Return to search results
-
Start a new search
- The consultation period for this application has now closed
Planning Application: 6/2017/2317/MAJ
MAJOR DEVELOPMENT
|
Decided - Granted
|
Mr Michael Robinson
|
m.robinson@welhat.gov.uk
|
Tesco Stores Ltd Shire Park Kestrel Way Welwyn Garden City AL7 1GA
|
Replacement of existing petrol filling station and hand car wash, alterations and reconfiguration of existing vehicular and pedestrian accesses and associated car parking, hard and soft landscaping.
|
524467
|
213831
|
|
|
|
|
10/10/2017
|
13/10/2017
|
08/11/2017
|
08/11/2017
|
30/05/2019
|
|
Miss C Bruce
|
TESCO Stores Ltd
|
Fourth Floor
33 Margaret Street
London
W1G 0JD
|
C/O Agent
|
Description | Distance |
---|---|
Employment Area | 0.00 |
Cycle Paths | 6.84 |
Flood Zone Surface Water 30mm | 0.00 |
Flood Zone Surface Water 30mm | 0.00 |
Flood Zone Surface Water 30mm | 0.00 |
Flood Zone Surface Water 30mm | 0.00 |
Flood Zone Surface Water 30mm | 0.00 |
Flood Zone Surface Water 30mm | 0.00 |
Flood Zone Surface Water 100mm | 0.00 |
Flood Zone Surface Water 100mm | 0.00 |
Flood Zone Surface Water 100mm | 0.00 |
Flood Zone Surface Water 100mm | 0.00 |
Flood Zone Surface Water 100mm | 0.00 |
Flood Zone Surface Water 100mm | 0.00 |
Flood Zone Surface Water 100mm | 0.00 |
Flood Zone Surface Water 100mm | 0.00 |
Flood Zone Surface Water 100mm | 0.00 |
Flood Zone Surface Water 100mm | 0.00 |
Flood Zone Surface Water 100mm | 0.00 |
Flood Zone Surface Water 1000mm | 0.00 |
Flood Zone Surface Water 1000mm | 0.00 |
Flood Zone Surface Water 1000mm | 0.00 |
Flood Zone Surface Water 1000mm | 0.00 |
Flood Zone Surface Water 1000mm | 0.00 |
Flood Zone Surface Water 1000mm | 0.00 |
Hertfordshire Ecological Network | 0.00 |
Sand and Gravel Belt | 0.00 |
Granted
|
25/01/2018
|
25/01/2018
|
Delegated
|
|
To download a selection of individual documents place a tick alongside each of the relevant rows and then click on Download selected files. To download all of the documents place a tick in the box alongside the header row and all of the files will be selected, then click on Download selected files. To view individual documents click on the File for the required row.
File | Description | Date Uploaded | |
---|---|---|---|
Application Form - Without Personal Information | |||
File: ApplicationFormNoPersonalData.pdf (0 kb) | Description: Application Form - No Personal Data | Created Date: 10/10/2017 | |
File: ApplicationFormNoPersonalData(1).pdf (0 kb) | Description: NMA - Application Form - No Personal Data(1) | Created Date: 25/04/2018 | |
Block Plan | |||
File: SSA 6226-Shire Park -P03 Rev B Proposed PFS Site Plan.pdf (0 kb) | Description: Proposed PFS Site Plan | Created Date: 10/10/2017 | |
Elevation and Floor Plans | |||
File: 1617-A-0000 Location Plan.pdf (0 kb) | Description: NMA - Location Plan | Created Date: 25/04/2018 | |
Elevations | |||
File: SSA 6226-Shire Park -P05 Rev A Proposed Flexi PFS Elevations.pdf (0 kb) | Description: Proposed Flexi PFS Elevations | Created Date: 13/10/2017 | |
Landscape Plans | |||
File: 114498-PL-8004-.pdf (0 kb) | Description: Landscape Proposal Plan | Created Date: 13/10/2017 | |
File: 114498-PL-8008-B-A1LV.pdf (0 kb) | Description: Landscape Construction Details | Created Date: 13/10/2017 | |
Location Plan | |||
File: 1617-A-0000 Location Plan - Copy(1).pdf (0 kb) | Description: Location Plan | Created Date: 10/10/2017 | |
Plans | |||
File: 1617-A-0200 Existing Campus Plan.pdf (0 kb) | Description: Existing Campus Plan | Created Date: 10/10/2017 | |
