Return to search results   -   Start a new search   -   The consultation period for this application has now closed

Planning Application: 6/2019/1338/FULL




FULL PERMISSION
Decided - Granted
Mr Mark Peacock
m.peacock@welhat.gov.uk
University of Hertfordshire, Club de Havilland, Mosquito Way, Hatfield, AL10 9EU
Change of use from entertainment and leisure (Use Class D2) to teaching facility (Use Class D1)
520840
208273

  • Hatfield Villages

  • Councillor James Broach
  • Councillor Rose Grewal
  • Councillor Jane Otumunye
Hatfield
10014212152
04/06/2019
04/06/2019
Mr C Pattison
University of Hertfordshire
41-43 Maddox Street London W1S 2PD
C/O agent
Description Distance
Green Belt 25.77
Landscape Character Area 0.00
Parish 0.00
University of Hertfordshire 0.00
Article 4 HMO Direction 0.00
Cycle Paths 15.43
Flood Zone Surface Water 30mm 0.00
Flood Zone Surface Water 100mm 0.00
Flood Zone Surface Water 1000mm 0.00
Hatfield Aerodrome 0.00
Hertfordshire Ecological Network 0.00
Sand and Gravel Belt 0.00
Granted
20/08/2019
20/08/2019
Delegated

To download a selection of individual documents place a tick alongside each of the relevant rows and then click on Download selected files. To download all of the documents place a tick in the box alongside the header row and all of the files will be selected, then click on Download selected files. To view individual documents click on the File for the required row.

