Return to search results
-
Start a new search
- The consultation period for this application has now closed
Planning Application: 6/2017/2882/FULL
FULL PERMISSION
|
Decided - Withdrawn
|
Mr Tom Gabriel
|
t.gabriel@welhat.gov.uk
|
Burnside Hertford Road Essendon Hatfield AL9 5RB
|
Erection of a side extension for use as a biomass boiler house (retrospective)
|
526122
|
210391
|
|
|
Essendon
|
200003857291
|
12/12/2017
|
15/12/2017
|
|
11/01/2018
|
|
|
Mr A McPheat
|
BP Mitchell
|
Flitcroft House
114-116 Charing Cross Road
London
WC2H 0JR
|
|
Description | Distance |
---|---|
Green Belt | 0.00 |
Landscape Character Area | 0.00 |
Parish | 0.00 |
Parish | 62.07 |
Flood Zone Surface Water 1000mm | 0.00 |
Hertfordshire Ecological Network | 0.00 |
Sand and Gravel Belt | 0.00 |
Withdrawn
|
19/02/2018
|
19/02/2018
|
Delegated
|
|
To download a selection of individual documents place a tick alongside each of the relevant rows and then click on Download selected files. To download all of the documents place a tick in the box alongside the header row and all of the files will be selected, then click on Download selected files. To view individual documents click on the File for the required row.
File | Description | Date Uploaded | |
---|---|---|---|
Application Form - Without Personal Information | |||
File: ApplicationFormNoPersonalData.pdf (113 kb) | Description: Application Form - No Personal Data | Created Date: 12/12/2017 | |
Block Plan | |||
File: BPM-RCA-00-ZZ-DR-A-0102-Existing_Site_Plan_S1_P1.pdf (179 kb) | Description: Existing Site Plan | Created Date: 15/12/2017 | |
File: BPM-RCA-00-ZZ-DR-A-0103-Proposed_Site_Plan_S1_P1.pdf (223 kb) | Description: Proposed Site Plan | Created Date: 15/12/2017 | |
Elevation and Floor Plans | |||
File: BPM-RCA-00-ZZ-DR-A-0104-GA_Plans_Elevations_S1_P1.pdf (410 kb) | Description: Existing & Proposed Plans and Elevations | Created Date: 15/12/2017 | |
Location Plan | |||
File: BPM-RCA-00-ZZ-DR-A-0101-Site_Location_Plan_S1_P1.pdf (153 kb) | Description: Site Location Plan | Created Date: 15/12/2017 | |
Planning Statement | |||
File: BP Mitchell - Burnside Biomass Boiler PDAS.pdf (640 kb) | Description: Planning, Design & Access Statement | Created Date: 12/12/2017 | |
Consultee Response | |||
File: Comment -BP Mitchel Burnside Biomass Boiler.pdf (117 kb) | Description: Comment - Public Health & Protection | Created Date: 29/12/2017 | |
Superseded Plans | |||
File: BPM-RCA-00-ZZ-DR-A-0103-Proposed_Site_Plan_S1_P1.pdf (228 kb) | Description: Proposed Site Plan | Created Date: 12/12/2017 | |
File: BPM-RCA-00-ZZ-DR-A-0102-Existing_Site_Plan_S1_P1.pdf (188 kb) | Description: Existing Site Plan | Created Date: 12/12/2017 | |
File: BPM-RCA-00-ZZ-DR-A-0104-GA_Plans_Elevations_S1_P1.pdf (413 kb) | Description: Existing & Proposed Plans and Elevations | Created Date: 12/12/2017 | |
File: BPM-RCA-00-ZZ-DR-A-0101-Site_Location_Plan_S1_P1.pdf (145 kb) | Description: Site Location Plan | Created Date: 12/12/2017 |
Organisation | Name | Sent | Reply Due | Reply Received |
---|---|---|---|---|
Welwyn Hatfield Borough Council | Councillor John Dean | 21/12/2017 | 11/01/2018 | |
Welwyn Hatfield Borough Council | Councillor John Dean | 20/02/2018 | ||
Welwyn Hatfield Borough Council | Councillor Jonathan Boulton | 20/02/2018 | ||
Welwyn Hatfield Borough Council | Councillor Jonathan Boulton | 21/12/2017 | 11/01/2018 | |
Welwyn Hatfield Borough Council | Councillor Stephen Boulton | 21/12/2017 | 11/01/2018 | |
Welwyn Hatfield Borough Council | Councillor Stephen Boulton | 20/02/2018 | ||
Essendon Parish Council | Ms D Daniell | 20/02/2018 | ||
Essendon Parish Council | Ms D Daniell | 21/12/2017 | 11/01/2018 | |
WHBC - Public Health and Protection | Public Health and Protection | 21/12/2017 | 11/01/2018 | 28/12/2017 |
WHBC - Public Health and Protection | Public Health and Protection | 20/02/2018 |
Address | Date Sent | Expiry Date | Date Reconsulted | Reconsult Expiry Date |
---|---|---|---|---|
Burnside Cottage Hertford Road Hatfield AL9 5RB | 21/12/2017 | 11/01/2018 |
Application Number | Proposal | Decision | Distance |
---|---|---|---|
N6/2008/0734/CD | APPLICATION FOR USE OF LAND FOR RECYCLING OF BUILDERS WASTE AND CONCRETE BATCHING, CHANGE OF USE OF EXISTING HOUSE FOR USE AS COMPANY OFFICES, LOWERING OF GROUND LEVELS, PROVISION OF 2 METRE HIGH SECURITY FENCING AND SCREEN PLANTING | Objection | 0 |
N6/2004/1813/CD | RETROSPECTIVE APPLICATION FOR CONCRETE BATCHING PLANT AND REVISION TO STORAGE BAYS | Granted | 0 |
N6/2001/0414/LU | THE APPLICATION IS FOR A CERTIFICATE OF LAWFUL EXISTING USE IN RESPECT OF THAT LAND IDENTIFIED IN RED ON THE ATTACHED PLAN AND IS FOR THE OPEN STORAGE OF PLANT, EQUIPMENT, VEHICLES AND MATERIALS ASSOCIATED WITH A CONTRACTOR'S BUSINESS | Granted | 1 |
N6/2000/1632/CD | USE OF LAND AS RECYCLING CENTRE, INCLUDING TYRE SHREDDING; ERECTION OF BUILDING TO CONTAIN PRINCIPAL OPERATIONS, AND ALTERATIONS TO ACCESS | Granted | 0 |
N6/1999/0526/CD | Change of use from contractors yard to waste recycling and reclamation centre, including tyre shredding | Granted | 0 |
N6/1997/0102/CD | Application for a waste recycling and reclamation centre, by change of use from existing contractor's yard and existing crushing of concrete and screening of soil | Objection | 0 |
N6/1995/0238/LU | Certificate of Lawful Use of Waste Transfer Station | Granted | 0 |
1991/0107 | Change of use | Notice issued | 0 |
2000/0214 | Material change in the use of the Land from the use for a contractor' yard and waste transfer station to a mixed use for both a contractor's yard and waste transfer station and a composting facility without the benefit of planning permission. the term 'composting facility' throughout this notice means the importation and deposit of unprocessed and processed green and organic waste material and the use of shredders and screeners to process that material or the burning of that material | Closed | 0 |
There are no NMAs associated with this application