workshop A And B Plans | Created Date: 11/05/2021 | |
File: 2018-22 B-155 Rev.D - Workshop A and B and East Showrooms - Roof Plans.pdf (0 kb) | Description: NMA2 Workshop A And B And East Showrooms Roof Plans | Created Date: 11/05/2021 | |
File: 2018-22 B-230 Rev.G - East Showroom and Workshop Complex - Workshop A and B - Elevations.pdf (0 kb) | Description: NMA2 East Showroom And Workshop Complex Workshop A And B Elevations | Created Date: 11/05/2021 | |
File: 2018-22 C-160 Rev.G - Workshop C and West Showroom - Ground Floor Plan.pdf (0 kb) | Description: NMA2 Workshop C And West Showroom Ground Floor Plan | Created Date: 11/05/2021 | |
File: 2018-22 C-165 Rev.G - Workshop C and West Showroom - Ground Floor Mezzanine Plan.pdf (0 kb) | Description: NMA2 Workshop C And West Showroom Ground Floor Mezzanine Plan | Created Date: 11/05/2021 | |
File: 2018-22 C-170 Rev.G - Workshop C and West Showroom - First Floor Plan - Upper Showroom and Secure Car Storage.pdf (0 kb) | Description: NMA2 Workshop C And West Showroom First Floor Plan Upper Showroom And Secure Car Storage | Created Date: 11/05/2021 | |
File: 2018-22 C-180 Rev.G - Workshop C and West Showroom - Second Floor Plan - Secure Car Storage and Display.pdf (0 kb) | Description: NMA2 Workshop C And West Showroom Second Floor Plan Secure Car Storage And Display | Created Date: 11/05/2021 | |
File: 2018-22 C-190 Rev.C - Workshop C and West Showroom - Third Floor Roof Plan - Rooftop Car Parking and Plant.pdf (0 kb) | Description: NMA2 Workshop C And West Showroom Third Floor Roof Plan Rooftop Car Parking And Plant | Created Date: 11/05/2021 | |
File: 2018-22 C-240 Rev.J - Workshop C and Showroom - Elevations.pdf (0 kb) | Description: NMA2 Workshop C And Showroom Elevations | Created Date: 11/05/2021 | |
File: 2018-22 C-330 Rev.F - Workshop C and West Showroom - Sections.pdf (0 kb) | Description: NMA2 Workshop C And West Showroom Sections | Created Date: 11/05/2021 | |
File: 2018-22 D-195 Rev.F - Valet Building and Outbuildings - Plans and Elevations.pdf (0 kb) | Description: NMA2 Valet Building And Outbuildings Plans And Elevations | Created Date: 11/05/2021 | |
File: 2018-22 S-001 Rev.D - Location and Block Plan.pdf (0 kb) | Description: NMA2 Location And Block Plan | Created Date: 11/05/2021 | |
File: 2018-22 S-100 Rev.J - Ground Floor Site Plan.pdf (0 kb) | Description: NMA2 Ground Floor Site Plan | Created Date: 11/05/2021 | |
File: 12690_SK100 Rev.E - Proposed Vehicle Tracking.pdf (0 kb) | Description: NMA2 Proposed Vehicle Tracking | Created Date: 11/05/2021 | |
File: P21001-BMP-ZZ-ZZ-DR-C-0104 Rev.C05 - Proposed Drainage and Levels Plan.pdf (0 kb) | Description: NMA2 Proposed Levels & Drainage Plan | Created Date: 11/05/2021 | |
Floor Plans | |||
File: 2018-22 S-100 Rev.F - Ground Floor Site Plan.pdf (0 kb) | Description: Ground Floor Site Plan | Created Date: 08/10/2019 | |
Landscape Plans | |||
File: 1226-003 - Vegetation Retention and Removal Plan.pdf (0 kb) | Description: Vegetation Retention & Removal Plan | Created Date: 12/06/2019 | |
File: 1226-402 - Tree Protective Fencing Detail.pdf (0 kb) | Description: Tree Protective Fencing Detail | Created Date: 12/06/2019 | |
File: 1226-401 - Typical Detail - Tree in Soft.pdf (0 kb) | Description: Typical Detail - Tree In Soft | Created Date: 12/06/2019 | |
File: 1226-001 Rev.B - Landscape General Arrangement Plan.pdf (0 kb) | Description: Landscape General Arrangement Plan | Created Date: 10/10/2019 | |
File: 1226-010 Rev.B - Site Section A-A - Existing and Proposed Condition.pdf (0 kb) | Description: Existing & Proposed Site Section A-A | Created Date: 10/10/2019 | |
File: 1226-011 Rev.B - Site Section B-B - Existing and Proposed Condition.pdf (0 kb) | Description: Existing & Proposed Site Section B-B | Created Date: 10/10/2019 | |
File: 1226-012 Rev. B - Site Section C-C - Existing and Proposed Condition.pdf (0 kb) | Description: Existing & Proposed Site Section C-C | Created Date: 10/10/2019 | |
File: 1226-013 Rev.B - Site Section D-D - Existing and Proposed Condition.pdf (0 kb) | Description: Existing & Proposed Site Section D-D | Created Date: 10/10/2019 | |
File: 1226-014 Rev.A - Site Section E-E - Existing and Proposed Condition.pdf (0 kb) | Description: Existing & Proposed Site Section E-E | Created Date: 10/10/2019 | |
File: 1226-015 Rev.A - Site Section F-F - Existing and Proposed Condition.pdf (0 kb) | Description: Existing & Proposed Site Section F-F | Created Date: 08/10/2019 | |
File: 1226-016 Rev.A - Site Section G-G - Existing and Proposed Condition.pdf (0 kb) | Description: Existing & Proposed Site Section G-G | Created Date: 10/10/2019 | |
Location Plan | |||
