Return to search results   -   Start a new search   -   The consultation period for this application has now closed

Planning Application: 6/2022/2039/COND


APPROVAL OF DETAILS RESERVED BY CONDITION

Decided - Granted

Mr William Myers

w.myers@welhat.gov.uk

Northaw House Coopers Lane Northaw Potters Bar EN6 4NG

Submission of details pursuant of Condition 1 (Construction/Repair Method Statement), Condition 2 (Window and Door Details) and Condition 3 (Materials) on planning permission 6/2020/0930/VAR

527437

202419

  • Northaw and Cuffley

  • Councillor Bernard Sarson
  • Councillor George Michaelides
  • Councillor Barbara Fitzsimon

Northaw and Cuffley

100081162178
01/09/2022
01/09/2022
14/10/2022

Mr Edward Thuell

LW Developments Ltd

Unit 12 Park Farm Fornham St Genevieve Bury St Edmunds IP28 6TS

PO Box 417 Hertford SG13 PLY
Description Distance
Parish 0.00

Granted
19/05/2023
19/05/2023

Delegated

If any documents do not appear to be shown below, please email planning@welhat.gov.uk including the case number. We will endeavour to publish any missing items within 10 working days.

To download a selection of individual documents place a tick alongside each of the relevant rows and then click on Download selected files. To download all of the documents place a tick in the box alongside the header row and all of the files will be selected, then click on Download selected files. To view individual documents click on the File for the required row.

