Return to search results
-
Start a new search
- The consultation period for this application has now closed
Planning Application: 6/2018/3054/MAJ
MAJOR DEVELOPMENT
|
Decided - Granted
|
Mrs Sarah Smith
|
s.smith@welhat.gov.uk
|
Bush Hall Hotel Chequers Hatfield AL9 5NT
|
Refurbishment, alteration and extension of the hotel complex; replacement dining and function room, following the demolition of more modern extensions and outbuildings, reconfiguration of the car park and gardens, including external lighting, hard and soft landscaping and associated infrastructure.
|
523791
|
209964
|
|
|
Hatfield
|
200003860276
|
30/11/2018
|
30/11/2018
|
05/01/2019
|
30/12/2018
|
08/02/2019
|
|
Mr M Hendry
|
Mr M Schooling
|
76 Broad Street
Ely
CB7 4BE
|
C/O Agent
|
Description | Distance |
---|---|
Listed Buildings Combined | 33.80 |
Listed Buildings Combined | 0.00 |
Flood Zone 2 | 0.00 |
Flood Zone 2 | 0.00 |
Flood Zone 2 | 0.00 |
Flood Zone 3 | 0.00 |
Green Belt | 0.00 |
Landscape Character Area | 0.00 |
Parish | 0.00 |
Cycle Paths | 3.44 |
Cycle Paths | 3.57 |
Flood Zone Surface Water 100mm | 0.00 |
Flood Zone Surface Water 1000mm | 0.00 |
Flood Zone Surface Water 1000mm | 0.00 |
Flood Zone Surface Water 1000mm | 0.00 |
Hertfordshire Ecological Network | 0.00 |
Hertfordshire Ecological Network | 0.00 |
Sand and Gravel Belt | 0.00 |
High Pressure Gas Pipeline | 40.46 |
Granted
|
07/06/2019
|
07/06/2019
|
Delegated
|
|
To download a selection of individual documents place a tick alongside each of the relevant rows and then click on Download selected files. To download all of the documents place a tick in the box alongside the header row and all of the files will be selected, then click on Download selected files. To view individual documents click on the File for the required row.
File | Description | Date Uploaded | |
---|---|---|---|
Application Form - Without Personal Information | |||
File: ApplicationFormNoPersonalData.pdf (0 kb) | Description: Application Form - Redacted | Created Date: 30/11/2018 | |
Block Plan | |||
File: 282-004-C - Existing Site Block Plan.pdf (0 kb) | Description: Existing Site Block Plan | Created Date: 30/11/2018 | |
File: 282-011-K -Proposed Site.pdf (0 kb) | Description: Proposed Site | Created Date: 03/05/2019 | |
Elevations | |||
File: 282-060-B - Ex Elevs 1.pdf (0 kb) | Description: Existing Elevations | Created Date: 30/11/2018 | |
File: 282-061-C - Ex Elevs 2.pdf (0 kb) | Description: Existing Elevations 2 | Created Date: 30/11/2018 | |
File: 282-062-B - Ex Elevs 3.pdf (0 kb) | Description: Existing Elevation 3 | Created Date: 30/11/2018 | |
File: 282-150-G - NE and SW Elevs SB.pdf (0 kb) | Description: Proposed NE and SW Elevations | Created Date: 30/11/2018 | |
File: 282-151-E - W and E elevs.pdf (0 kb) | Description: Proposed Elevations | Created Date: 30/11/2018 | |
File: 282-152-D - C H elevs.pdf (0 kb) | Description: Proposed Elevations | Created Date: 30/11/2018 | |
File: 282-153-F - S B elevs.pdf (0 kb) | Description: Proposed Stable Block Elevations | Created Date: 30/11/2018 | |
Floor Plans | |||
File: 282-050-D - GF Existing.pdf (0 kb) | Description: Gf Existing | Created Date: 30/11/2018 | |
File: 282-051-D - 1F Existing.pdf (0 kb) | Description: First Floor Existing | Created Date: 30/11/2018 | |
File: 282-052-D - 2F Existing.pdf (0 kb) | Description: Existing Second Floor | Created Date: 30/11/2018 | |
File: 282-055-D - EX GF.pdf (0 kb) | Description: Existing Ground floor | Created Date: 30/11/2018 | |