File: 1617-A-0220 Existing Tesco Campus Boundaries.pdf (0 kb) | Description: Existing Tesco Campus Boundaries | Created Date: 10/10/2017 | |
File: 1617-A-0210 Proposed Demolitions.pdf (0 kb) | Description: Proposed Demolitions | Created Date: 10/10/2017 | |
File: 1617-A-1000 Proposed Campus Plan.pdf (0 kb) | Description: Proposed Campus Plan | Created Date: 10/10/2017 | |
File: 1617-A-1111 Proposed Checkout Plan (Planning).pdf (0 kb) | Description: Proposed Checkout Plan | Created Date: 10/10/2017 | |
File: 1617-A-1121 Proposed Snowball and Central Drive Plan (Planning).pdf (0 kb) | Description: Proposed Snowball and Central Drive Plan | Created Date: 10/10/2017 | |
File: 114498-1809-B.pdf (0 kb) | Description: Campus Improvement Works - Articulated Vehicle Tracking | Created Date: 10/10/2017 | |
File: 114498-1807-D.pdf (0 kb) | Description: Campus Improvement Works - Estate Vehicle Tracking | Created Date: 10/10/2017 | |
File: 114498-1808-B.pdf (0 kb) | Description: Campus Improvement Works - Fire Appliance and Minibus Tracking | Created Date: 10/10/2017 | |
File: 114498-2005-A.pdf (0 kb) | Description: External Levels - Central Drive & Car Park | Created Date: 10/10/2017 | |
File: 114498-2001-A.pdf (0 kb) | Description: Proposed Drainage | Created Date: 10/10/2017 | |
File: SSA 6226-Shire Park -P06 Rev A Proposed Site Signage Locations.pdf (0 kb) | Description: Proposed Site Signage Locations | Created Date: 10/10/2017 | |
File: 114498-1810-C.pdf (0 kb) | Description: Campus Improvement Works - Minibus Tracking | Created Date: 13/10/2017 | |
File: 114498-2400-A.pdf (0 kb) | Description: External Levels - Petrol Station | Created Date: 13/10/2017 | |
File: SSA 6226-Shire Park -P07 Rev A Proposed Site Signage.pdf (0 kb) | Description: Proposed Site Signage | Created Date: 13/10/2017 | |
File: Approved Checkout Car Park Study (1617-A-6700).PDF (0 kb) | Description: NMA - Approved Checkout Car Park Study (1617 A 6700) | Created Date: 25/04/2018 | |
File: Proposed Checkout Plan (1617-A-1111).pdf (0 kb) | Description: NMA - Proposed Checkout Plan (1617 A 1111) | Created Date: 25/04/2018 | |
Site Sections | |||
File: SSA 6226-Shire Park -P08 Rev A Proposed Site Sections.pdf (0 kb) | Description: Proposed Site Sections | Created Date: 13/10/2017 | |
Design & Access Statement | |||
File: Design and Access Statement Part 1(1).pdf (0 kb) | Description: Design And Access Statement - Part 1 | Created Date: 10/10/2017 | |
File: Design and Access Statement Part 2(1).pdf (0 kb) | Description: Design And Access Statement - Part 2 | Created Date: 10/10/2017 | |
File: Design and Access Statement Part 3(1).pdf (0 kb) | Description: Design And Access Statement - Part 3 | Created Date: 10/10/2017 | |
Planning Statement | |||
File: 20171009 Planning Statement Finalpdf.pdf (0 kb) | Description: Planning Statement | Created Date: 10/10/2017 | |
Transport Statement | |||
File: Transport Note Part 2.pdf (0 kb) | Description: Transport Note Part 2 | Created Date: 10/10/2017 | |
File: Transport Note Part 1(1).pdf (0 kb) | Description: Transport Note Part 1 - Redacted | Created Date: 10/10/2017 | |
File: SSA 6226-Shire Park -P09 Proposed Site Tracking.pdf (0 kb) | Description: Proposed Site Tracking Plan | Created Date: 13/10/2017 | |
Consultee Response | |||
File: Comments.pdf (0 kb) | Description: Comment - WHBC - Client Services | Created Date: 19/10/2017 | |
File: Comments(1).pdf (0 kb) | Description: Support - Hertfordshire Constabulary | Created Date: 30/10/2017 | |
File: 127659.pdf (0 kb) | Description: Objection - Environment Agency | Created Date: 31/10/2017 | |