File: 1226-201 Rev.A - Planting Plan 1 of 2.pdf (0 kb) | Description: Planting Plan 1 of 2 | Created Date: 08/10/2019 | |
File: 1226-202 Rev.A - Planting Plan 2 of 2.pdf (0 kb) | Description: Planting Plan 2 of 2 | Created Date: 10/10/2019 | |
Plans | |||
File: hbp1.pdf (0 kb) | Description: Rooftop car parking visibility | Created Date: 13/07/2020 | |
File: 12690_104 - Proposed Levels and Drainage Plan.pdf (0 kb) | Description: Proposed Drainage & Levels Plan | Created Date: 12/06/2019 | |
File: 2018-22 S-080 Rev.B - Existing Site Survey.pdf (0 kb) | Description: Existing Site Plan Survey | Created Date: 12/06/2019 | |
File: 2018-22 A-310 Rev.A - East Showroom and Workshop Complex - Sections.pdf (0 kb) | Description: East Showroom & Workshop - Sections | Created Date: 10/10/2019 | |
File: 2018-22 B-150 Rev.D - Workshop A and B - Plans.pdf (0 kb) | Description: East Showroom - Ground & First Floor Plan | Created Date: 10/10/2019 | |
File: 2018-22 B-230 Rev.E - East Showroom and Workshop Complex - Workshop A and B - Elevations.pdf (0 kb) | Description: East Showroom & Workshop - Workshop A & B Elevations | Created Date: 08/10/2019 | |
File: 2018-22 S-100 Rev.F - Ground Floor Site Plan.pdf (0 kb) | Description: Workshop C & West Showroom - Ground Floor Plan | Created Date: 10/10/2019 | |
File: 2018-22 C-165 Rev.E - Workshop C and West Showroom - Ground Floor Mezzanine Plan.pdf (0 kb) | Description: Workshop C & West Showroom - Ground Floor Mezzanine Plan | Created Date: 08/10/2019 | |
File: 2018-22 C-240 Rev.F - Workshop C and Showroom - Elevations.pdf (0 kb) | Description: Workshop C & Showroom - Elevations | Created Date: 10/10/2019 | |
File: 2018-22 C-330 Rev.D - Workshop C and West Showroom - Sections.pdf (0 kb) | Description: Workshop C & West Showroom - Sections | Created Date: 10/10/2019 | |
File: 2018-22 D-195 Rev.D - Valet Building and Outbuildings - Plans and Elevations.pdf (0 kb) | Description: Valet Building & Outbuildings - Plans & levations | Created Date: 10/10/2019 | |
File: 2018-22 S-001 Rev.C - Location and Block Plan.pdf (0 kb) | Description: Location & Block Plan | Created Date: 10/10/2019 | |
File: 2018-22 A-220 Rev.F - East Showroom Complex - Elevations.jpg (0 kb) | Description: East Showroom - Elevations | Created Date: 08/10/2019 | |
File: 2018-22 C-170 Rev.E - Workshop C and West Showroom - First Floor Plan - Upper Showroom and Secure Car Storage.pdf (0 kb) | Description: Workshop C & West Showroom - First Floor Plan | Created Date: 10/10/2019 | |
File: 2018-22 C-180 Rev.E - Workshop C and West Showroom - Second Floor Plan - Secure Car Storage and Display.pdf (0 kb) | Description: Workshop C & West Showroom - Second Floor Plan | Created Date: 08/10/2019 | |
File: 12690 SK100 Rev.C - Proposed Vehicle Tracking.pdf (0 kb) | Description: Proposed Vehicle Tracking Plan | Created Date: 08/10/2019 | |
File: hbp.pdf (0 kb) | Description: Workshop C & West Showroom - Third Floor Roof Plan | Created Date: 13/07/2020 | |
File: 2018-22 B-155 Rev.C - Workshop A and B and East Showrooms - Roof Plans.pdf (0 kb) | Description: Workshop A & B And East Showroom Roof Plans | Created Date: 15/07/2020 | |
File: 2018-22 C-170 Rev.G - Workshop C and West Showroom - First Floor Plan - Upper Showroom and Secure Car Storage.pdf (0 kb) | Description: NMA Workshop C and West Showroom - First Floor Plan - Upper Showroom and Secure Car Storage | Created Date: 31/12/2020 | |
File: 2018-22 C-180 Rev.G - Workshop C and West Showroom - Second Floor Plan - Secure Car Storage and Display.pdf (0 kb) | Description: NMA Workshop C and West Showroom - Second Floor Plan - Secure Car Storage and Display | Created Date: 31/12/2020 | |
File: 2018-22 C-190 Rev.C - Workshop C and West Showroom - Third Floor Roof Plan - Rooftop Car Parking and Plant.pdf (0 kb) | Description: NMA Workshop C and West Showroom - Third Floor Roof Plan - Rooftop Car Parking and Plant | Created Date: 31/12/2020 | |
File: 2018-22 C-240 Rev.H - Workshop C and Showroom - Elevations.pdf (0 kb) | Description: NMA Workshop C and Showroom Elevations | Created Date: 31/12/2020 | |
File: 2018-22 C-330 Rev.F - Workshop C and West Showroom - Sections.pdf (0 kb) | Description: NMA Workshop C and West Showroom Sections | Created Date: 31/12/2020 | |
File: 2018-22 D-195 Rev.F - Valet Building and Outbuildings - Plans and Elevations.pdf (0 kb) | Description: NMA Valet Building and Outbuildings - Plans and Elevations | Created Date: 31/12/2020 | |
File: 2018-22 S-001 Rev.D - Location and Block Plan.pdf (0 kb) | Description: NMA Location and Block Plan | Created Date: 31/12/2020 | |
File: 2018-22 S-100 Rev.H - Ground Floor Site Plan.pdf (0 kb) | Description: NMA Ground Floor Site Plan | Created Date: 31/12/2020 | |