File: 282-056-D - EX 1F.pdf (0 kb) | Description: Existing first floor | Created Date: 30/11/2018 | |
File: 282-070-C GFHistory.pdf (0 kb) | Description: Historic Ground Floor | Created Date: 30/11/2018 | |
File: 282-100-E gfdemo.pdf (0 kb) | Description: Proposed GF Demolition Plan | Created Date: 30/11/2018 | |
File: 282-101-C 1fdemo.pdf (0 kb) | Description: Proposed FF Demolition Plan | Created Date: 30/11/2018 | |
File: 282-109-F FR gfplan.pdf (0 kb) | Description: Proposed GF Plan Function Room | Created Date: 30/11/2018 | |
File: 282-110-K gfplan.pdf (0 kb) | Description: Proposed Ground Floor | Created Date: 30/11/2018 | |
File: 282-111-G 1fplan.pdf (0 kb) | Description: Proposed First Floor | Created Date: 30/11/2018 | |
File: 282-112-G 2fplan.pdf (0 kb) | Description: Proposed second Floor | Created Date: 30/11/2018 | |
Landscape Plans | |||
File: 282-500-A Landscape Plan.pdf (0 kb) | Description: Landscape Plan | Created Date: 30/11/2018 | |
File: 282-502-A Topsoil Management Plan.pdf (0 kb) | Description: Landscape Plan | Created Date: 30/11/2018 | |
File: 282-501-revC.pdf (0 kb) | Description: Landscape Plan | Created Date: 03/05/2019 | |
File: 282-503-revD.pdf (0 kb) | Description: Landscape Plan | Created Date: 03/05/2019 | |
File: 282-506-revC.pdf (0 kb) | Description: Landscape Plan | Created Date: 03/05/2019 | |
File: 282-510-revA.pdf (0 kb) | Description: Landscape sections sheet 1 | Created Date: 03/05/2019 | |
File: 282-511-revA.pdf (0 kb) | Description: Landscape sections sheet 2 | Created Date: 03/05/2019 | |
Location Plan | |||
File: 282-007-C - Existing Site Plan.pdf (0 kb) | Description: Existing Site Plan | Created Date: 30/11/2018 | |
File: 282-006-C - Location Plan.pdf (0 kb) | Description: Location Plan | Created Date: 13/02/2019 | |
Plans | |||
File: 282-108-H SB gfplan.pdf (0 kb) | Description: Proposed GF Stable Block | Created Date: 30/11/2018 | |
File: 282-160-e P Stair Sect.pdf (0 kb) | Description: Stair Sections | Created Date: 30/11/2018 | |
File: 282-161-E P BH Long Sect.pdf (0 kb) | Description: Long Proposed Section | Created Date: 30/11/2018 | |
File: 282-100-E gfdemo.pdf (0 kb) | Description: Proposed GF Demolition Plan | Created Date: 13/02/2019 | |
File: 282-642-A - Pedestrian Access.pdf (0 kb) | Description: Pedestrian Access.pdf | Created Date: 13/02/2019 | |
File: 6600 - EOC Proposed Drainage Strategy P3.pdf (0 kb) | Description: Proposed Drainage Strategy Plan | Created Date: 19/03/2019 | |
File: 282-504-revA.pdf (0 kb) | Description: Kerbs and Edges Plan | Created Date: 03/05/2019 | |
Site Sections | |||
File: 282-162-D DR Short Sections.pdf (0 kb) | Description: Dining Room Short Sections | Created Date: 30/11/2018 | |
File: 282-164-E FR Sections.pdf (0 kb) | Description: Function Sections | Created Date: 30/11/2018 | |
Design & Access Statement | |||
File: 282-D and A BH 181123 Rev B.pdf (0 kb) | Description: Design & Access Statement Rev B | Created Date: 03/12/2018 | |
Landscape Report | |||
File: 282-10yrManagementPlan.pdf (0 kb) | Description: 10 Year Landscape Management Plan | Created Date: 30/11/2018 | |
File: 282-Hard Landscape Materials(1).pdf (0 kb) | Description: Hard Landscape Materials | Created Date: 03/12/2018 | |
Planning Statement | |||
File: Bush Hall Planning Statement(1).pdf (0 kb) | Description: Planning Statement | Created Date: 30/11/2018 | |
File: Bush Hall Planning Statement.pdf (0 kb) | Description: Planning Statement | Created Date: 03/12/2018 | |
Transport Statement | |||