Select All File Description Date Uploaded
Application Form - Without Personal Information
ApplicationFormRedacted.pdf (0 kb) Applicationformredacted 01/09/2022
Decision Notice PDF
Conditions Response Letter_620222039COND(1)(2).pdf (0 kb) Cond Response Letter 19/05/2023
Site Notice
Site Notice_620222039COND.pdf (0 kb) Site Notice 23/09/2022
Superseded Plans
17A GF Key plan Ceiling Repairs A2.pdf (0 kb) Ground Floor Plan Ceiling Repairs 01/09/2022
18A FF Key Plan Ceiling Repairs A2.pdf (0 kb) First Floor Plan Ceiling Repairs 01/09/2022
19A SF Key Plan Ceiling Repairs A3.pdf (0 kb) Second Floor Plan Ceiling Repairs 01/09/2022
20A Basement Floor Key Plan Ceiling Repairs A3.pdf (0 kb) Basement Floor Key Plan Ceiling Repairs 01/09/2022
21A Basement Floor Key Plan Wall Repairs A3.pdf (0 kb) Basement Floor Key Plan Wall Repairs 01/09/2022
22A GF Key plan Floor Repairs A2.pdf (0 kb) Ground floor Key Plan Floor Repairs 01/09/2022
23A First Floor Key plan Wall Repairs A2.pdf (0 kb) First Floor Key Plan Wall Repairs 01/09/2022
24 Second Floor Key plan Wall Repairs A2.pdf (0 kb) Second Floor Key Plan Wall Repairs 01/09/2022
25A GF Key plan Wall Repairs A2.pdf (0 kb) Ground floor Key Plan Wall Repairs 01/09/2022
26A FF Key plan Floor Repairs A2.pdf (0 kb) First floor Key Plan Floor Repairs 01/09/2022
27A SF Key plan Floor Repairs A2 (1).pdf (0 kb) Second floor Key Plan Floor Repairs 01/09/2022
30 Roof Repair Key Plan A2.pdf (0 kb) Roof Repair Key Plan 01/09/2022
31 Northaw House Repair Elevations A1.pdf (0 kb) Northaw House Repair Elevations 01/09/2022
32 Stables Repair Elevations A1.pdf (0 kb) Stables Repair Elevations 01/09/2022
33A Basement Floor Key Plan Floor Repairs A3.pdf (0 kb) Basement Floor Key Plan Floor Repairs 01/09/2022
46 Second Floor - Construction Details Key Plan A1.pdf (0 kb) Second Floor - Construction Details 01/09/2022
42 Roofing Details A1.pdf (0 kb) Roofing Details 01/09/2022
48 Construction Details - Floor A1.pdf (0 kb) Construction Details Floor 01/09/2022
43 Basement - Construction Details Key Plan A1.pdf (0 kb) Basement Construction Details Key 01/09/2022
45 First Floor - Construction Details Key Plan A1.pdf (0 kb) First Floor Construction Details Key 01/09/2022
49 Construction Details - Walls A1.pdf (0 kb) Construction Details Walls 01/09/2022
08 Existing Door Elevations and Sections A1.pdf (0 kb) Existing Door Elevations And Sections 01/09/2022
07 Existing Window Elevations and Sections A1.pdf (0 kb) Existing Window Elevations And Sections 01/09/2022
29A Timber Frame Repairs A1.pdf (0 kb) Timber Frame Repairs 01/09/2022
47 Stables - Construction Details Key Plan A1.pdf (0 kb) Stables Construction Details Key 01/09/2022
50 Construction Details - Misc A1.pdf (0 kb) Construction Details Misc 01/09/2022
44 Ground Floor - Construction Details Key Plan A1.pdf (0 kb) Ground Floor Construction Details Key 01/09/2022
51 Basement Service Plan Layout A1.pdf (0 kb) Basement Service Plan Layout 08/09/2022
52 Ground Floor Service Plan Layout A1.pdf (0 kb) Ground Floor Service Plan Layout 08/09/2022
53 First Floor Service Plan Layout A1.pdf (0 kb) First Floor Service Plan Layout 08/09/2022
54 Second Floor Service Plan Layout A1.pdf (0 kb) Second Floor Service Plan Layout 08/09/2022
55 Stable Block Service Plan Layout A1.pdf (0 kb) Stable Block Service Plan Layout 08/09/2022
Supporting Information
43B Basement - Construction Details Key Plan A1[89].pdf (0 kb) 43B Basement - Construction Details Key Plan A1[89] 19/05/2023
44B Ground Floor - Construction Details Key Plan A1[68].pdf (0 kb) 44B Ground Floor - Construction Details Key Plan A1[68] 19/05/2023
45B First Floor - Construction Details Key Plan A1[32].pdf (0 kb) 45B First Floor - Construction Details Key Plan A1[32] 19/05/2023
46D Second Floor - Construction Details Key Plan A1.pdf (0 kb) 46D Second Floor - Construction Details Key Plan A1 19/05/2023