File: 12690_104 Rev.F - Proposed Drainage and Levels Plan.pdf (0 kb) | Description: NMA Proposed Drainage and Levels Plan | Created Date: 31/12/2020 | |
File: 12690_SK100 Rev.D - Proposed Vehicle Tracking.pdf (0 kb) | Description: NMA Proposed Vehicle Tracking Plan | Created Date: 31/12/2020 | |
File: 1226-001 Rev.D - Landscape General Arrangement Plan.pdf (0 kb) | Description: NMA Landscape General Arrangement Plan | Created Date: 31/12/2020 | |
File: 1226-003 Rev.B - Vegetation Retention and Removal Plan.pdf (0 kb) | Description: NMA Vegetation Retention and Removal Plan | Created Date: 31/12/2020 | |
File: 1226-010 Rev.C - Site Section A-A Existing and Proposed.pdf (0 kb) | Description: NMA Site Section A-A - Existing and Proposed Condition | Created Date: 31/12/2020 | |
File: 1226-011 Rev.C - Site Section B-B Existing and Proposed.pdf (0 kb) | Description: NMA Site Section B-B - Existing and Proposed Condition | Created Date: 31/12/2020 | |
File: 1226-012 Rev.C - Site Section C-C Existing and Proposed.pdf (0 kb) | Description: NMA Site Section C-C - Existing and Proposed Condition | Created Date: 31/12/2020 | |
File: 1226-013 Rev.C - Site Section D-D Existing and Proposed.pdf (0 kb) | Description: NMA Site Section D-D - Existing and Proposed Condition | Created Date: 31/12/2020 | |
File: 1226-014 Rev.B - Site Section E-E Existing and Proposed.pdf (0 kb) | Description: NMA Site Section E-E - Existing and Proposed Condition | Created Date: 31/12/2020 | |
File: 1226-015 Rev.B - Site Section F-F Existing and Proposed.pdf (0 kb) | Description: NMA Site Section F-F - Existing and Proposed Condition | Created Date: 31/12/2020 | |
File: 1226-016 Rev.B - Site Section G-G Existing and Proposed.pdf (0 kb) | Description: NMA Site Section G-G - Existing and Proposed Condition | Created Date: 31/12/2020 | |
File: 1226-201 Rev.D - Planting Plan 1 of 2.pdf (0 kb) | Description: NMA Planting Plan 1 of 2 | Created Date: 31/12/2020 | |
File: 1226-202 Rev.D - Planting Plan 2 of 2.pdf (0 kb) | Description: NMA Planting Plan 1 of 2 | Created Date: 31/12/2020 | |
File: 2018-22 A-140 Rev.G - East Showroom Complex - Plans.pdf (0 kb) | Description: NMA East Showroom Complex Plans | Created Date: 31/12/2020 | |
File: 2018-22 A-220 Rev.H - East Showroom Complex - Elevations.pdf (0 kb) | Description: NMA East Showroom Complex Elevations | Created Date: 31/12/2020 | |
File: 2018-22 A-310 Rev.B - East Showroom and Workshop Complex - Sections.pdf (0 kb) | Description: NMA East Showroom and Workshop Complex Sections | Created Date: 31/12/2020 | |
File: 2018-22 B-150 Rev.F - Workshop A and B - Plans.pdf (0 kb) | Description: NMA Workshop A and B Plans | Created Date: 31/12/2020 | |
File: 2018-22 B-155 Rev.D - Workshop A and B and East Showrooms - Roof Plans.pdf (0 kb) | Description: NMA Workshop A and B and East Showrooms Roof Plans | Created Date: 31/12/2020 | |
File: 2018-22 B-230 Rev.G - East Showroom and Workshop Complex - Workshop A and B - Elevations.pdf (0 kb) | Description: NMA East Showroom and Workshop Complex - Workshop A and B - Elevations | Created Date: 31/12/2020 | |
File: 2018-22 C-160 Rev.G - Workshop C and West Showroom - Ground Floor Plan.pdf (0 kb) | Description: NMA Workshop C and West Showroom Ground Floor Plan | Created Date: 31/12/2020 | |
File: 2018-22 C-165 Rev.G - Workshop C and West Showroom - Ground Floor Mezzanine Plan.pdf (0 kb) | Description: NMA Workshop C and West Showroom Ground Floor Mezzanine Plan | Created Date: 31/12/2020 | |
Design & Access Statement | |||
File: Design and Access Statement.pdf (0 kb) | Description: Design And Access Statement | Created Date: 12/06/2019 | |
File: Design and Access Statement - Landscape Section_Redacted.pdf (0 kb) | Description: Design And Access Statement Landscape Proposals -Redacted | Created Date: 27/06/2019 | |
Planning Statement | |||
File: Planning Statement.pdf (0 kb) | Description: Planning Statement | Created Date: 12/06/2019 | |
Transport Statement | |||
File: Transport Statement and Travel Plan.pdf (0 kb) | Description: Transport Statement And Travel Plan | Created Date: 12/06/2019 | |
Consultee Response | |||
File: Comments.pdf (0 kb) | Description: Comment - Client Services | Created Date: 04/07/2019 | |
File: Email-6 2019 1411 MAJ - Plot 5100 Mosquito Way Hatfield Business Park Hatfield AL10 9WN .pdf (0 kb) | Description: Comment - HCC Growth Team | Created Date: 04/07/2019 | |
File: Comments(1).pdf (0 kb) | Description: Comment - Parking Services | Created Date: 08/07/2019 | |
File: Plot 5100 Mosquito Way Hatfield Business Park Hatfield 6-2019-1411-MAJ biodiversity off setting_ap.pdf (0 kb) | Description: Comment - Hertfordshire Ecology | Created Date: 11/07/2019 | |