File: Transport Statement 271118 with appendices.pdf (0 kb) | Description: Transport Statement | Created Date: 03/12/2018 | |
Consultee Response | |||
File: 6-19-2271-1.pdf (0 kb) | Description: Comment - Historic Environment Advisor | Created Date: 24/10/2019 | |
File: Comments.pdf (0 kb) | Description: Comment - Parking Services - WHBC | Created Date: 10/12/2018 | |
File: Comments(1).pdf (0 kb) | Description: Comment - WHBC - Client Services | Created Date: 12/12/2018 | |
File: NATIONAL_GRID_EA_TE_Z5_3NWP_014838_1_62476.pdf (0 kb) | Description: Comment - Cadent Gas | Created Date: 11/12/2018 | |
File: Reply to Planning.pdf (0 kb) | Description: Comment - Hertfordshire Constabulary | Created Date: 11/12/2018 | |
File: Comments(2).pdf (0 kb) | Description: Comment - The Gardens Trust | Created Date: 18/12/2018 | |
File: Consultation response 6_2018_3054_MAJ.pdf (0 kb) | Description: Comments - Natural England | Created Date: 14/12/2018 | |
File: Bush Hall Hotel.pdf (0 kb) | Description: Conditional - WHBC Public Health & Protection | Created Date: 18/12/2018 | |
File: Comments(3).pdf (0 kb) | Description: Comment - Hertfordshire Constabulary Stanborough Road Welwyn Garden City AL8 6XF | Created Date: 20/12/2018 | |
File: Comments(4).pdf (0 kb) | Description: Support - Hatfield Town Council | Created Date: 20/12/2018 | |
File: FAO_ Case Officer June Pagdin, Highways England response re Planning Application for Bush Hall Hotel, Chequers, Hatfield, AL9 5NT.pdf (0 kb) | Description: Comment - Highways England | Created Date: 20/12/2018 | |
File: dps1.pdf (0 kb) | Description: Comment - Environment Agency | Created Date: 20/12/2018 | |
File: 6-18-3054-1(2).pdf (0 kb) | Description: Conditional - Historic Environment Advisor | Created Date: 02/01/2019 | |
File: Bush Hall Hotel Chequers Hatfield AL9 5NT 6.2018.3054.MAJ inform bats birds cond lighting.pdf (0 kb) | Description: Conditional - Herts Biological Records Centre | Created Date: 07/01/2019 | |
File: 620183054MAJ - LLFA 07.01.19.pdf (0 kb) | Description: Objection - LLFA | Created Date: 07/01/2019 | |
File: Planning application 6_2018_3054_MAJ - Bush Hall Hotel.pdf (0 kb) | Description: Objection - Herts Transport Programmes & Strategy | Created Date: 09/01/2019 | |
File: 620183054MAJ_HERef_P01025856_L336669.pdf (0 kb) | Description: Comment - Historical England | Created Date: 22/01/2019 | |
File: Consultee Response - Ref_ Formal Planning Application – Your Ref_ 6_2018_3054_MAJ Our Ref_ EA_TE_Z5_3NWP_014838.pdf (0 kb) | Description: Comment - Cadent Gas | Created Date: 31/01/2019 | |
File: 6_2018_3055_LB & 6_2018_3054_MAJ Bush Hall Hotel, Hatfield 04.02.19.pdf (0 kb) | Description: Comment - Place Services | Created Date: 04/02/2019 | |
File: Planning application 6_2018_3054_MAJ - Bush Hall Hotel(1).pdf (0 kb) | Description: Conditional - Herts Transport Programmes & Strategy | Created Date: 26/02/2019 | |
File: Email-Bush Hall 2018 3054.pdf (0 kb) | Description: WHBC Landscaping and Ecology | Created Date: 27/02/2019 | |
File: 620183054MAJ - LLFA 05.03.19(1).pdf (0 kb) | Description: Objection - LLFA | Created Date: 05/03/2019 | |
File: 620183054MAJ - LLFA 03.04.19.pdf (0 kb) | Description: Objection - LLFA | Created Date: 03/04/2019 | |
File: 129579-02.pdf (0 kb) | Description: Comment - Environment Agency | Created Date: 08/05/2019 | |
File: 620183054MAJ - LLFA 23.05.19.pdf (0 kb) | Description: Conditional- Lead Local Flood Authority | Created Date: 24/05/2019 | |
Neighbour Representation - Without Personal Information | |||