File Description Date Uploaded
Application Form - Without Personal Information
File: ApplicationFormNoPersonalData.pdf (152 kb) Description: Application Form - Redacted Created Date: 04/06/2019
File: ApplicationFormRedacted.pdf (100 kb) Description: Applicationformredacted Created Date: 10/06/2020
Block Plan
File: 19861-KSS-DH-Z0-DR-A-9003-S2-P1.pdf (1614 kb) Description: Existing Site Plan Created Date: 04/06/2019
File: 19861-KSS-DH-Z0-DR-A-9002-S2-P1.pdf (3943 kb) Description: Block Plan Created Date: 04/06/2019
File: 19861-KSS-DH-Z0-DR-A-9004-S2-P1.pdf (1445 kb) Description: Proposed Site Plan Created Date: 04/06/2019
Elevations
File: 19861-KSS-DH-ZZ-DR-A-9301-S2-P1.pdf (2200 kb) Description: Existing Elevations Created Date: 04/06/2019
File: 19861-KSS-DH-ZZ-DR-A-9302-S2-P1.pdf (2341 kb) Description: Proposed Elevations Created Date: 04/06/2019
File: UOHS-KSS-DH-ZZ-DR-A-1304-North Elevation.pdf (744 kb) Description: NMA Proposed North Elevation Created Date: 10/06/2020
File: UOHS-KSS-DH-ZZ-DR-A-1303-East Elevation.pdf (823 kb) Description: NMA Proposed East Elevation Created Date: 10/06/2020
Floor Plans
File: 19861-KSS-DH-00-DR-A-9101-S2-P1.pdf (260 kb) Description: Existing Ground Floor Plan Created Date: 04/06/2019
File: 19861-KSS-DH-01-DR-A-9101-S2-P1.pdf (307 kb) Description: Existing First Floor Plan Created Date: 04/06/2019
File: 19861-KSS-DH-02-DR-A-9101-S2-P1.pdf (131 kb) Description: Existing Roof Plan Created Date: 04/06/2019
File: 19861-KSS-DH-02-DR-A-9102-S2-P1.pdf (141 kb) Description: Proposed Roof Plan Created Date: 04/06/2019
File: 19861-KSS-DH-00-DR-A-9102-S2-P1.pdf (578 kb) Description: Proposed Ground Floor Plan Created Date: 04/06/2019
File: 19861-KSS-DH-01-DR-A-9102-S2-P1.pdf (557 kb) Description: Proposed First Floor Plan Created Date: 04/06/2019
Location Plan
File: 19861-KSS-DH-Z0-DR-A-9001-S2-P1.pdf (1526 kb) Description: Location plan Created Date: 04/06/2019
Site Sections
File: 19861-KSS-DH-ZZ-DR-A-9201-S2-P1.pdf (1676 kb) Description: Proposed Building Sections Created Date: 04/06/2019
File: 19861-KSS-DH-ZZ-DR-A-9202-S2-P1.pdf (2295 kb) Description: Proposed Building Sections Created Date: 04/06/2019
Design & Access Statement
File: UoH DAS Sports Science Building Final Version.pdf (5862 kb) Description: Design and Access Statement Created Date: 04/06/2019
Consultee Response
File: Email-RE 6 2019 1338 FULL University of Hertfordshire Club de Havilland Mosquito Way Hatfield AL.pdf (20 kb) Description: Comment - Hertfordshire County Council - S106 Obligations Created Date: 14/06/2019
File: Email-Planning application 6 2019 1338 FULL - De Havilland Campus University of Hertfordshire.pdf (12 kb) Description: Comment - Herts Transport Programmes & Stratergy Created Date: 20/06/2019
File: Comments.pdf (52 kb) Description: Comment - Parking Services Created Date: 23/06/2019
File: Comments(1).pdf (52 kb) Description: Comment - Client Services Created Date: 24/06/2019
File: NATIONAL_GRID_EA_GE4A_3NWP_018299_1_38084.pdf (966 kb) Description: Comment - Cadent Gas Created Date: 26/06/2019
File: Email-Our Ref EA_GE4A_3NWP_018299 Your Ref 6 2019 1338 FULL JC Site Address AL10 9EU University .pdf (19 kb) Description: Comment - Cadent Gas Created Date: 26/06/2019
File: Club de Havilland change of use.pdf (119 kb) Description: Comment - Public Health & Protection Created Date: 28/06/2019
File: Pages from htc.meetingMins310719.pdf (153 kb) Description: Support - Hatfield Town Council Created Date: 31/07/2019
Decision Notice PDF
File: Decision Letter - NMA_620191338FULL(1).pdf (74 kb) Description: NMA Decision Notice PDF Created Date: 14/07/2020
Officer Report PDF
File: Delegated Report_620191338FULL(3).pdf (33 kb) Description: Officer Report Created Date: 20/08/2019
Decision Notice
File: Decision Notice_620191338FULL.pdf (531 kb) Description: Decision Notice Created Date: 20/08/2019
Report
File: UOHS-MAL-XX-ZZ-RP-Y-9000_Environmental Noise Assessment_S3 Suitable for ....pdf (626 kb) Description: Environmental Noise Assessment Created Date: 04/06/2019
File: 19861-MAL-XX-ZZ-RP-Y-9003 - Early Stage ME Noise Breakout Risk Assessme....pdf (83 kb) Description: Early Strategic Risk Assessment of the M&E Rooftop Noise Breakout Created Date: 04/06/2019
Organisation Name Sent Reply Due Reply Received
Welwyn Hatfield Borough Council Councillor Drew Richardson 13/06/2019 04/07/2019
Welwyn Hatfield Borough Council Councillor Drew Richardson 20/08/2019
Welwyn Hatfield Borough Council Councillor Duncan Bell 13/06/2019 04/07/2019
Welwyn Hatfield Borough Council Councillor Duncan Bell 20/08/2019
Welwyn Hatfield Borough Council Councillor Samuel Kasumu 13/06/2019 04/07/2019
Welwyn Hatfield Borough Council Councillor Samuel Kasumu 20/08/2019
Hertfordshire County Council - S106 Obligations Denise Headland 14/06/2019
Hertfordshire County Council - S106 Obligations Denise Headland 20/08/2019
Hertfordshire County Council Hertfordshire Transport Programmes & Strategy 20/08/2019
Hertfordshire County Council Hertfordshire Transport Programmes & Strategy 13/06/2019 04/07/2019 20/06/2019
Hatfield Town Council Jonah Anthony 13/06/2019 04/07/2019 27/06/2019
Hatfield Town Council Jonah Anthony 20/08/2019
WHBC - Client Services Lorraine Davis 20/08/2019
WHBC - Client Services Lorraine Davis 24/06/2019
Cadent Gas Limited Mr S Carter 26/06/2019
Cadent Gas Limited Mr S Carter 20/08/2019
Welwyn Hatfield Borough Council Parking Services 20/08/2019
Welwyn Hatfield Borough Council Parking Services 23/06/2019
WHBC - Public Health and Protection Public Health and Protection 13/06/2019 04/07/2019 28/06/2019
WHBC - Public Health and Protection Public Health and Protection 20/08/2019