File: Comments(2).pdf (0 kb) | Description: Comment - Hertfordshire Constabulary | Created Date: 15/07/2019 | |
File: 620191411MAJ - LLFA 18.07.19.pdf (0 kb) | Description: Objection - Lead Local Flood Authority | Created Date: 18/07/2019 | |
File: Plots 5100 Hatfield Business Park July 2019.pdf (0 kb) | Description: Comment - Public Health & Protection | Created Date: 19/07/2019 | |
File: Comments(3).pdf (0 kb) | Description: Objection - Hatfield Town Council | Created Date: 22/07/2019 | |
File: 620191411MAJ 230719.pdf (0 kb) | Description: Objection - Affinity Water - Attachment | Created Date: 25/07/2019 | |
File: Email-Consultation response 6 2019 1411 MAJ .pdf (0 kb) | Description: Objection - Affinity Water | Created Date: 25/07/2019 | |
File: Email-Planning application 6 2019 1411 MAJ - Plot 5100 Mosquito Way.pdf (0 kb) | Description: Comment - Herts Transp Programmes & Strategy | Created Date: 25/07/2019 | |
File: 6-19-1411-1.pdf (0 kb) | Description: Comment - Historic Environment Advisor | Created Date: 01/08/2019 | |
File: 130437.pdf (0 kb) | Description: Conditional Response - Environment Agency | Created Date: 02/08/2019 | |
File: 6-19-1411-5.pdf (0 kb) | Description: Comment - Historic Environment Advisor | Created Date: 15/08/2019 | |
File: RE_ Application 6_2019_1411_MAJ.pdf (0 kb) | Description: Comment - WHBC Landscapes Dept | Created Date: 03/09/2019 | |
File: 620191411MAJ_HERef_P01104510_L351771.pdf (0 kb) | Description: Comment - Historic England | Created Date: 05/09/2019 | |
File: 6_2019_1411_MAJ Plot 5100, Mosquito Way, Hatfield Business Park 24.09.19.pdf (0 kb) | Description: Comment - Place Services, Essex CC | Created Date: 24/09/2019 | |
File: 3rd Party Planning Application - 6_2019_1411_MAJ.pdf (0 kb) | Description: Conditional - Thames Water | Created Date: 26/09/2019 | |
File: 6-19-1411-7.pdf (0 kb) | Description: Comment - Historic Environment Advisor | Created Date: 14/10/2019 | |
File: Comments(4).pdf (0 kb) | Description: Comment - Public Health and Protection | Created Date: 17/10/2019 | |
File: 620191411MAJ - LLFA 01.11.19.pdf (0 kb) | Description: Objection - LLFA | Created Date: 01/11/2019 | |
File: 3rd Party Planning Application - 6_2019_1411_MAJ - Amended Response(1).pdf (0 kb) | Description: Comment - Thames Water | Created Date: 29/01/2020 | |
File: 620191411MAJ - LLFA 26.02.2020.pdf (0 kb) | Description: Conditional - Lead Local Flood Authority | Created Date: 26/02/2020 | |
File: 130437-02.pdf (0 kb) | Description: Updated comments - Environment Agency | Created Date: 19/06/2020 | |
Legal Agreement | |||
File: Hatfield - Unilateral Undertaking to HCC - 11.08.20_THL_143667979_1_Redacted.pdf (0 kb) | Description: (HCC) Unilateral Undertaking 11 August 2020 | Created Date: 25/08/2020 | |
File: Supplemental Deed 4 September 2020_Redacted.pdf (0 kb) | Description: Supplemental Deed dated 4 September 2020 redacted | Created Date: 04/09/2020 | |
Officer Report | |||
File: Delegated Report_620191411MAJ(1).pdf (0 kb) | Description: Delegated Report | Created Date: 04/09/2020 | |
Correspondence | |||
File: Planning application at Plot 5100 Hatfield Business Park. 620191411MAJ.pdf (0 kb) | Description: Affinity Water objection removed | Created Date: 13/05/2020 | |
Decision Notice | |||
File: Decision Notice_620191411MAJ.pdf (0 kb) | Description: Decision Notice | Created Date: 04/09/2020 | |
Documents | |||
File: Arlington Response Letter to Affinity Water - 6_2019_1411_MAJ - 05.09.19_Redacted.pdf (0 kb) | Description: Arlington Response Letter to Affinity Water - redacted | Created Date: 26/03/2020 | |
Flood Impact Assessment | |||
File: Flood Risk Assessment and Drainage Strategy.pdf (0 kb) | Description: Flood Risk Assessment And Drainage Strategy | Created Date: 12/06/2019 | |
File: Binder2_Redacted.pdf (0 kb) | Description: Flood Risk Assessment & Drainage Strategy – 4th Issue, September 2019 Redacted | Created Date: 11/10/2019 | |
File: SUDS Maintenance Plan.doc.pdf (0 kb) | Description: SuDS Maintenance Plan - First Issue: August 2019 | Created Date: 10/02/2020 | |
Land Contamination Assessment | |||
File: Land Quality Assessment.pdf (0 kb) | Description: Land Quality Assessment | Created Date: 12/06/2019 | |
File: Contamination & Land Quality Assessment – Second Issue – 19 September 2019_Redacted.pdf (0 kb) | Description: Contamination & Land Quality Assessment – Second Issue – 19 September 2019 Redacted | Created Date: 11/10/2019 | |
Lighting Assessment | |||
File: P5100-SPIE-XX-00-DR-E-6311_P01 - External Lighting Scheme.pdf (0 kb) | Description: External Lighting Scheme | Created Date: 12/06/2019 | |
Noise Impact Assessment | |||
File: Noise Survey Report_Redacted.pdf (0 kb) | Description: Noise Survey Report-Redacted | Created Date: 27/06/2019 | |