File: Bush hall comments.pdf (0 kb) | Description: Comment - 81 Crawford Road - Attachment | Created Date: 30/12/2018 | |
Officer Report PDF | |||
File: Delegated Report_620183054MAJ(10).pdf (0 kb) | Description: Officer Report | Created Date: 07/06/2019 | |
Decision Notice | |||
File: Decision Notice_620183054MAJ.pdf (0 kb) | Description: Decision Notice PDF | Created Date: 07/06/2019 | |
Flood Impact Assessment | |||
File: Bush Hall Hotel FRA Final 3 November 2018_complete (small).pdf (0 kb) | Description: Flood Risk Assessment | Created Date: 03/12/2018 | |
File: 6600 - Bush Hall, Hatfield - Drainage Statement Addendum - Issue 1 with ....pdf (0 kb) | Description: Drainage Statement Addendum - Issue 1 | Created Date: 03/05/2019 | |
File: 6600 - EOC Below Ground Drainage Plan P5.pdf (0 kb) | Description: Below Ground Drainage Plan | Created Date: 03/05/2019 | |
File: 6600 - EOC Impermeable Area Plan.pdf (0 kb) | Description: Impermeable Area Plan | Created Date: 03/05/2019 | |
Heritage Statement | |||
File: 181123 Bush Hall Heritage Statement_Redacted.pdf (0 kb) | Description: Heritage Statement- Redacted | Created Date: 07/12/2018 | |
Noise Impact Assessment | |||
File: 20181121 Bush Hall Noise Impact Assessment.pdf (0 kb) | Description: Noise Impact Assessment | Created Date: 30/11/2018 | |
File: 20181121 Bush Hall Noise Impact Assessment(1).pdf (0 kb) | Description: Noise Impact Assessment | Created Date: 03/12/2018 | |
Report | |||
File: AIA TPP Bush Hall 1118 Ref AIABH1118phrev.1.pdf (0 kb) | Description: Arboricultural Report | Created Date: 30/11/2018 | |
File: Archaeology 1819 rep rev 21 Nov 2018.pdf (0 kb) | Description: Archaeology | Created Date: 30/11/2018 | |
File: 20170723 Bush Hall hotel bat survey report.pdf (0 kb) | Description: Bat Survey Report | Created Date: 03/12/2018 | |
File: 20181114_PEA v3_issue.pdf (0 kb) | Description: Preliminary Ecological Assessment | Created Date: 03/12/2018 | |
File: Energy Statement Bush Hall Rev B(1).pdf (0 kb) | Description: Energy Statement Bush Hall Rev B | Created Date: 03/12/2018 | |
File: AIA TPP Bush Hall 1118 Ref AIABH1118phrev.1(1).pdf (0 kb) | Description: Arboricultural Report & Impact Assessment | Created Date: 03/12/2018 | |
File: Bush Hall - Building Recording Report 23.05.18(1).pdf (0 kb) | Description: Archaeology Report | Created Date: 05/02/2019 | |
File: 6600 - Bush Hall, Hatfield - DS - Issue 2 (With Appendices) 1(3).pdf (0 kb) | Description: Drainage Strategy Issue 2 with Appendix | Created Date: 19/03/2019 | |
Roof Plans | |||
File: 282-057-B rfplan.pdf (0 kb) | Description: Existing Roof Plan | Created Date: 30/11/2018 | |
File: 282-114-E hallroof.pdf (0 kb) | Description: Hall Roof | Created Date: 30/11/2018 | |
Site Notice | |||
File: Site Notice_620183054MAJ(3)(1).pdf (0 kb) | Description: Site Notice - Departure | Created Date: 18/12/2018 | |
File: Site Notice_620183054MAJ(3)(2).pdf (0 kb) | Description: Site Notice - Setting of Listed Building | Created Date: 19/12/2018 | |
File: Site Notice_620183054MAJ(3)(3).pdf (0 kb) | Description: Site Notice | Created Date: 17/01/2019 | |
Superseded Plans | |||
File: 282-011-J -Proposed Site.pdf (0 kb) | Description: Proposed Site | Created Date: 30/11/2018 | |
File: 282-006-B - Location Plan.pdf (0 kb) | Description: Location Plan | Created Date: 30/11/2018 | |
File: 282-501-A Tree Works Plan .pdf (0 kb) | Description: Landscape Plan | Created Date: 30/11/2018 | |
File: 282-503-B Hardworks Plan.pdf (0 kb) | Description: Landscape Plan | Created Date: 30/11/2018 | |
