Return to search results
-
Start a new search
- The consultation period for this application has now closed
Planning Application: 6/2019/0308/FULL
FULL PERMISSION
|
Decided - Granted
|
Ms Lucy Hale
|
l.hale@welhat.gov.uk
|
26 Pine Grove Brookmans Park Hatfield AL9 7BS
|
Erection of 1 x dwelling following demolition of existing dwelling
|
525870
|
204532
|
|
|
North Mymms
|
100080964198
|
11/02/2019
|
11/02/2019
|
|
13/03/2019
|
|
|
Mr I Kilich
|
Mr & Mrs D & H Yalkin
|
One York House Parkkgate Crescent
Hadley Wood
Barnet
EN4 0NW
|
26 Pine Grove
Brookmans Park
Hatfield
AL9 7BS
|
Description | Distance |
---|---|
Parish | 0.00 |
Flood Zone Surface Water 1000mm | 0.00 |
Hertfordshire Ecological Network | 0.00 |
Road Committee Informative | 0.00 |
Sand and Gravel Belt | 0.00 |
Granted
|
17/05/2019
|
17/05/2019
|
Delegated
|
|
To download a selection of individual documents place a tick alongside each of the relevant rows and then click on Download selected files. To download all of the documents place a tick in the box alongside the header row and all of the files will be selected, then click on Download selected files. To view individual documents click on the File for the required row.
File | Description | Date Uploaded | |
---|---|---|---|
Application Form - Without Personal Information | |||
File: ApplicationFormNoPersonalData.pdf (0 kb) | Description: Application Form - Redacted | Created Date: 11/02/2019 | |
Elevations | |||
File: 26PG-S2.pdf (0 kb) | Description: Topo Survey & Elevation In Context | Created Date: 11/02/2019 | |
File: 26PG-NH-05A.pdf (0 kb) | Description: Front Elevation As Proposed | Created Date: 25/04/2019 | |
File: 26PG-NH-06A.pdf (0 kb) | Description: Rear Elevation As Proposed | Created Date: 25/04/2019 | |
File: 26PG-NH-07A.pdf (0 kb) | Description: Side Elevation (South) As Proposed | Created Date: 25/04/2019 | |
File: 26PG-E03A.pdf (0 kb) | Description: Front Elevation - As Existing | Created Date: 25/04/2019 | |
File: 26PG-E04A.pdf (0 kb) | Description: Rear Elevations As Existing | Created Date: 25/04/2019 | |
File: 26PG-E05A.pdf (0 kb) | Description: Elevations & Section A-A As Existing | Created Date: 25/04/2019 | |
Floor Plans | |||
File: 26PG-NH-01A.pdf (0 kb) | Description: Ground Floor Plan As Proposed | Created Date: 25/04/2019 | |
File: 26PG-NH-02A.pdf (0 kb) | Description: First Floor Plan As Proposed | Created Date: 25/04/2019 | |
File: 26PG-NH-03A.pdf (0 kb) | Description: Loft Floor Plan As Proposed | Created Date: 25/04/2019 | |
File: 26PG-E01A.pdf (0 kb) | Description: Ground Floor Plan As Existing | Created Date: 25/04/2019 | |
File: 26PG-E02A.pdf (0 kb) | Description: Floor Plans As Existing | Created Date: 25/04/2019 | |
Location Plan | |||
File: 185.pdf (0 kb) | Description: Location Plan - redacted | Created Date: 11/02/2019 | |
Plans | |||
File: 26PG-NH-L1A.pdf (0 kb) | Description: Landscaping | Created Date: 28/02/2019 | |
File: 26PG-NH-00A.pdf (0 kb) | Description: Shedule Of Areas | Created Date: 25/04/2019 | |
Site Sections | |||
File: 26PG-NH-08A.pdf (0 kb) | Description: Side Elevation (North) As Proposed | Created Date: 25/04/2019 | |
File: 26PG-NH-09A.pdf (0 kb) | Description: Section B-B As Proposed | Created Date: 25/04/2019 | |
Design & Access Statement | |||
File: 26PG-NH-DAS.pdf (0 kb) | Description: Design and Access Statement | Created Date: 11/02/2019 | |
Consultee Response | |||
File: Comments.pdf (0 kb) | Description: Comment - WHBC - Client Services | Created Date: 25/02/2019 | |
File: Planning application 6_2019_0308_FULL - 26 Pine Grove.pdf (0 kb) | Description: Comment - Herts Transport Programmes & Strategy | Created Date: 27/02/2019 | |
File: Comments(1).pdf (0 kb) | Description: Objection - North Mymms Parish Council | Created Date: 04/03/2019 | |