Report | |||
File: Ecological Assessment.pdf (0 kb) | Description: Ecological Assessment | Created Date: 12/06/2019 | |
File: Archaeological Written Scheme of Investigation.pdf (0 kb) | Description: Archaeological Written Scheme Of Investigation Rev A | Created Date: 12/06/2019 | |
File: Archaeological Written Scheme of Investigation - Rev.B.pdf (0 kb) | Description: Archaeological Written Scheme of Investigation Rev B | Created Date: 21/08/2019 | |
Site Notice | |||
File: Site Notice_620191411MAJ(1).pdf (0 kb) | Description: Site Notice | Created Date: 17/07/2019 | |
File: Site Notice_620191411MAJ(2).pdf (0 kb) | Description: Site Notice | Created Date: 19/07/2019 | |
Superseded Plans | |||
File: 2018-22 S-100 Rev.E - Ground Floor Site Plan.pdf (0 kb) | Description: Ground Floor Site Plan | Created Date: 12/06/2019 | |
File: 2018-22 A-140 Rev.E - East Showroom Complex - Plans.pdf (0 kb) | Description: East Showroom Complex Plans | Created Date: 12/06/2019 | |
File: 2018-22 B-150 Rev.C - Workshop A and B - Plans.pdf (0 kb) | Description: Workshop A And B Plans | Created Date: 12/06/2019 | |
File: 2018-22 B-155 Rev.B - Workshop A and B and East Showrooms - Roof Plans.pdf (0 kb) | Description: Workshop A And B And East Showrooms Roof Plans | Created Date: 12/06/2019 | |
File: 2018-22 C-160 Rev.D - Workshop C and West Showroom - Ground Floor Plan.pdf (0 kb) | Description: Workshop C And West Showroom Ground Floor Plan | Created Date: 12/06/2019 | |
File: 2018-22 C-165 Rev.D - Workshop C and West Showroom - Ground Floor Mezzanine Plan.pdf (0 kb) | Description: Workshop C And West Showroom Ground Floor Mezzanine Plan | Created Date: 12/06/2019 | |
File: 2018-22 D-195 Rev.C - Valet Building and Outbuildings - Plans and Elevations.pdf (0 kb) | Description: Valet Building And Outbuildings Plans And Elevations | Created Date: 12/06/2019 | |
File: 2018-22 A-220 Rev.E - East Showroom Complex - Elevations.pdf (0 kb) | Description: East Showroom Complex Elevations | Created Date: 12/06/2019 | |
File: 2018-22 B-230 Rev.D - East Showroom and Workshop Complex - Workshop A and B - Elevations.pdf (0 kb) | Description: East Showroom And Workshop Complex Workshop A And B Elevations | Created Date: 12/06/2019 | |
File: 2018-22 B-230 Rev.E - East Showroom and Workshop Complex - Workshop A and B - Elevations.pdf (0 kb) | Description: Workshop C And Showroom Elevations | Created Date: 10/10/2019 | |
File: 2018-22 A-310 - East Showroom and Workshop Complex - Sections.pdf (0 kb) | Description: East Showroom And Workshop Complex Sections | Created Date: 12/06/2019 | |
File: 2018-22 C-165 Rev.E - Workshop C and West Showroom - Ground Floor Mezzanine Plan.pdf (0 kb) | Description: Workshop C And West Showroom Sections | Created Date: 10/10/2019 | |
File: 2018-22 S-001 Rev.A - Location and Block Plan.pdf (0 kb) | Description: 2018 22 S 001 Rev.a Location And Block Plan | Created Date: 12/06/2019 | |
File: 1226-011 - Site Section B-B - Existing and Proposed Condition.pdf (0 kb) | Description: Site Section B B Existing And Proposed Condition | Created Date: 12/06/2019 | |
File: 1226-013 - Site Section D-D - Existing and Proposed Condition.pdf (0 kb) | Description: Site Section D D Existing And Proposed Condition | Created Date: 12/06/2019 | |
File: 1226-015 - Site Section F-F - Existing and Proposed Condition.pdf (0 kb) | Description: Site Section F F Existing And Proposed Condition | Created Date: 12/06/2019 | |
File: 1226-001 - Landscape General Arrangement Plan.pdf (0 kb) | Description: Landscape General Arrangement Plan | Created Date: 12/06/2019 | |
File: 1226-010 - Site Section A-A - Existing and Proposed Condition.pdf (0 kb) | Description: Site Section A A Existing And Proposed Condition | Created Date: 12/06/2019 | |
File: 1226-012 - Site Section C-C - Existing and Proposed Condition.pdf (0 kb) | Description: Site Section C C Existing And Proposed Condition | Created Date: 12/06/2019 | |
File: 1226-014 - Site Section E-E - Existing and Proposed Condition.pdf (0 kb) | Description: Site Section E E Existing And Proposed Condition | Created Date: 12/06/2019 | |
File: 1226-016 - Site Section G-G - Existing and Proposed Condition.pdf (0 kb) | Description: Site Section G G Existing And Proposed Condition | Created Date: 12/06/2019 | |
File: 2018-22 S-001 Rev.B - Location and Block Plan.pdf (0 kb) | Description: Location And Block Plan | Created Date: 27/06/2019 | |
File: 1226-201 - Planting Plan 1 of 2.pdf (0 kb) | Description: Planting Plan 1 of 2 | Created Date: 25/07/2019 | |
File: 1226-201 Rev.A - Planting Plan 1 of 2.pdf (0 kb) | Description: Planting Plan 2 of 2 | Created Date: 10/10/2019 | |