File: 282-505-A Tree Planting Plan.pdf (0 kb) | Description: Landscape Plan | Created Date: 30/11/2018 | |
File: 282-506-A Understorey Planting.pdf (0 kb) | Description: Landscape Plan | Created Date: 30/11/2018 | |
File: 282-510- Landscape sections.pdf (0 kb) | Description: Landscape sections sheet 1 | Created Date: 30/11/2018 | |
File: 282-511- Landscape sections.pdf (0 kb) | Description: Landscape sections sheet 2 | Created Date: 30/11/2018 | |
File: 282-505-revC.pdf (0 kb) | Description: Landscape Plan | Created Date: 03/05/2019 | |
Supporting Information | |||
File: 282-Hard Landscape Materials.pdf (0 kb) | Description: Hard Landscape Materials | Created Date: 30/11/2018 | |
File: Planning Appendix A Pre-app report_620181287PA.pdf (0 kb) | Description: Pre App Report 620181287pa | Created Date: 30/11/2018 | |
File: Energy Statement Bush Hall Rev B.pdf (0 kb) | Description: Energy Statement Bush Rev B | Created Date: 30/11/2018 | |
File: Planning Appendix A Pre-app report_620181287PA(1).pdf (0 kb) | Description: Pre Application Report | Created Date: 03/12/2018 | |
File: Bush Hall Hotel - AIA - Rev A - Nov 2018.pdf (0 kb) | Description: Arboriculture impact assessment | Created Date: 30/11/2018 | |
File: Bush Hall Hotel - Draft TPP - Rev A - Nov 2018.pdf (0 kb) | Description: Draft Tree Protection | Created Date: 30/11/2018 | |
File: Bush Hall Hotel - TCP - Rev A - Nov 2018.pdf (0 kb) | Description: Tree Constraints Plan | Created Date: 30/11/2018 | |
File: 282-507- Planting schedules.pdf (0 kb) | Description: Planting Schedules | Created Date: 30/11/2018 | |
File: Bush Hall - Building Recording Report 23.05.18.pdf (0 kb) | Description: Historic Building Inspection Report - Bush Hall - Building Recording Report 23.05.18.pdf | Created Date: 03/01/2019 | |
File: 6600 - Bush Hall, Hatfield - DS - Issue 2 (With Appendices) 2.pdf (0 kb) | Description: Appendix 4 | Created Date: 13/02/2019 | |
File: 6600 - Bush Hall, Hatfield - DS - Issue 2 (With Appendices) 1.pdf (0 kb) | Description: Drainage Strategy - Issue 2 (With Appendices) 1.pdf | Created Date: 13/02/2019 | |
File: 6600 - Bush Hall, Hatfield - DS - Issue 2 (With Appendices) 2(4).pdf (0 kb) | Description: Appendix 4 | Created Date: 19/03/2019 | |
Sustainablity Assessment | |||
File: 282-507- Planting schedules(1).pdf (0 kb) | Description: Planting Schedule | Created Date: 03/12/2018 |
Organisation | Name | Sent | Reply Due | Reply Received |
---|---|---|---|---|
Herts & Middlesex Wildlife Trust | 07/12/2018 | 28/12/2018 | ||
Herts & Middlesex Wildlife Trust | 07/06/2019 | |||
Joint Committee of the National Amenity Societies | Case Officer | 07/12/2018 | 28/12/2018 | |
Place Services | Conservation Officer | 07/12/2018 | 28/12/2018 | 04/02/2019 |
Place Services | Conservation Officer | 07/06/2019 | ||
The Gardens Trust | Conservation Team | 07/06/2019 | ||
The Gardens Trust | Conservation Team | 07/12/2018 | 28/12/2018 | 18/12/2018 |
Natural England | Consultation Service | 11/12/2018 | 01/01/2019 | 14/12/2018 |
Welwyn Hatfield Borough Council | Councillor Caroline Gillett | 07/12/2018 | 28/12/2018 | |
Welwyn Hatfield Borough Council | Councillor Caroline Gillett | 07/06/2019 | ||
Welwyn Hatfield Borough Council | Councillor Kerstin Holman | 07/06/2019 | ||
Welwyn Hatfield Borough Council | Councillor Kerstin Holman | 07/12/2018 | 28/12/2018 | |
Welwyn Hatfield Borough Council | Councillor Peter Hebden | 07/12/2018 | 28/12/2018 | |
Welwyn Hatfield Borough Council | Councillor Peter Hebden | 07/06/2019 | ||
Hertfordshire County Council | Emma Chapman - Spatial Planning & Economy Team | 07/12/2018 | 28/12/2018 | |