47A The Coach House - Construction Details Key Plan A1[68].pdf (0 kb) 47A The Coach House - Construction Details Key Plan A1[68] 19/05/2023
63 Window Details A1.pdf (0 kb) 63 Window Details A1 19/05/2023
64 Window Details A1.pdf (0 kb) 64 Window Details A1 19/05/2023
65 Door Details A1.pdf (0 kb) 65 Door Details A1 19/05/2023
66 Door Details A1.pdf (0 kb) 66 Door Details A1 19/05/2023
69 Northaw House F4 - Staircase Details A2[32].pdf (0 kb) 69 Northaw House F4 - Staircase Details A2[32] 19/05/2023
70 Northaw House F15 - Staircase Details A2[28].pdf (0 kb) 70 Northaw House F15 - Staircase Details A2[28] 19/05/2023
71 The Coach House - Staircase Details A2[6].pdf (0 kb) 71 The Coach House - Staircase Details A2[6] 19/05/2023
72 Door Details - Internal A1[9].pdf (0 kb) 72 Door Details - Internal A1[9] 19/05/2023
73 Door Details - Internal A2.pdf (0 kb) 73 Door Details - Internal A2 19/05/2023
6717 Door Schedule New Doors Rev B[55].pdf (0 kb) 6717 Door Schedule New Doors Rev B[55] 19/05/2023
6717 Door Schedule New Doors[71].pdf (0 kb) 6717 Door Schedule New Doors[71] 19/05/2023
6717 Door Schedule Rev F.pdf (0 kb) 6717 Door Schedule Rev F 19/05/2023
6717 WIndow Schedule Rev F.pdf (0 kb) 6717 WIndow Schedule Rev F 19/05/2023
Above Ground Materials -Oak cottage[74].pdf (0 kb) Above Ground Materials -Oak cottage[74] 19/05/2023
D109rD Materials Schedule .pdf (0 kb) D109rD Materials Schedule 19/05/2023
D102r2 Basement Schedule(1).pdf (0 kb) A101 Basement 23/05/2023
D103r2 Ground Floor Schedule(1).pdf (0 kb) A102 Ground Floor 23/05/2023
D104 1st Floor Schedule(1).pdf (0 kb) A103 1st Floor 23/05/2023
D105 2nd Floor Schedule(1).pdf (0 kb) A104 2nd Floor 23/05/2023
D106r1 External Works(1).pdf (0 kb) A105 Externals 23/05/2023
D122 Condition Survey for Northaw House, Ballroom Wing and The Coach House(1).pdf (0 kb) A106 The Coach House 23/05/2023
D123 Condition Survey for Oak Cottage(1).pdf (0 kb) A107 Oak Cottage 23/05/2023
A101 Basement(1).pdf (0 kb) A108 Record Documents 23/05/2023
A102 Ground Floor(1).pdf (0 kb) A109 Supporting Documents 23/05/2023
A103 1st Floor(1).pdf (0 kb) A110 Construction Details 23/05/2023
A104 2nd Floor(1).pdf (0 kb) A111 Services 23/05/2023
A105 Externals(1).pdf (0 kb) A112 Miscellaneous 23/05/2023
A106 The Coach House(1).pdf (0 kb) D101r1 General Repairs & Specification 23/05/2023
A107 Oak Cottage(1).pdf (0 kb) D102r2 Basement Schedule 23/05/2023
A108 Record Documents(1).pdf (0 kb) D103r2 Ground Floor Schedule 23/05/2023
A109 Supporting Documents(1).pdf (0 kb) D104 1st Floor Schedule 23/05/2023
A110 Construction Details(1).pdf (0 kb) D105 2nd Floor Schedule 23/05/2023
A111 Services(1).pdf (0 kb) D106r1 External Works 23/05/2023
A112 Miscellaneous(1).pdf (0 kb) D122 Condition Survey for Northaw House, Ballroom Wing and The Coach House 23/05/2023
D101r1 General Repairs & Specification(1).pdf (0 kb) D123 Condition Survey for Oak Cottage 23/05/2023
Organisation Name Sent Reply Due Reply Received
Place Services Conservation Officer 06/09/2022
Place Services Conservation Officer 06/09/2022
Place Services Conservation Officer 19/05/2023
Welwyn Hatfield Borough Council Councillor Bernard Sarson 19/05/2023
Welwyn Hatfield Borough Council Councillor Bernard Sarson 06/09/2022
Welwyn Hatfield Borough Council Councillor Bernard Sarson 06/09/2022
Welwyn Hatfield Borough Council Councillor Gail Ganney 06/09/2022
Welwyn Hatfield Borough Council Councillor Gail Ganney 06/09/2022
Welwyn Hatfield Borough Council Councillor Gail Ganney 19/05/2023
Welwyn Hatfield Borough Council Councillor George Michaelides 06/09/2022
Welwyn Hatfield Borough Council Councillor George Michaelides 06/09/2022
Welwyn Hatfield Borough Council Councillor George Michaelides 19/05/2023
Northaw & Cuffley Parish Council The Clerk 19/05/2023
Northaw & Cuffley Parish Council The Clerk 06/09/2022
Northaw & Cuffley Parish Council The Clerk 06/09/2022