File: Comments(2).pdf (0 kb) | Description: Comment - Parking Services | Created Date: 31/10/2017 | |
File: Comments(3).pdf (0 kb) | Description: Comment -Public Health and Protection | Created Date: 01/11/2017 | |
File: 620172317MAJ - Tesco Stores Ltd JP.pdf (0 kb) | Description: Objection - Lead Local Flood | Created Date: 06/11/2017 | |
File: Response to Planning application from Hertfordshire County Council.pdf (0 kb) | Description: Comment - Herts Highways | Created Date: 13/11/2017 | |
File: 2317-1.pdf (0 kb) | Description: Comment - Historic Advisor | Created Date: 06/11/2017 | |
File: Comment - Environment Agency.pdf (0 kb) | Description: Comments - Environment Agency | Created Date: 08/12/2017 | |
Decision Notice PDF | |||
File: Decision Notice_620172317MAJ.pdf (0 kb) | Description: Decision Notice PDF | Created Date: 25/01/2018 | |
Officer Report PDF | |||
File: Delegated Report_620172317MAJ(2).pdf (0 kb) | Description: Officer Report | Created Date: 25/01/2018 | |
File: 2017 3217 NMA Kestrel Way.pdf (0 kb) | Description: NMA decision letter 120618 | Created Date: 12/06/2018 | |
Biodiversity Survey & Report | |||
File: Preliminary Ecological Appraisal.pdf (0 kb) | Description: Preliminary Ecological Appraisal | Created Date: 10/10/2017 | |
Flood Impact Assessment | |||
File: FRA_Part 3.pdf (0 kb) | Description: Flood Risk Assessment - Part 3 | Created Date: 10/10/2017 | |
File: FRA_Part 2.pdf (0 kb) | Description: Flood Risk Assessment - Part 2 | Created Date: 10/10/2017 | |
File: FRA_Part 1.pdf (0 kb) | Description: Flood Risk Assessment - Part 1 - Not Redacted | Created Date: 10/10/2017 | |
File: FRA_Part 1(1).pdf (0 kb) | Description: Flood Risk Assessment - Part 1 - Redacted | Created Date: 10/10/2017 | |
Site Notice | |||
File: Site Notice_620172317MAJ(1).pdf (0 kb) | Description: Site Notice | Created Date: 23/10/2017 | |
Superseded Plans | |||
File: 114498-1810-B.pdf (0 kb) | Description: Campus Improvement Works - Minibus Tracking | Created Date: 10/10/2017 | |
File: 114498-2400-.pdf (0 kb) | Description: Exernal Levels - Petrol Station | Created Date: 10/10/2017 | |
File: 114498-8004-C.PNG (0 kb) | Description: Landscape Proposal Plan | Created Date: 10/10/2017 | |
File: 114498-PL-8008.pdf (0 kb) | Description: Landscape Construction Details | Created Date: 10/10/2017 | |
File: SSA 6226-Shire Park -P08 Rev A Proposed Site Sections.pdf (0 kb) | Description: Proposed Site Sections | Created Date: 10/10/2017 | |
File: SSA 6226-Shire Park -P07 Rev A Proposed Site Signage.pdf (0 kb) | Description: Proposed Site Signage | Created Date: 10/10/2017 | |
File: SSA 6226-Shire Park -P05 Rev A Proposed Flexi PFS Elevarions.pdf (0 kb) | Description: Proposed Flexi PFS Elevations | Created Date: 10/10/2017 | |
File: SSA 6226-Shire Park -P09 Proposed Site Tracking.pdf (0 kb) | Description: Proposed Site Tracking Plan | Created Date: 10/10/2017 | |
Tree Survey | |||
File: Tree Report(1).pdf (0 kb) | Description: Tree Report - Redacted | Created Date: 10/10/2017 |
Organisation | Name | Sent | Reply Due | Reply Received |
---|---|---|---|---|
Welwyn Hatfield Borough Council | Councillor Barbara Fitzsimon | 18/10/2017 | 08/11/2017 | |
Welwyn Hatfield Borough Council | Councillor Barbara Fitzsimon | 25/01/2018 | ||
Welwyn Hatfield Borough Council | Councillor Mike Larkins | 18/10/2017 | 08/11/2017 | |
Welwyn Hatfield Borough Council | Councillor Mike Larkins | 25/01/2018 | ||
Welwyn Hatfield Borough Council | Councillor Nathaniel Chapman | 25/01/2018 | ||
Welwyn Hatfield Borough Council | Councillor Nathaniel Chapman | 18/10/2017 | 08/11/2017 | |