File: 2018-22 A-220 Rev.F - East Showroom Complex - Elevations.jpg (0 kb) | Description: Workshop A & B And East Roof Plans | Created Date: 10/10/2019 | |
File: 2018-22 C-190 Rev.B - Workshop C and West Showroom - Third Floor Roof Plan - Rooftop Car Parking and Plant.pdf (0 kb) | Description: Workshop C & West Showroom - Third Floor Roof Plan | Created Date: 08/10/2019 | |
Supporting Information | |||
File: Geotechnical and Geoenvironmental Site Investigation - Part 2.pdf (0 kb) | Description: Geotechnical And Geoenvironmental Site Investigation Part 2 | Created Date: 12/06/2019 | |
File: Geotechnical and Geoenvironmental Site Investigation - Part 3.pdf (0 kb) | Description: Geotechnical And Geoenvironmental Site Investigation Part 3 | Created Date: 12/06/2019 | |
File: Geotechnical and Geoenvironmental Site Investigation - Part 4.pdf (0 kb) | Description: Geotechnical And Geoenvironmental Site Investigation Part 4 | Created Date: 12/06/2019 | |
File: Geotechnical and Geoenvironmental Site Investigation - Part 5.pdf (0 kb) | Description: Geotechnical And Geoenvironmental Site Investigation Part 5 | Created Date: 12/06/2019 | |
File: Geotechnical and Geoenvironmental Site Investigation - Part 6.pdf (0 kb) | Description: Geotechnical And Geoenvironmental Site Investigation Part 6 | Created Date: 12/06/2019 | |
File: Geotechnical and Geoenvironmental Site Investigation - Part 1_Redacted.pdf (0 kb) | Description: Geotechnical And Geoenvironmental Site Investigation Part 1-Redacted | Created Date: 27/06/2019 | |
File: Geotechnical and Geoenvironmental Site Investigation - Part 7_Redacted.pdf (0 kb) | Description: Geotechnical And Geoenvironmental Site Investigation part 7-Redacted | Created Date: 27/06/2019 | |
File: 12767 LLFA Objection Response 10.02.2020.pdf (0 kb) | Description: LLFA objection response | Created Date: 10/02/2020 | |
File: 6763_102G_SCHEMATIC STORM DRAINAGE.PDF (0 kb) | Description: Schematic Storm Drainage Layout | Created Date: 10/02/2020 | |
Tree Survey | |||
File: Tree Survey Report.pdf (0 kb) | Description: Tree Survey Report | Created Date: 12/06/2019 |
Organisation | Name | Sent | Reply Due | Reply Received |
---|---|---|---|---|
Place Services | Conservation Officer | 03/09/2019 | 24/09/2019 | 24/09/2019 |
Place Services | Conservation Officer | 04/09/2020 | ||
Welwyn Hatfield Borough Council | Councillor Drew Richardson | 04/09/2020 | ||
Welwyn Hatfield Borough Council | Councillor Drew Richardson | 02/07/2019 | 23/07/2019 | |
Welwyn Hatfield Borough Council | Councillor Duncan Bell | 02/07/2019 | 23/07/2019 | |
Welwyn Hatfield Borough Council | Councillor Duncan Bell | 04/09/2020 | ||
Welwyn Hatfield Borough Council | Councillor Samuel Kasumu | 02/07/2019 | 23/07/2019 | |
Welwyn Hatfield Borough Council | Councillor Samuel Kasumu | 04/09/2020 | ||
Lead Local Flood Authority | Fiona Lai | 02/07/2019 | 23/07/2019 | 18/07/2019 |
Lead Local Flood Authority | Fiona Lai | 11/10/2019 | 21/10/2019 | 01/11/2019 |
Lead Local Flood Authority | Fiona Lai | 07/02/2020 | 17/02/2020 | 26/02/2020 |
Lead Local Flood Authority | Fiona Lai | 04/09/2020 | ||
Hertfordshire Constabulary | Gerry Brophy | 04/09/2020 | ||
Hertfordshire Constabulary | Gerry Brophy | 02/07/2019 | 23/07/2019 | 15/07/2019 |
Hertfordshire County Council | HCC Growth Team | 02/07/2019 | 23/07/2019 | 04/07/2019 |
Hertfordshire County Council | HCC Growth Team | 04/09/2020 | ||
Hertfordshire County Council | Hertfordshire Transport Programmes & Strategy | 02/07/2019 | 23/07/2019 | 25/07/2019 |
Hertfordshire County Council | Hertfordshire Transport Programmes & Strategy | 04/09/2020 | ||
Hertfordshire County Council | Historic Environment Advisor | 04/09/2020 | ||
Hertfordshire County Council | Historic Environment Advisor | 11/07/2019 | 01/08/2019 | 01/08/2019 |
Hertfordshire County Council | Historic Environment Advisor | 21/08/2019 | 31/08/2019 | 14/10/2019 |
Hatfield Town Council | Jonah Anthony | 02/07/2019 | 23/07/2019 | 22/07/2019 |
Hatfield Town Council | Jonah Anthony | 04/09/2020 | ||
Welwyn Hatfield Borough Council | Landscapes Department | 02/07/2019 | 23/07/2019 | 03/09/2019 |
Welwyn Hatfield Borough Council | Landscapes Department | 04/09/2020 | ||
WHBC - Client Services | Lorraine Davis | 04/09/2020 | ||
WHBC - Client Services | Lorraine Davis | 02/07/2019 | 23/07/2019 | 04/07/2019 |
Hertfordshire Ecology | Martin Hicks | 02/07/2019 | 23/07/2019 | 11/07/2019 |
Hertfordshire Ecology | Martin Hicks | 04/09/2020 | ||
Cadent Gas Limited | Mr S Carter | 04/09/2020 | ||
Cadent Gas Limited | Mr S Carter | 02/07/2019 | 23/07/2019 | |
Environment Agency | Natasha Smith | 02/07/2019 | 23/07/2019 | 02/08/2019 |
Environment Agency | Natasha Smith | 04/09/2020 | ||