Lead Local Flood Authority | Fiona Lai | 19/03/2019 | 29/03/2019 | 03/04/2019 |
Lead Local Flood Authority | Fiona Lai | 03/05/2019 | 13/05/2019 | 24/05/2019 |
Lead Local Flood Authority | Fiona Lai | 13/02/2019 | 06/03/2019 | 05/03/2019 |
Lead Local Flood Authority | Fiona Lai | 07/06/2019 | ||
Lead Local Flood Authority | Fiona Lai | 07/12/2018 | 28/12/2018 | 07/01/2019 |
Hertfordshire Constabulary | Gerry Brophy | 07/12/2018 | 28/12/2018 | 11/12/2018 |
Hertfordshire Constabulary | Gerry Brophy | 18/01/2019 | 08/02/2019 | 20/12/2018 |
Hertfordshire County Council | Hertfordshire Transport Programmes & Strategy | 13/02/2019 | 06/03/2019 | 26/02/2019 |
Hertfordshire County Council | Hertfordshire Transport Programmes & Strategy | 07/12/2018 | 28/12/2018 | 09/01/2019 |
Hertfordshire County Council | Hertfordshire Transport Programmes & Strategy | 07/06/2019 | ||
Hertfordshire County Council | Historic Environment Advisor | 07/06/2019 | ||
Hertfordshire County Council | Historic Environment Advisor | 07/12/2018 | 28/12/2018 | 02/01/2019 |
Hertfordshire County Council | Historic Environment Advisor | 07/12/2018 | 28/12/2018 | |
Hatfield Town Council | Jonah Anthony | 07/12/2018 | 28/12/2018 | 20/12/2018 |
Hatfield Town Council | Jonah Anthony | 07/06/2019 | ||
Welwyn Hatfield Borough Council | Landscapes Department | 07/06/2019 | ||
Welwyn Hatfield Borough Council | Landscapes Department | 07/12/2018 | 28/12/2018 | |
WHBC - Client Services | Lorraine Davis | 07/12/2018 | 28/12/2018 | 12/12/2018 |
WHBC - Client Services | Lorraine Davis | 07/06/2019 | ||
Hertfordshire Ecology | Martin Hicks | 07/12/2018 | 28/12/2018 | 07/01/2019 |
Hertfordshire Ecology | Martin Hicks | 07/06/2019 | ||
Welwyn Hatfield Access Group | Mr B Wilson | 11/12/2018 | 01/01/2019 | |
Cadent Gas Limited | Mr S Carter | 07/12/2018 | 28/12/2018 | 11/12/2018 |
Cadent Gas Limited | Mr S Carter | 07/06/2019 | ||
Environment Agency | Natasha Smith | 07/06/2019 | ||
Environment Agency | Natasha Smith | 07/12/2018 | 28/12/2018 | 08/05/2019 |
Environment Agency | Natasha Smith | 03/05/2019 | 13/05/2019 | |
Thames Water, Development Control | Nicky McHugh | 03/05/2019 | 13/05/2019 | |
Thames Water, Development Control | Nicky McHugh | 07/12/2018 | 28/12/2018 | |
Welwyn Hatfield Borough Council | Parking Services | 07/12/2018 | 28/12/2018 | 10/12/2018 |
Welwyn Hatfield Borough Council | Parking Services | 07/06/2019 | ||
Highways England | Planning | 07/12/2018 | 28/12/2018 | 20/12/2018 |
WHBC - Public Health and Protection | Public Health and Protection | 07/12/2018 | 28/12/2018 | 18/12/2018 |
WHBC - Public Health and Protection | Public Health and Protection | 07/06/2019 | ||
Historic England | Tom Goodman | 18/01/2019 | 08/02/2019 | 22/01/2019 |
Address | Date Sent | Expiry Date | Date Reconsulted | Reconsult Expiry Date |
---|---|---|---|---|
Bush Hall House Mill Green Bush Hall Lane Hatfield AL9 5NT | 07/12/2018 | 30/12/2018 | ||
Turbine House Mill Green Chequers Hatfield AL9 5NT | 07/12/2018 | 30/12/2018 | ||
81 Crawford Road Hatfield AL10 0PF | ||||
Hertfordshire Constabulary Stanborough Road Welwyn Garden City AL8 6XF |
Application Number | Proposal | Decision | Distance |
---|---|---|---|
6/2022/1906/FULL | Erection of single bridge over the leat to the River Lea, following removal of two existing bridges and erection of balustrade to river terrace | Withdrawn | 0 |
6/2022/1907/LB | Erection of single bridge over the leat to the River Lea, following removal of two existing bridges and erection of balustrade to river terrace | Withdrawn | 0 |