Hertfordshire County Council | Emma Chapman - Spatial Planning & Economy Team | 18/10/2017 | 08/11/2017 | |
Hertfordshire County Council | Emma Chapman - Spatial Planning & Economy Team | 25/01/2018 | ||
Lead Local Flood Authority | Fiona Lai | 25/01/2018 | ||
Lead Local Flood Authority | Fiona Lai | 18/10/2017 | 08/11/2017 | 06/11/2017 |
Hertfordshire Constabulary | Gerry Brophy | 25/01/2018 | ||
Hertfordshire Constabulary | Gerry Brophy | 18/10/2017 | 08/11/2017 | 30/10/2017 |
Hertfordshire County Council | Hertfordshire Transport Programmes & Strategy | 18/10/2017 | 08/11/2017 | 06/11/2017 |
Hertfordshire County Council | Hertfordshire Transport Programmes & Strategy | 25/01/2018 | ||
Hertfordshire County Council | Historic Environment Advisor | 18/10/2017 | 08/11/2017 | 06/11/2017 |
Hertfordshire County Council | Historic Environment Advisor | 25/01/2018 | ||
Welwyn Hatfield Borough Council | Landscapes Department | 18/10/2017 | 08/11/2017 | |
Welwyn Hatfield Borough Council | Landscapes Department | 25/01/2018 | ||
WHBC - Client Services | Lorraine Davis | 18/10/2017 | 08/11/2017 | 19/10/2017 |
WHBC - Client Services | Lorraine Davis | 25/01/2018 | ||
Environment Agency | Natasha Smith | 25/01/2018 | ||
Environment Agency | Natasha Smith | 18/10/2017 | 08/11/2017 | 08/12/2017 |
Thames Water, Development Control | Nicky McHugh | 18/10/2017 | 08/11/2017 | |
Thames Water, Development Control | Nicky McHugh | 25/01/2018 | ||
Welwyn Hatfield Borough Council | Parking Services | 18/10/2017 | 08/11/2017 | 31/10/2017 |
Welwyn Hatfield Borough Council | Parking Services | 25/01/2018 | ||
WHBC - Public Health and Protection | Public Health and Protection | 18/10/2017 | 08/11/2017 | 01/11/2017 |
WHBC - Public Health and Protection | Public Health and Protection | 25/01/2018 |
Address | Date Sent | Expiry Date | Date Reconsulted | Reconsult Expiry Date |
---|---|---|---|---|
105 The Vineyard Welwyn Garden City AL8 7PX | 18/10/2017 | 08/11/2017 | ||
Riverside House 3 Place Farm Wheathampstead St Albans AL4 8SB | 18/10/2017 | 08/11/2017 | ||
1 Falcon Way Welwyn Garden City AL7 1TW | 18/10/2017 | 08/11/2017 | ||
1 The Boulevard Welwyn Garden City AL7 1EL | 18/10/2017 | 08/11/2017 | ||
2 The Boulevard Welwyn Garden City AL7 1EL | 18/10/2017 | 08/11/2017 | ||
65 Digswell Rise Welwyn Garden City AL8 7PT | 18/10/2017 | 08/11/2017 | ||
67 Digswell Rise Welwyn Garden City AL8 7PT | 18/10/2017 | 08/11/2017 | ||
69 Digswell Rise Welwyn Garden City AL8 7PT | 18/10/2017 | 08/11/2017 | ||
71 Digswell Rise Welwyn Garden City AL8 7PT | 18/10/2017 | 08/11/2017 | ||
1 Lodgefield Welwyn Garden City AL7 1SD | 18/10/2017 | 08/11/2017 | ||
16 Lodgefield Welwyn Garden City AL7 1SD | 18/10/2017 | 08/11/2017 | ||
17 Lodgefield Welwyn Garden City AL7 1SD | 18/10/2017 | 08/11/2017 | ||
73 Lodgefield Welwyn Garden City AL7 1SE | 18/10/2017 | 08/11/2017 | ||
74 Lodgefield Welwyn Garden City AL7 1SE | 18/10/2017 | 08/11/2017 | ||
88 Lodgefield Welwyn Garden City AL7 1SE | 18/10/2017 | 08/11/2017 | ||
95 The Vineyard Welwyn Garden City AL8 7PX | 18/10/2017 | 08/11/2017 | ||
97 The Vineyard Welwyn Garden City AL8 7PX | 18/10/2017 | 08/11/2017 | ||
99 The Vineyard Welwyn Garden City AL8 7PX | 18/10/2017 | 08/11/2017 | ||
101 The Vineyard Welwyn Garden City AL8 7PX | 18/10/2017 | 08/11/2017 | ||
103 The Vineyard Welwyn Garden City AL8 7PX | 18/10/2017 | 08/11/2017 | ||
107 The Vineyard Welwyn Garden City AL8 7PX | 18/10/2017 | 08/11/2017 | ||
109 The Vineyard Welwyn Garden City AL8 7PX | 18/10/2017 | 08/11/2017 | ||