Thames Water, Development Control | Nicky McHugh | 02/07/2019 | 23/07/2019 | 26/07/2019 |
Thames Water, Development Control | Nicky McHugh | 04/09/2020 | ||
Welwyn Hatfield Borough Council | Parking Services | 02/07/2019 | 23/07/2019 | 08/07/2019 |
Welwyn Hatfield Borough Council | Parking Services | 04/09/2020 | ||
Affinity Water Ltd | Planning Team | 04/09/2020 | ||
Affinity Water Ltd | Planning Team | 26/03/2020 | 05/04/2020 | |
Affinity Water Ltd | Planning Team | 02/07/2019 | 23/07/2019 | 25/07/2019 |
WHBC - Public Health and Protection | Public Health and Protection | 02/07/2019 | 23/07/2019 | 19/07/2019 |
WHBC - Public Health and Protection | Public Health and Protection | 11/10/2019 | 21/10/2019 | 17/10/2019 |
WHBC - Public Health and Protection | Public Health and Protection | 04/09/2020 | ||
Historic England | Tom Goodman | 04/09/2020 | ||
Historic England | Tom Goodman | 03/09/2019 | 24/09/2019 | 05/09/2019 |
Address | Date Sent | Expiry Date | Date Reconsulted | Reconsult Expiry Date |
---|---|---|---|---|
Unit 1 Hearle Way Hatfield AL10 9EW | 02/07/2019 | 23/07/2019 | ||
Unit 3 Hearle Way Hatfield AL10 9EW | 02/07/2019 | 23/07/2019 | ||
Unit 5 Hearle Way Hatfield AL10 9EW | 02/07/2019 | 23/07/2019 | ||
Unit 7 Hearle Way Hatfield AL10 9EW | 02/07/2019 | 23/07/2019 | ||
Unit 9 Hearle Way Hatfield AL10 9EW | 02/07/2019 | 23/07/2019 | ||
Unit 11 Hearle Way Hatfield AL10 9EW | 02/07/2019 | 23/07/2019 | ||
Unit 13 Hearle Way Hatfield AL10 9EW | 02/07/2019 | 23/07/2019 | ||
Unit 15 Hearle Way Hatfield AL10 9EW | 02/07/2019 | 23/07/2019 | ||
Unit 17 Hearle Way Hatfield AL10 9EW | 02/07/2019 | 23/07/2019 | ||
Unit 19 Hearle Way Hatfield AL10 9EW | 02/07/2019 | 23/07/2019 | ||
Unit 21 Hearle Way Hatfield AL10 9EW | 02/07/2019 | 23/07/2019 | ||
Unit 23 Hearle Way Hatfield AL10 9EW | 02/07/2019 | 23/07/2019 | ||
Unit 25 Hearle Way Hatfield AL10 9EW | 02/07/2019 | 23/07/2019 | ||
Unit 27 Hearle Way Hatfield AL10 9EW | 02/07/2019 | 23/07/2019 | ||
Unit 29 Hearle Way Hatfield AL10 9EW | 02/07/2019 | 23/07/2019 | ||
Unit 31 Hearle Way Hatfield AL10 9EW | 02/07/2019 | 23/07/2019 | ||
Unit 33 Hearle Way Hatfield AL10 9EW | 02/07/2019 | 23/07/2019 | ||
Unit 33 To 35 Hearle Way Hatfield AL10 9EW | 02/07/2019 | 23/07/2019 | ||
Unit 37 Hearle Way Hatfield AL10 9EW | 02/07/2019 | 23/07/2019 | ||
Unit 39 Hearle Way Hatfield AL10 9EW | 02/07/2019 | 23/07/2019 | ||
Unit 41 Hearle Way Hatfield AL10 9EW | 02/07/2019 | 23/07/2019 | ||
Unit 12 Hearle Way Hatfield AL10 9EW | 02/07/2019 | 23/07/2019 | ||
Unit 14 Hearle Way Hatfield AL10 9EW | 02/07/2019 | 23/07/2019 | ||
Unit 16 Hearle Way Hatfield AL10 9EW | 02/07/2019 | 23/07/2019 | ||
Unit 18 - 20 Hearle Way Hatfield AL10 9EW | 02/07/2019 | 23/07/2019 | ||
Unit 20 Hearle Way Hatfield AL10 9EW | 02/07/2019 | 23/07/2019 | ||
Unit 20 The I O Centre Hearle Way Hatfield AL10 9EW | 02/07/2019 | 23/07/2019 | ||
Unit 22 Hearle Way Hatfield AL10 9EW | 02/07/2019 | 23/07/2019 | ||
Unit 24 Hearle Way Hatfield AL10 9EW | 02/07/2019 | 23/07/2019 | ||
Unit 26 Hearle Way Hatfield AL10 9EW | 02/07/2019 | 23/07/2019 | ||
Unit 28 Hearle Way Hatfield AL10 9EW | 02/07/2019 | 23/07/2019 | ||
The Hub Tamblin Way Hatfield AL10 9EZ | 02/07/2019 | 23/07/2019 | ||
Howe Dell School The Runway Hatfield AL10 9AH | 02/07/2019 | 23/07/2019 | ||
Eisai Europe Limited European Knowledge Centre Mosquito Way Hatfield AL10 9SN | 02/07/2019 | 23/07/2019 | ||
Eisai Limited European Knowledge Centre Mosquito Way Hatfield AL10 9SN | 02/07/2019 | 23/07/2019 |
Application Number | Proposal | Decision | Distance |
---|---|---|---|
6/2025/0762/ADV | New Lotus signage to include: 1no. internally illuminated wall mounted box sign - externally mounted 1no. double sided glazing mounted vinyl sign - internally mounted 1no. internally illuminated wordmark sign - internally mounted | 0 | |
6/2023/0799/ADV | Installation of 4 internally illuminated aluminium totem signs within the hard/soft landscape area | Granted | 0 |
6/2022/2146/ADV | Installation of signage to facade of east and west buildings together with site wide totem wayfinding signage | Granted | 0 |
6/2022/2010/PN24 | Prior Approval for installation of 114kW solar PV system comprising of 300 x 380w Canadian Solar modules. | Prior Approval Required and Granted | 0 |
6/2022/1096/FULL | Installation of an external sprinkler tack in the back of house yard area, to support the fire strategy requirements of the development. | Granted | 0 |
6/2021/3271/FULL | Retention of two storage shelters | Granted | 0 |
6/2021/2415/COND | Submission of details pursuant to condition 3 (external materials) on planning permission 6/2019/1411/MAJ | Granted | 0 |
6/2021/1430/ADV | Installation of internally illuminated wall-mounted fascia signs | Granted | 0 |