There are no neighbours associated with this application

Application Number Proposal Decision Distance
6/2024/1152/FULL Removal of mound Granted 0
6/2019/0849/COND Submission of details pursuant to condition 4 (Sustainable Drainage) on planning ref 6/2018/2150/MAJ Granted 0
S6/2012/2671/FP Erection of a single storey extension to existing sports village Granted 0
S6/2007/0121/FP ALTERATIONS TO MAIN ENTRANCE ROAD, INVOLVING NEW ROAD LAYOUT AND ALTERATIONS TO EXISTING PARKING PROVISION Granted 0
S6/2005/0872/FP Variation of Condition 2 Attached to Outline Planning Permission S6/1999/1064/OP to Allow an Additional 5 Years for Submission of Reserved Matters (Up to 29/12/2015) Granted 0
S6/2005/0740/FP ALTERATION TO GROUND FLOOR OF SPORTS CLUB WITH NEW ENTRANCE DOOR AND CANOPY AND ASSOCIATED FOOTPATH Granted 0
S6/2003/0106/FP VARIATION OF CONDITION 3 OF PLANNING PERMISSION S6/2001/1564/FP TO ALLOW FLOODLIGHTS TO BE USED MONDAY TO FRIDAY UNTIL 10.00pm AND SATURDAY, SUNDAY AND BANK HOLIDAYS UNTIL 8.00pm Refused 0
S6/2002/1731/FP NEW TEMPORARY PEDESTRIAN ENTRANCE Refused 0
S6/2001/1026/DE ERECTION OF 1600 STUDENT STUDY BEDROOMS AND ASSOCIATED SUPPORT FACILITIES, REFECTORY, SPORTS CENTRE INCLUDING POOL, SPORTS HALLS AND HEALTH CLUB AND LAYOUT OF PLAYING FIELDS. (RESERVED MATTERS APPLICATION PURSUANT TO OUTLINE PLANNING PERMISSION S6/1999/1064/OP AND S6/1999/1106/OP) Granted 0
S6/2000/1574/DE ERECTION OF TWO STOREY BUILDING COMPRISING SPORTS/FUNCTION HALL, BARS, ADMINISTRATION AND ANCILLARY ACCOMMODATION TO INCLUDE RESIDENTIAL ACCOMMODATION FOR RESIDENT MANAGER, TOGETHER WITH CONSTRUCTION OF BOWLING GREEN, SPORTS PITCH AND CAR PARKING WITH ACCESS FROM THE SPINE ROAD VIA COMET WAY Granted 0
S6/2000/1341/DE CONSTRUCTION OF SERVICES DIVERSION FOR ELECTRICITY, WATER SUPPLY AND STORM SEWERS, AND DIVERSION OF ELLENBROOK, INCLUDING CONSTRUCTION OF BALANCING PONDS Withdrawn 0
S6/1999/1064/OP DEMOLITION OF EXISTING (UNLISTED) BUILDINGS, REMOVAL OF RUNWAY AND OTHER HARD STANDING AREAS AND REDEVELOPMENT FOR THE FOLLOWING PURPOSES: AS A BUSINESS PARK COMPRISING USES WITHIN USE CLASS B1, B2, B8 AND SUI GENERIS USE; HOUSING; NEW UNIVERSITY CAMPUS (USE CLASS D1 AND D2) TO INCLUDE REPLACEMENT DE HAVILLAND SPORTS AND SOCIAL CLUB AND ASSOCIATED PLAYING FIELDS; TWO HOTELS; PRIMARY SCHOOL AND ASSOCIATED FACILITIES; DISTRICT CENTRE; WORKS OF CONVERSION TO ENABLE RECREATION USE OF EXISTING LISTED HANGAR; AVIATION HERITAGE CENTRE. TOGETHER WITH ASSOCIATED HIGHWAY, TRANSPORT AND SERVICE INFRASTRUCTURE (INCLUDING A STRATEGIC TRANSPORT CORRIDOR), LANDSCAPING AND OPEN SPACE, DIVERSION OF ELLENBROOK. MEANS OF ACCESS TO BE DETERMINED Approval Subject to s106 0
S6/1997/0847/FP Engineering works to permit the diversion of Ellenbrook Withdrawn 1
S6/1987/0176/OP Site for office complex with associated car parking, vehicular and pedestrian access and alterations to highways Granted 0
Reference Number Description Validated Date Expiry Date Reason For Change Officer Decision Decision Date
6/2019/1338/NMA Non material amendment for the installation of fascia panel along perimeter of roof on north and east elevations on planning permission 6/2019/1338/FULL 10/06/2020 08/07/2020 During the construction process several leak points were found around the perimeter of the existing roof. In order to resolve this our client has had to dress the new roof membrane into a new fascia panel which runs the perimeter of the roof along the north and east elevations. Mr Mark Peacock Granted 14/07/2020