111 The Vineyard Welwyn Garden City AL8 7PX | 18/10/2017 | 08/11/2017 | ||
113 The Vineyard Welwyn Garden City AL8 7PX | 18/10/2017 | 08/11/2017 | ||
115 The Vineyard Welwyn Garden City AL8 7PX | 18/10/2017 | 08/11/2017 | ||
117 The Vineyard Welwyn Garden City AL8 7PX | 18/10/2017 | 08/11/2017 | ||
119 The Vineyard Welwyn Garden City AL8 7PX | 18/10/2017 | 08/11/2017 | ||
121 The Vineyard Welwyn Garden City AL8 7PX | 18/10/2017 | 08/11/2017 | ||
123 The Vineyard Welwyn Garden City AL8 7PX | 18/10/2017 | 08/11/2017 | ||
125 The Vineyard Welwyn Garden City AL8 7PX | 18/10/2017 | 08/11/2017 | ||
127 The Vineyard Welwyn Garden City AL8 7PX | 18/10/2017 | 08/11/2017 | ||
129 The Vineyard Welwyn Garden City AL8 7PX | 18/10/2017 | 08/11/2017 | ||
131 The Vineyard Welwyn Garden City AL8 7PX | 18/10/2017 | 08/11/2017 | ||
133 The Vineyard Welwyn Garden City AL8 7PX | 18/10/2017 | 08/11/2017 | ||
135 The Vineyard Welwyn Garden City AL8 7PX | 18/10/2017 | 08/11/2017 | ||
137 The Vineyard Welwyn Garden City AL8 7PX | 18/10/2017 | 08/11/2017 | ||
139 The Vineyard Welwyn Garden City AL8 7PX | 18/10/2017 | 08/11/2017 | ||
141 The Vineyard Welwyn Garden City AL8 7PX | 18/10/2017 | 08/11/2017 | ||
143 The Vineyard Welwyn Garden City AL8 7PX | 18/10/2017 | 08/11/2017 | ||
Unit 2 Shire Park Falcon Way Welwyn Garden City AL7 1TW | 18/10/2017 | 08/11/2017 | ||
Unit 4 Shire Park Falcon Way Welwyn Garden City AL7 1TW | 18/10/2017 | 08/11/2017 | ||
Hertfordshire Constabulary Stanborough Road Welwyn Garden City AL8 6XF | ||||
Unit 3A Falcon Gate Shire Park Falcon Way Welwyn Garden City AL7 1TW | 18/10/2017 | 08/11/2017 | ||
Unit 3B Falcon Gate Shire Park Falcon Way Welwyn Garden City AL7 1TW | 18/10/2017 | 08/11/2017 | ||
6 Falcon Way Welwyn Garden City AL7 1TW | 18/10/2017 | 08/11/2017 | ||
Unit 5 Shire Park Falcon Way Welwyn Garden City AL7 1TW | 18/10/2017 | 08/11/2017 | ||
Unit 1 Falcon Gate Shire Park Falcon Way Welwyn Garden City AL7 1TW | 18/10/2017 | 08/11/2017 | ||
Unit 2 Falcon Gate Shire Park Falcon Way Welwyn Garden City AL7 1TW | 18/10/2017 | 08/11/2017 | ||
Unit 4 Falcon Gate Shire Park Falcon Way Welwyn Garden City AL7 1TW | 18/10/2017 | 08/11/2017 | ||
Cirrus A Kestrel Way Welwyn Garden City AL7 1AB | 18/10/2017 | 08/11/2017 | ||
Cirrus B Kestrel Way Welwyn Garden City AL7 1AB | 18/10/2017 | 08/11/2017 | ||
Cirrus C Kestrel Way Welwyn Garden City AL7 1AB | 18/10/2017 | 08/11/2017 | ||
Progress House Shire Park The Boulevard Welwyn Garden City AL7 1GB | 18/10/2017 | 08/11/2017 | ||
Cirrus Building 1A Shire Park Falcon Way Welwyn Garden City AL7 1GA | 18/10/2017 | 08/11/2017 | ||
Unit 1 Shire Park Falcon Way Welwyn Garden City AL7 1TW | 18/10/2017 | 08/11/2017 | ||
Second Floor Unit 1 Shire Park Falcon Way Welwyn Garden City AL7 1TW | 18/10/2017 | 08/11/2017 | ||
First Floor Unit 1 Shire Park Falcon Way Welwyn Garden City AL7 1TW | 18/10/2017 | 08/11/2017 | ||
21 Knightsfield Welwyn Garden City AL8 7JE | 18/10/2017 | 08/11/2017 | ||
23 Knightsfield Welwyn Garden City AL8 7JE | 18/10/2017 | 08/11/2017 | ||
25 Knightsfield Welwyn Garden City AL8 7JE | 18/10/2017 | 08/11/2017 | ||
27 Knightsfield Welwyn Garden City AL8 7JE | 18/10/2017 | 08/11/2017 | ||
29 Knightsfield Welwyn Garden City AL8 7JE | 18/10/2017 | 08/11/2017 | ||
31 Knightsfield Welwyn Garden City AL8 7JE | 18/10/2017 | 08/11/2017 | ||
33 Knightsfield Welwyn Garden City AL8 7JE | 18/10/2017 | 08/11/2017 | ||
Unit 1 To 2 Shire Park Falcon Way Welwyn Garden City AL7 1TN | 18/10/2017 | 08/11/2017 | ||
Creche Shire Park Falcon Way Welwyn Garden City AL7 1HD | 18/10/2017 | 08/11/2017 | ||