6/2021/1449/VAR | Variation of condition 12 (soft landscaping) on planning permission 6/2019/1411/MAJ | Withdrawn | 0 |
6/2021/1317/VAR | Variation of condition 1 (time limited permission) on planning permission 6/2019/0563/FULL. | Granted | |
6/2021/0505/COND | Submission of details pursuant to conditions 1 (construction management plan), 2 (surface water drainage) and 7 (details of foundation design of approval) on planning permission 6/2019/1411/MAJ. | Granted | 0 |
6/2019/0563/FULL | Erection of temporary car showroom facility with associated vehicular parking and landscaping | Granted | |
S6/1999/1064/OP | DEMOLITION OF EXISTING (UNLISTED) BUILDINGS, REMOVAL OF RUNWAY AND OTHER HARD STANDING AREAS AND REDEVELOPMENT FOR THE FOLLOWING PURPOSES: AS A BUSINESS PARK COMPRISING USES WITHIN USE CLASS B1, B2, B8 AND SUI GENERIS USE; HOUSING; NEW UNIVERSITY CAMPUS (USE CLASS D1 AND D2) TO INCLUDE REPLACEMENT DE HAVILLAND SPORTS AND SOCIAL CLUB AND ASSOCIATED PLAYING FIELDS; TWO HOTELS; PRIMARY SCHOOL AND ASSOCIATED FACILITIES; DISTRICT CENTRE; WORKS OF CONVERSION TO ENABLE RECREATION USE OF EXISTING LISTED HANGAR; AVIATION HERITAGE CENTRE. TOGETHER WITH ASSOCIATED HIGHWAY, TRANSPORT AND SERVICE INFRASTRUCTURE (INCLUDING A STRATEGIC TRANSPORT CORRIDOR), LANDSCAPING AND OPEN SPACE, DIVERSION OF ELLENBROOK. MEANS OF ACCESS TO BE DETERMINED | Approval Subject to s106 | |
S6/1991/0274/FP | Siting of jack-leg portakabin to provide office accommodation | Granted | 0 |
Reference Number | Description | Validated Date | Expiry Date | Reason For Change | Officer | Decision | Decision Date |
---|---|---|---|---|---|---|---|
6/2019/1411/NMA | Non-material amendment for: - Shape of mezzanine floor to Showroom amended. Additional handover bay provided within Showroom B - Shopfront glazing and openings amended to Showroom B - Daylight panels to Workshop B amended - Lift over-run and roof plant area parapets increased in height - Spine wall between showrooms and customer mall / concourse altered to comprise both rainscreen and composite cladding - Canopy to side of Workshop A omitted - Position and design of central stair core altered - Plant room and external plant areas amended - High level window to staff canteen relocated West Building: - Service ‘Drop-Off’ area increased in length - Roof over service ‘Drop-Off’ area amended to suit updated layout - Location of daylight panels to workshop amended - Locations of Louvre panel openings amended - Open mesh cladding omitted and replaced with solid silver grey cladding - Plant room for mechanical ventilation added - Lift over-run height amended - Valet building rotated and re-positioned, and reduced in height - Waste Management compound relocated to new position adjacent to substation - Substation and switchgear housing rotated - Minor adjustment to position of West Building | 01/02/2021 | 01/03/2021 | The non-material amendments have been made to the development arising as a result of the detailed design process. | Mr David Elmore | Refused | 02/03/2021 |
6/2019/1411/NMA2 | Non-material amendment for -East Building:- - Shape of mezzanine floor to Showroom amended - Additional handover bay provided within Showroom B - Shopfront glazing and openings amended to Showroom B - Daylight panels to Workshop B amended - Lift over-run and roof plant area parapets increased in height - Spine wall between showrooms and customer mall / concourse altered to comprise both rainscreen and composite cladding - Canopy to side of Workshop A omitted - Position and design of central stair core altered - Plant room and external plant areas amended - High level window to staff canteen relocated West Building: - Service ‘Drop-Off’ area increased in length - Roof over service ‘Drop-Off’ area amended to suit updated layout - Location of daylight panels to workshop amended - Locations of Louvre panel openings amended - Open mesh cladding omitted and replaced with solid silver grey cladding - Plant room for mechanical ventilation added - Lift over-run height amended - Valet building rotated and re-positioned, and reduced in height - Waste Management compound relocated to new position adjacent to substation - Substation and switchgear housing rotated - Minor adjustment to position of West Building and front elevation facing Mosquito Way Site wide: - Reduction of 22 car parking spaces across the development. (This still falls within the range approved under the original outline planning permission for the Business Park). - Minor adjustment to the landscaping in the south-west corner of the site to accommodate the sub-station and service ducts. | 10/05/2021 | 07/06/2021 | Mr David Elmore | Granted | 31/08/2021 |