File: 26 Pine Grove.pdf (0 kb) | Description: Comment - Public Health & Protection | Created Date: 13/03/2019 | |
File: 26 pine grove full.pdf (0 kb) | Description: Comment - Hertfordshire Ecology | Created Date: 28/03/2019 | |
Decision Notice PDF | |||
File: Decision Notice_620190308FULL.pdf (0 kb) | Description: Decision Notice PDF | Created Date: 17/05/2019 | |
Officer Report PDF | |||
File: Delegated Report_620190308FULL(4).pdf (0 kb) | Description: Officer Report | Created Date: 17/05/2019 | |
Amended Plans | |||
File: 26PG-NH-BP1A.pdf (0 kb) | Description: Topo Survey by 3D | Created Date: 28/02/2019 | |
File: 26PG-NH-BP3A.pdf (0 kb) | Description: Superimposed Footprints Existing & Proposed | Created Date: 28/02/2019 | |
File: 26PG-NH-BP2B.pdf (0 kb) | Description: Front Garden & Driveway As Proposed | Created Date: 25/04/2019 | |
Report | |||
File: NEW BUILD-18_1450_ReportX02_MF_DY.pdf (0 kb) | Description: Bat Survey Report | Created Date: 11/02/2019 | |
File: NEW BUILD-18_1450_ReportX02_MF_DY.pdf (0 kb) | Description: Bat Survey Report | Created Date: 11/02/2019 | |
Roof Plans | |||
File: 26PG-NH-04A.pdf (0 kb) | Description: Roof Plan As Proposed | Created Date: 25/04/2019 | |
File: 26PG-E06.pdf (0 kb) | Description: Existing Roof Plan | Created Date: 25/04/2019 | |
Superseded Plans | |||
File: 26PG-E01.pdf (0 kb) | Description: Ground Floor Plan As Existing | Created Date: 11/02/2019 | |
File: 26PG-E03.pdf (0 kb) | Description: Front Elevation - As Existing | Created Date: 11/02/2019 | |
File: 26PG-E02.pdf (0 kb) | Description: Floor Plans As Existing | Created Date: 11/02/2019 | |
File: 26PG-E05.pdf (0 kb) | Description: Elevations & Section A-A As Existing | Created Date: 11/02/2019 | |
File: 26PG-E04.pdf (0 kb) | Description: Rear Elevations As Existing | Created Date: 11/02/2019 | |
File: 26PG-NH-03.pdf (0 kb) | Description: Loft Floor Plan As Proposed | Created Date: 11/02/2019 | |
File: 26PG-NH-06.pdf (0 kb) | Description: Rear Elevation As Proposed | Created Date: 11/02/2019 | |
File: 26PG-NH-05.pdf (0 kb) | Description: Front Elevation As Proposed | Created Date: 11/02/2019 | |
File: 26PG-NH-08.pdf (0 kb) | Description: Side Elevation (North) As Proposed | Created Date: 11/02/2019 | |
File: 26PG-NH-09.pdf (0 kb) | Description: Section B-B As Proposed | Created Date: 11/02/2019 | |
File: 26PG-NH-01.pdf (0 kb) | Description: Ground Floor Plan As Proposed | Created Date: 11/02/2019 | |
File: 26PG-NH-02.pdf (0 kb) | Description: First Floor Plan As Proposed | Created Date: 11/02/2019 | |
File: 26PG-NH-04.pdf (0 kb) | Description: Roof Plan As Proposed | Created Date: 11/02/2019 | |
File: 26PG-NH-07.pdf (0 kb) | Description: Side Elevation (South) As Proposed | Created Date: 11/02/2019 | |
File: 26PG-NH-00.pdf (0 kb) | Description: Shedule Of Areas | Created Date: 11/02/2019 | |
File: 26PG-NH-BP1.pdf (0 kb) | Description: Topo Survey by 3D | Created Date: 11/02/2019 | |
File: 26PG-NH-BP2.pdf (0 kb) | Description: Front Garden & Driveway As Proposed | Created Date: 11/02/2019 | |
File: 26PG-NH-BP3.pdf (0 kb) | Description: Superimposed Footprints Existing & Proposed | Created Date: 11/02/2019 | |
File: 26PG-NH-BP2A.pdf (0 kb) | Description: Front Garden & Driveway As Proposed | Created Date: 28/02/2019 | |
Topographical | |||
File: 26PG-S1.pdf (0 kb) | Description: Topo Survey by 3D | Created Date: 11/02/2019 |
Organisation | Name | Sent | Reply Due | Reply Received |
---|---|---|---|---|
Welwyn Hatfield Borough Council | Councillor Jonathan Boulton | 20/02/2019 | 13/03/2019 | |
Welwyn Hatfield Borough Council | Councillor Jonathan Boulton | 17/05/2019 | ||
Welwyn Hatfield Borough Council | Councillor Rebecca Lass | 17/05/2019 | ||