Ground Floor 1 The Boulevard Welwyn Garden City AL7 1EL | 18/10/2017 | 08/11/2017 | ||
First Floor 1 The Boulevard Welwyn Garden City AL7 1EL | 18/10/2017 | 08/11/2017 | ||
First Floor Part 1 The Boulevard Welwyn Garden City AL7 1EL | 18/10/2017 | 08/11/2017 | ||
First Floor Part Left Hand Side 1 The Boulevard Welwyn Garden City AL7 1EL | 18/10/2017 | 08/11/2017 | ||
First Floor Part Right Hand Side 1 The Boulevard Welwyn Garden City AL7 1EL | 18/10/2017 | 08/11/2017 | ||
First Floor And Ground Floor Part 2 The Boulevard Welwyn Garden City AL7 1EL | 18/10/2017 | 08/11/2017 | ||
Ground Floor Part 2 The Boulevard Welwyn Garden City AL7 1EL | 18/10/2017 | 08/11/2017 | ||
Front Left Hand Side 1 The Boulevard Welwyn Garden City AL7 1EL | 18/10/2017 | 08/11/2017 | ||
Second Floor Part 1 Falcon Way Welwyn Garden City AL7 1TW | 18/10/2017 | 08/11/2017 | ||
Ground Floor And First Floor 1 Falcon Way Welwyn Garden City AL7 1TW | 18/10/2017 | 08/11/2017 | ||
Unit 3 Shire Park Falcon Way Welwyn Garden City AL7 1TW | 18/10/2017 | 08/11/2017 | ||
Ground Floor Unit 4 Falcon Way Welwyn Garden City AL7 1TW | 18/10/2017 | 08/11/2017 | ||
First Floor Unit 4 Falcon Way Welwyn Garden City AL7 1TW | 18/10/2017 | 08/11/2017 | ||
First Floor Part Unit 4 Falcon Way Welwyn Garden City AL7 1TW | 18/10/2017 | 08/11/2017 | ||
Leapfrog Nurseries Kestrel Way Welwyn Garden City AL7 1TN | 18/10/2017 | 08/11/2017 |
Application Number | Proposal | Decision | Distance |
---|---|---|---|
6/2024/2213/ADV | Proposal to install 3x Fascia, 4x Aluminium panel signs | Granted | 0 |
6/2023/0343/FULL | Installation of modular building (portacabin) with access ramp for use as mailroom (for wider Tesco campus), including removal of 28 car parking spaces to accommodate building and service area. | Granted | 0 |
6/2019/3252/FULL | Erection of 'click and collect' customer collection pod and 11 bollards | Granted | 0 |
6/2019/3150/ADV | Installation of 2x externally illuminated panel signs and 2x non-illuminated panel signs onto collection pod | Granted | 0 |
6/2018/1163/ADV | Installation of 1 x illuminated and 2 x non-illuminated fascia signs | Granted | 0 |
6/2018/0560/COND | Submission of details pursuant to condition 1a (remediation strategy), 1d (verification plan), 2 (verification report), 3 (monitoring and maintenance plan), 7 (borehole management scheme), 8 (revised/additional landscaping proposals), 11 (surface water drainage scheme), 12 ((surface water drainage scheme) and 13 (external lighting) on planning permission 6/2017/2317/MAJ, dated 25/01/2018 | Not Determined | 0 |
6/2017/1912/COND | Submission of details pursuant to condition 6 (fence and floodlights), 7 (landscape proposals) and 9 (odour risk assessment) on planning permission 6/2016/0491/MAJ, dated 29/06/2016 | Part Approved / Part Refused | |
6/2017/0863/ADV | Retention of 1 x internally illuminated fascia and retention of 1 x non-illuminated floor standing sign. | Granted | 0 |
6/2016/1348/FULL | Erection of a 24sqm single storey new accommodation for the Shire Park Business Park security office. | Granted | 0 |
6/2016/1365/COND | Approval of details reserved by condition 2 (materials) and condition 3 (noise) on planning permission 6/2016/0286/FULL | Granted | 0 |
6/2016/0564/FULL | Erection of single storey accommodation for the Shire Park Business Park security office | Granted | 0 |