There are no neighbours associated with this application

Application Number Proposal Decision Distance
6/2023/2553/VAR Variation of condition 4 (drawings and plans) on listed building consent 6/2019/0218/LB to alter the flat layouts within the basement and lower the floors to achieve greater head room Granted 0
6/2023/2560/VAR Variation of condition 25 (drawings and plans) on planning permission 6/2019/0217/MAJ to alter the flat layouts within the basement and lower the floors to achieve greater head room Withdrawn 0
6/2023/2244/LB Replacement of 6 ground floor windows within the northern elevation of Northaw House Refused 0
6/2023/1322/COND Submission of details pursuant to condition 1 (Windows and Doors ) on planning permission 6/2022/1651/LB Granted 0
6/2022/2184/COND Submission of details pursuant to condition number 19 (location, design and specification of refuse bin and recycling materials storage bins and areas to serve the residential units), on planning permission 6/2019/0217/MAJ Granted 0
6/2022/1651/LB Re-construction of demolished Walled Garden lean to store Granted 0
6/2022/1692/COND Submission of details pursuant to condition number 19 (location, design and specification of refuse bin and recycling materials storage bins and areas to serve the residential units), on planning permission 6/2019/0217/MAJ Refused 0
6/2022/1563/COND Submission of details pursuant of condition 9 (landscape and ecology) on planning permission 6/2019/0217/MAJ Granted 0
6/2022/1078/COND Submission of details pursuant of Condition 1 (Construction/Repair Method Statement), Condition 2 (Window and Door Details) and Condition 3 (Materials) on planning permission 6/2020/0930/VAR Refused 0
6/2022/0132/LB Repair, refurbishment and conversion of Northaw House to form 11 apartments (including refurbishment of existing caretaker's flat) and underground parking area, the Ballroom Wing to form 2 dwellings, the Stable Block to form 1 dwelling, refurbishment of existing dwelling at Oak Cottage, construction of 2 new Gate Lodge dwellings, 4 new dwellings on the East Drive, 3 new dwellings within the Walled Garden, 7 new dwellings within the Settlement Area, refurbishment of the Walled Garden, refurbishment of access routes and reinstatement of old route, provision of hard and soft landscaping, car parking and supporting infrastructure. Appeal Dismissed 0
6/2022/0132/LB Repair, refurbishment and conversion of Northaw House to form 11 apartments (including refurbishment of existing caretaker's flat) and underground parking area, the Ballroom Wing to form 2 dwellings, the Stable Block to form 1 dwelling, refurbishment of existing dwelling at Oak Cottage, construction of 2 new Gate Lodge dwellings, 4 new dwellings on the East Drive, 3 new dwellings within the Walled Garden, 7 new dwellings within the Settlement Area, refurbishment of the Walled Garden, refurbishment of access routes and reinstatement of old route, provision of hard and soft landscaping, car parking and supporting infrastructure. Not Determined 0
6/2021/0072/MAJ Repair, refurbishment and conversion of Northaw House to form 11 apartments (including refurbishment of existing single caretaker’s flat) and underground parking area, the Ballroom Wing to form 2 dwellings, the Stable Block to form 1 dwelling, refurbishment of existing dwelling at Oak Cottage, construction of 2 new Gate Lodge dwellings, 4 new dwellings on the East Drive, 3 new dwellings within the Walled Garden, 7 new dwellings within the Settlement Area, refurbishment of the Walled Garden, refurbishment of access routes and reinstatement of old route, provision of hard and soft landscaping, car parking and supporting infrastructure. Appeal Dismissed 0
6/2021/3423/VAR Variation of condition 1 and 2 (amendment of wording of previously approved application) and condition 4 (change list of approved drawings) on planning permission 6/2019/0218/LB Granted 0
6/2021/2882/COND Submission of details pursuant to condition 20 (details of any external street lights) and condition 21 (details of Life Times homes standard) on planning application 6/2019/0217/MAJ Granted 0
6/2021/2191/VAR Variation of condition 4 (drawing numbers), on Listed Building Consent 6/2019/0218/LB Granted 0
6/2021/2192/VAR Variation of condition 25 (drawing numbers), on planning permission 6/2019/0217/MAJ Withdrawn 0
6/2021/0071/LB Repair, refurbishment and conversion of Northaw House to form 11 apartments (including refurbishment of existing single caretaker’s flat) and underground parking area, the Ballroom Wing to form 2 dwellings, the Stable Block to form 1 dwelling, refurbishment of existing dwelling at Oak Cottage, construction of 2 new Gate Lodge dwellings, 4 new dwellings on the East Drive, 3 new dwellings within the Walled Garden, 7 new dwellings within the Settlement Area, refurbishment of the Walled Garden, refurbishment of access routes and reinstatement of old route, provision of hard and soft landscaping, car parking and supporting infrastructure. Refused 0