6/2022/0990/LB | Replacement ceiling and timber strengthening works | Granted | 0 |
6/2021/3066/LB | Further internal and external refurbishments and alterations in addition to the previously approved works under Listed Building Consents 6/2018/3055/LB and 6/2019/2272/VAR | Granted | 0 |
6/2021/3027/VAR | Variation of condition to 1 (Approved Surface Water Drainage), 2 (Detailed Surface Water Drainage), 6 (Materials), 7 (Window Details) and 18 (Approved Plans) on planning permission 6/2019/2271/MAJ | Granted | 0 |
6/2021/1488/COND | Submission of details pursuant to condition 3 (Archaeological Monitoring, Excavation and Recording) on planning permission 6/2019/2271/VAR | Granted | 0 |
6/2021/1490/COND | Submission of details pursuant to condition 1(Archaeological Monitoring, Excavation and Recording) on planning permission 6/2019/2272/VAR | Granted | 0 |
6/2020/0442/COND | Submission of details pursuant to condition 2 (surface water drainage scheme) on planning permission 6/2019/2271/VAR | Granted | 0 |
6/2020/0301/COND | Submission of details pursuant conditions 6 (materials), 7 (openings), 8 (function room), 11 (ventilation) and 14 (external lighting) on planning permission 6/2019/2271/VAR. | Granted | 0 |
6/2020/0302/COND | Submission details pursuant to condition 3 (materials) and 8 (rainwater goods) on listed building consent 6/2019/2272/VAR | Granted | 0 |
6/2019/2960/COND | Submission of details pursuant to condition 1 (surface water drainage shown on the below ground drainage plan) 2 (surface water drainage) on planning application 6/2018/3054/MAJ | Part Approved / Part Refused | 0 |
6/2019/2271/VAR | Variation of condition to 4 (Tree Protection) and 18 (Drawings) on planning permission 6/2018/3054/MAJ | Granted | 0 |
6/2019/2272/VAR | Variation of condition 9 (Drawings) on listed building consent 6/2018/3055/LB | Granted | 0 |
6/2019/1925/COND | Submission of details pursuant to condition 3 (Archaeological scheme of investigation) on planning permission 6/2018/3054/MAJ | Granted | 0 |
6/2019/1905/COND | Submission of details pursuant to condition 1 (Archaeology) on listed building consent 6/2018/3055/LB | Granted | 0 |
6/2018/3055/LB | Internal and external refurbishment, alteration and extension of the hotel complex; replacement dining and function room, following the demolition of more modern extensions and outbuildings, reconfiguration of the car park and gardens, including external lighting, hard and soft landscaping and associated infrastructure | Granted | 0 |
6/2018/1710/LAWLB | Certificate of lawfulness for proposed works to listed building to reconstruct lantern light | Withdrawn | 0 |
6/2018/1892/LAWLB | Certificate of lawfulness for the proposed work to listed building to include liquid waterproofing materials for some sections of parapet and box guttering | Granted | 0 |
6/2018/1893/LAWLB | Certificate of lawfulness for the proposed work to listed building to include repairs to supporting structure of the existing bell tower at roof level on the main building | Withdrawn | 0 |
6/2018/1894/LAWLB | Certificate of lawfulness for the proposed work to listed building to include structural repairs to high level gable brickwork to west elevation, dismantling and reconstruction of the bottom section of a chimney stack, dismantling and reconstruction of bottom section of brickwork to a chimney stack | Withdrawn | 0 |