6/2016/0491/MAJ | Demolition of existing building and redevelopment of the site to provide a part-basement and two storey business resource centre including food test kitchens, cookery school, customer experience centre, training academy, staff welfare facilities including gym and outdoor sports facilities, ancillary uses and a local retail store (Use Class A1) together with associated car parking, landscaping and infrastructure works. | Granted | 0 |
6/2016/0319/ADV | Installation of 2no illuminated planters, 18no low on foot directional signs (free-standing), 2no tall bus stop totems, 8no illuminated car park entrance totems and 6no non-illuminated road side directional totems | Granted | 0 |
6/2016/0320/ADV | Installation of 10no fascia signs (4no high level, 6no low level) and 81no free-standing directional signs and totems | Granted | 0 |
6/2016/0286/FULL | Erection of extension at the rear of the building, to provide additional space to the existing restaurant, including a fenced plant enclosure | Granted | 0 |
6/2016/0044/TPO | Raise crowns of four Oak trees by upto 4m from ground level and 6m over highway covered by TPO 376 | Granted | 0 |
6/2015/2417/FULL | Erection of single storey entrance lobby extension | Withdrawn | 0 |
6/2015/2316/LAWP | Certificate of lawfulness for the proposed change of use for extension to rear of 3 Falcon Way for facilities of staff health & wellness (class D1)ancillary to the office use. | Granted | 0 |
6/2015/1669/PN11 | Prior approval for the change of use of three buildings from office use (Use Class B1) to 210 residential dwellings (Use Class C3). | Withdrawn | 0 |
N6/2014/1719/S73A | Variation of condition 2 (drawings) of planning permission N6/2013/1642/MA (Erection of three storey decked car park and a temporary car park adjacent to Car Park E at plotbrand to accommodate displaced parking during the construction of the new decked car park) | Approval Subject to s106 | 0 |
N6/2014/0992/NM | Non material amendmnent following approval of planning permission N6/2013/1650/FP - The relocation of the installation of 26 Solar PV cells | Granted | 0 |
N6/2013/1650/FP | Installation of 26 solar PV cells and 1 solar PV tracker following removal of 2 wind turbines | Granted | 0 |
N6/2013/1642/MA | Erection of three storey decked car park and a temporary car park adjacent to Car Park E at plotbrand to accommodate displaced parking during the construction of the new decked car park | Granted | |
N6/2012/1340/TP | Remove deadwood and damaged branches to three oaks T1, T2, T4 and grind stump of T3 covered by TPO 376 | Granted | 0 |
N6/2011/1208/FP | Erection of emergency generator enclosure and bin refuse enclosure | Granted | |
N6/2011/1211/AD | Installation of one internally illuminated fascia sign on main building and six directional signs across the site | Granted | |
N6/2010/2958/S73B | Variation of condition 2 (Time Limit) from planning permission N6/2005/0241/FP for formation of new area for car parking | Granted | |
N6/2009/2377/AD | INSTALLATION OF 3 NON-ILLUMINATED POLES SIGNS | Granted | 0 |
N6/2009/2479/TP | REMOVAL OF DEAD OAK TREE COVERED BY TPO 376 T4 | 0 | |
N6/2008/0931/FP | ERECTION OF PHOTOVOLTAK DEGER TRACKING SYSTEM FRONTING THE OFFICES | Granted | 0 |
N6/2008/0277/FP | ERECTION OF EXTENSION TO CIRRUS BUILDING CAFÉ (AMENDMENTS TO N6/2005/1047/FP) | Granted | 0 |
N6/2007/1419/FP | CHANGE OF USE OF 18 CAR PARK SPACES AND FORMATION OF PLANT/SERVICE YARD AND ERECTION OF 2.5M TIMBER FENCING | Granted | 0 |
N6/2007/1226/FP | ERECTION OF SMOKING SHELTER | Granted | 0 |
N6/2007/1085/FP | CREATION OF VEHICULAR EGRESS ONTO KNIGHTSFIELD FROM CIRRUS CAR PARK AND PARKING RESTRICTIONS | Withdrawn | 0 |