6/2021/0072/MAJ Repair, refurbishment and conversion of Northaw House to form 11 apartments (including refurbishment of existing single caretaker’s flat) and underground parking area, the Ballroom Wing to form 2 dwellings, the Stable Block to form 1 dwelling, refurbishment of existing dwelling at Oak Cottage, construction of 2 new Gate Lodge dwellings, 4 new dwellings on the East Drive, 3 new dwellings within the Walled Garden, 7 new dwellings within the Settlement Area, refurbishment of the Walled Garden, refurbishment of access routes and reinstatement of old route, provision of hard and soft landscaping, car parking and supporting infrastructure. Refused 0
6/2020/3439/COND Submission of details pursuant to condition 1 (surface water drainage) on planning permission 6/2019/0217/MAJ Granted 0
6/2020/2771/COND Submission of details pursuant to conditions 2B & C(remediation scheme and implementation), 7(external surfaces samples), 8(final landscape plan), 10(energy & sustainablity assessment) on planning permission 6/2019/0217/MAJ Granted 0
6/2020/1181/COND Submission of details pursuant to condition 1 (surface water drainage scheme) on planning permission 6/2019/0217/MAJ Granted 0
6/2020/1160/VAR Variation of condition 25 (approved plans and details) on planning permission 6/2019/0217/MAJ Withdrawn 0
6/2020/0964/VAR Variation of condition of 4 (approved plans) on planning permission 6/2019/0218/LB Withdrawn 0
6/2020/0930/VAR Variation of conditions 1 (construction/repair method statement) 2 (details of doors, windows, materials, construction and finishes) and condition 4 (approved plans and details) on Listed Building Consent 6/2019/0218/LB Granted
6/2020/0736/COND Submission of details pursuant to condition 1 (surface water drainage scheme) and 5 (arboricultural method statement) on planning permission 6/2019/0217/MAJ Part Approved / Part Refused 0
6/2020/0718/COND Submission of details pursuant to condition 2 (scheme of remediation) 3 (archaeological written scheme of investigation) 4 (environmental management plan for the construction period) and 6 (bat survey) on planning permission 6/2019/0217/MAJ Granted 0
6/2019/0217/MAJ Conversion of Northaw House to form 11 apartments (including refurbishment of existing single caretaker’s flat) and underground parking area, the Ballroom Wing to form 2 dwellings, the Stable Block to form 1 dwelling, refurbishment of existing dwelling at Oak Cottage, 3 dwellings within the Walled Garden, 7 dwellings within the Settlement Area, refurbishment of the Walled Garden, refurbishment of access routes and reinstatement of old route, provision of hard and soft landscaping, car parking and supporting infrastructure Granted 0
6/2019/0218/LB Conversion of Northaw House to form 11 apartments (including refurbishment of existing single caretaker’s flat) and underground parking area, the Ballroom Wing to form 2 dwellings, the Stable Block to form 1 dwelling, refurbishment of existing dwelling at Oak Cottage, 3 dwellings within the Walled Garden, 7 dwellings within the Settlement Area, refurbishment of the Walled Garden, refurbishment of access routes and reinstatement of old route, provision of hard and soft landscaping, car parking and supporting infrastructure Granted 0
S6/2013/1225/FP Change of Use from offices (Use Class B1) to residential (Use Class C3) Granted 0
S6/2004/0573/FP CONVERSION, ALTERATION AND CHANGE OF USE OF NORTHAW HOUSE TO SINGLE RESIDENTIAL UNIT, STABLE BLOCK TO 1 RESIDENTIAL UNIT, BALLROOM WING TO 3 RESIDENCES, SEVEN NEW BUILD DWELLINGS; (3 OF WHICH LIVE / WORK) EXTENSION, ALTERATIONS AND REFURBISHMENT OF OAK COTTAGE, PLUS ASSOCIATED CAR PARKING, DRIVEWAY AND ACCESS AND LANDSCAPING, INCLUDING SOME DEMOLITION Granted 0
S6/2002/0415/FP NEW BRIDGE LINK TO FIRST FLOOR Granted 0
S6/2002/0416/LB NEW BRIDGE LINK TO FIRST FLOOR, AND INTERNAL ALTERATIONS ON GROUND AND FIRST FLOOR Granted 0
S6/2001/1402/LU CERTIFICATE OF LAWFULNESS FOR THE EXISTING USE OF THE BASEMENT AND SECOND FLOOR OF NORTHAW HOUSE FOR OFFICES AND ANCILLARY STORAGE; USE OF THE DETACHED FORMER APPLESTORE AS OFFICES; NON-COMPLIANCE WITH CONDITIONS 2 AND 4 OF PLANNING PERMISSION P/493/70 FOR THE CHANGE OF USE OF NORTHAW HOUSE TO OFFICES. Granted 0
S6/2001/1322/FP CHANGE OF USE OF CARETAKERS FLAT (USE CLASS C2) TO OFFICES (USE CLASS B1) Granted 0
S6/1999/1099/FP REFURBISHMENT OF STABLE BUILDING AND CART HOUSE AS A DWELLING HOUSE AND THE CONSTRUCTION OF TWO REPLACEMENT GATE LODGES Granted 0
S6/1999/1100/LB REFURBISHMENT OF STABLE BUILDING AS A DWELLING, INCLUDING REBUILDING OF CART HOUSE TO BE INCORPORATED INTO DWELLING Granted 0
S6/1996/0905/LB Repair/replacement of bressumer to bay window on south elevation Granted 0
S6/1983/0377/ 9 m high flagpole Granted 0
S6/1980/0360/LB Demolition of five chimney stacks Granted 0
S6/1976/0427/LB Alterations and conversion of garages for use as offices Granted 0

There are no NMAs associated with this application