Welwyn Hatfield Borough Council | Councillor Rebecca Lass | 20/02/2019 | 13/03/2019 | |
Welwyn Hatfield Borough Council | Councillor Stephen Boulton | 20/02/2019 | 13/03/2019 | |
Welwyn Hatfield Borough Council | Councillor Stephen Boulton | 17/05/2019 | ||
Hertfordshire County Council | Hertfordshire Transport Programmes & Strategy | 20/02/2019 | 13/03/2019 | 27/02/2019 |
Hertfordshire County Council | Hertfordshire Transport Programmes & Strategy | 17/05/2019 | ||
Welwyn Hatfield Borough Council | Landscapes Department | 17/05/2019 | ||
Welwyn Hatfield Borough Council | Landscapes Department | 20/02/2019 | 13/03/2019 | |
North Mymms Parish Council | Linsey Steell | 20/02/2019 | 13/03/2019 | 04/03/2019 |
North Mymms Parish Council | Linsey Steell | 17/05/2019 | ||
WHBC - Client Services | Lorraine Davis | 17/05/2019 | ||
WHBC - Client Services | Lorraine Davis | 20/02/2019 | 13/03/2019 | 25/02/2019 |
Hertfordshire Ecology | Martin Hicks | 27/02/2019 | 20/03/2019 | |
Hertfordshire Ecology | Martin Hicks | 17/05/2019 | ||
WHBC - Public Health and Protection | Public Health and Protection | 17/05/2019 | ||
WHBC - Public Health and Protection | Public Health and Protection | 20/02/2019 | 13/03/2019 | 11/03/2019 |
Address | Date Sent | Expiry Date | Date Reconsulted | Reconsult Expiry Date |
---|---|---|---|---|
23 Pine Grove Brookmans Park Hatfield AL9 7BP | 20/02/2019 | 13/03/2019 | ||
24 Pine Grove Brookmans Park Hatfield AL9 7BS | 20/02/2019 | 13/03/2019 | ||
28 Pine Grove Brookmans Park Hatfield AL9 7BS | 20/02/2019 | 13/03/2019 | ||
Fairmount 10A Upland Drive Brookmans Park Hatfield AL9 6PS | 20/02/2019 | 13/03/2019 | ||
11 Upland Drive Brookmans Park Hatfield AL9 6PS | 20/02/2019 | 13/03/2019 |
Application Number | Proposal | Decision | Distance |
---|---|---|---|
6/2022/0352/HOUSE | Erection of a single storey and first floor rear extension including 2 x roof lanterns, a side loggia with glazed roof and rendering of the rear of the building. | Granted | 0 |
6/2020/3297/HOUSE | Replacement of roof structure and increase in ridge height; and erection of rear dormer with external roof terrace | Withdrawn | 0 |
6/2019/3255/COND | Submission of details pursuant to condition 1 (materials) on planning permission 6/2019/0308/FULL | Granted | 0 |
6/2019/0309/HOUSE | Erection of single storey side extension, two storey front, side and rear extensions to form a crown roof with side and rear dormers following part demolition of existing dwelling | Granted | 0 |
S6/2012/0771/LUP | Certificate of Lawfulness for erection of single storey rear extension | Granted | 0 |
S6/2010/2342/FP | Erection of conservatory, repositioning of garage door, installation of glass panels to front and rear balcony and alterations to fenestration | Granted | 0 |
S6/2005/0287/FP | ERECTION OF REPLACEMENT DWELLING AFTER DEMOLITION OF EXISTING DWELLING | Granted | 0 |
S6/2004/1850/FP | ERECTION OF REPLACEMENT DWELLING AFTER DEMOLITION OF EXISTING DWELLING (FURTHER TO OUTLINE PLANNING PERMISSION S6/2002/324/OP) | Refused | 0 |
S6/2003/1754/FP | ERECTION OF SINGLE STOREY SIDE AND REAR EXTENSION AND TWO STOREY FRONT EXTENSION | Granted | 0 |
S6/2002/0324/OP | ERECTION OF REPLACEMENT DWELLING HOUSE AFTER DEMOLITION OF EXISTING BUNGALOW. (OUTLINE APPLICATION) | Granted | 0 |
S6/1998/0377/FP | Erection of two storey side extension, alteration of front elevation and erection of pitched roof over existing single storey side extension | Granted | 0 |
S6/1997/0303/FP | Erection of single storey and first floor side extensions, alterations to roof and formation of front porch | Granted | 0 |
S6/1995/0856/FP | Conversion of single dwelling to 2 No. self contained flats (Retrospective Application) | Granted | 0 |
There are no NMAs associated with this application