N6/2007/0969/FP | INSTALLATION OF SMOKERS SHELTERS TO MEET 1ST JULY SMOKING BAN DEADLINE IN THE SCHERING-PLOUGH CARPARK | Granted | 0 |
N6/2006/1243/FP | ERECTION OF NEW BOUNDARY FENCE | Granted | 0 |
N6/2006/1141/FP | ERECTION OF 2 NO. WIND TURBINES | Granted | 0 |
N6/2006/0504/FP | ERECTION OF 3METRE HIGH SECURITY FENCE | Refused | 0 |
N6/2005/1498/FP | ERECTION OF A 3 METER HIGH SECURITY FENCE | Refused | 0 |
N6/2005/1047/FP | CONSERVATORY EXTENSION TO EXISTING CAFETERIA | Granted | 0 |
N6/2005/0241/FP | FORMATION OF NEW AREA FOR CAR PARKING. | Approval Subject to s106 | 0 |
N6/2004/0964/FP | FORMATION OF NEW AREA FOR CAR PARKING. | Withdrawn | 0 |
N6/2003/0165/FP | INSTALLATION OF AN A.T.M. | Granted | 0 |
N6/2001/0948/FP | VARIATION OF CONDITION 1 OF N6/0430/99/FP TO EXTEND PLANNING PERMISSION FOR THE RE-DEVELOPMENT FOR B1 PURPOSES FOR A FURTHER 2 YEARS | Granted | 0 |
N6/2001/0144/FP | ERECTION OF A CANOPY TO STAFF PETROL FACILITY | Granted | 0 |
N6/2000/1451/FP | INSTALLATION OF PETROL FACILITY FOR STAFF USE | Granted | 0 |
N6/2000/0517/FP | CONSERVATORY | Granted | 0 |
N6/1998/0174/FP | Erection of 4 storey B1 office building totalling 8000sq metres floor space, car parking and landscaping (revision to planning permission N6/0928/96/FP) | Granted | 0 |
N6/1998/0161/FP | Erection of single storey building | Granted | 0 |
N6/1997/0396/FP | Provision of new diesel storage tanks, and refuse bins enclosure, and engineering works to form terrace for ancillary external area of seating | Granted | 0 |
N6/1997/0290/OP | Redevelopment for B1 use. (Renewal of previous planning permission N6/0255/94/OP) | Granted | 0 |
N6/1997/0285/FP | Proposed external alterations to building and roof, installation of generators and chillers, new car park and pedestrian walk ways. (Amended plans) | Granted | 0 |
N6/1996/0928/FP | Erection of 4 storey B1 (office) building totalling 8000sq mts floorspace, car parking and landscaping | Granted | 0 |
N6/1996/0772/FP | Extension of existing office car parking to provide a total of 700 spaces including new landscaping | Granted | 0 |
N6/1993/7018/AD | Erection of internally illuminated box signs at site entrance and on North East elevation, and erection of 9.15m flag pole | Granted | 0 |
N6/1993/7010/AD | Corporate logo and name at first floor level North West (non-illuminated) and North East (illuminated) elevations; flood lit name board at site entrance; and flag on 8.4m high flagpole | Granted | 0 |
N6/1992/0770/DE | Construction of remainder of Estate Road to serve Phase III of development of Shire Park (Approval of a reserved matter relating to Outline Permission N6/0178/92/OP) | Granted | 0 |
N6/1991/7033/AD | Erection of two illuminated signs | Granted | 0 |
N6/1991/0407/FP | Construction of a ground floor link between units 1 & 2 and alterations to car parking layout | Granted | 0 |
N6/1989/0667/FP | Re-development for B1 Business Use | Granted | 0 |
C6/1988/0657/FP | Erection of 7 units for class B1 use, with associated car parking and landscaping (Phase III) | Granted | 0 |
C6/1987/0074/DE | Details of materials and landscaping for headquarters building | Granted | 0 |
Reference Number | Description | Validated Date | Expiry Date | Reason For Change | Officer | Decision | Decision Date |
---|---|---|---|---|---|---|---|
6/2017/2317/NMA | Non-material amendment for minor kerb re-alignments and minor alterations to the layout of parking spaces and landscape planting on planning permission 6/2017/2317/MAJ, dated 25/01/2018 | 09/05/2018 | 06/06/2018 | Client request | Mr Michael Robinson | Granted | 12/06/2018 |