6/2018/1897/LAWLB | Certificate of lawfulness for the proposed work to listed building to include works to replace one structural beam and support an existing second beam, connected to the first, with a proprietary steel support | Withdrawn | 0 |
6/2018/1170/COND | Submission of details pursuant to condition 7 (archaeological scheme of investigation) on listed building consent 6/2017/1247/LB, dated 16/08/2017 | Granted | 0 |
6/2018/1062/COND | Submission of details pursuant to condition 1 (painting of external walls), 2 (areas for treatment to be marked), 3 (details regarding repairment), 4 (no removal of historic lime plaster), 5 (details of timescales) and 6 (historic timbers), on planning permission 6/2017/1247/LB | Granted | 0 |
6/2018/0512/VAR | Variation of condition 7 (archaeological scheme of investigation) on listed building consent 6/2017/1247/LB | Withdrawn | 0 |
6/2018/0460/COND | Submission of details pursuant to condition 7 (archaeological written scheme of investigation) on listed building consent 6/2017/1247/LB, dated 16/08/2017 | Part Discharged | 0 |
6/2017/1247/LB | Re-roofing of main building and adjacent block including timber repairs and installation of insulation. Brickwork cleaning, repairs and re-pointing to main house. Repairs to timber bell tower, dormer windows, windows, cladding and other joinery to both buildings. Replacement of lead flashings and roofing where removed. Cleaning and decoration of previously painted surfaces. Replacement of two large rotten timber structural beams at roof level including dismantling and reinstating roof structure within the locality. | Granted | 0 |
N6/2011/0434/MA | Extensions and alteration to Bush Hall Hotel and Stable building and erection of new buildings to increase accommodation from 25 to 75 bedrooms along with ancillary facilities and relocation of car park | Granted | 0 |
N6/2011/0435/LB | Alterations and extensions to Bush Hall, The Coach House and the Stable Building including demolition of existing extensions to the rear and sides of Bush Hall and outbuildings and garden wall within its grounds | Granted | 0 |
N6/2009/1912/LB | Demolition and removal of existing extensions and outbuildings to the rear and north of Bush Hall, repair and improvements to Bush Hall and The Coach House including internal alterations and replacement of single storey link between Bush Hall and The Coach House and alterations to northern façade, to include the erection of a new conservatory | Withdrawn | 0 |
N6/2009/1913/MA | Demolition, alterations and extensions to existing hotel building(s) and erection of new hotel buildings to provide 50 bedrooms, replacement function room, restaurant, kitchen and staff facilities. New lodge building at the entrance to Bush hall to provide staff accommodation, refurbishment of existing stable building to provide spa facilities, conversion of Turbine cottage from residential to provide hotel office accommodation and associated engineering and landscaping works including two new digester tanks, relocation of main car park, reinstatement of Parkland landscaping, access and walled garden | Withdrawn | 0 |
N6/1997/0264/FP | Retention of a single storey extension for use as function room | Granted | 0 |
H/1991/5204/ | Erection of garden shed | Granted | 0 |
S6/1978/0572/ | Demoliton of existing pig sties and reconstruction to form stores. | Refused | 0 |
S6/1974/0278/ | Conversion of a stable block into bedrooms with bathrooms | Granted | 0 |
1978/0013 | Change to land for repairing of vehicles | Closed | 0 |
There are no NMAs associated with this application