Return to search results - Start a new search - The consultation period for this application has now closed
Planning Application: 6/2021/2208/FULL
FULL PERMISSION
|
Decided - Granted
|
Ms Kirsty Shirley
|
k.shirley@welhat.gov.uk
|
Toolbank Gypsy Moth Avenue Hatfield Business Park Hatfield AL10 9BS
|
Installation of sliding gates to replace swing gates, installation of external window and doors to accommodate increase in internal mezzanine floor and creation of additional vehicle parking.
|
521476
|
209585
|
|
|
Hatfield
|
10091064743
|
21/07/2021
|
04/08/2021
|
|
14/09/2021
|
|
|
Mr Ray Ormiston
|
Dormole Limited
|
92 Banner Street
London
EC1Y 8JU
|
Long Reach Galleon Boulevard
Dartford
DA2 6QE
|
Description | Distance |
---|---|
Employment Area | 0.00 |
Landscape Character Area | 0.00 |
Parish | 0.00 |
Article 4 HMO Direction | 0.00 |
Cycle Paths | 17.28 |
Flood Zone Surface Water 30mm | 0.00 |
Flood Zone Surface Water 100mm | 0.00 |
Flood Zone Surface Water 100mm | 0.00 |
Flood Zone Surface Water 100mm | 0.00 |
Flood Zone Surface Water 1000mm | 0.00 |
Flood Zone Surface Water 1000mm | 0.00 |
Flood Zone Surface Water 1000mm | 0.00 |
Hatfield Aerodrome | 0.00 |
Hertfordshire Ecological Network | 0.00 |
Sand and Gravel Belt | 0.00 |
Hatfield Heritage Assesment Areas | 0.00 |
Article 4 Direction Employment Sites | 0.00 |
Granted
|
07/10/2021
|
07/10/2021
|
Delegated
|
|
If any documents do not appear to be shown below, please email planning@welhat.gov.uk including the case number. We will endeavour to publish any missing items within 10 working days.
To download a selection of individual documents place a tick alongside each of the relevant rows and then click on Download selected files. To download all of the documents place a tick in the box alongside the header row and all of the files will be selected, then click on Download selected files. To view individual documents click on the File for the required row.
Select All | File | Description | Date Uploaded |
---|---|---|---|
Application Form - Without Personal Information | |||
ApplicationFormRedacted.pdf (158 kb) | Application form redacted | 21/07/2021 | |
Block Plan | |||
DWG 02 Existing Parking Site Plan.pdf (519 kb) | Existing Parking Site Plan | 21/07/2021 | |
Rev A-DWG 03 Proposed Parking Site Plan.pdf (609 kb) | Proposed Parking Site Plan | 23/09/2021 | |
Elevation and Floor Plans | |||
DWG 08 Existing and Proposed Gate Elevations.pdf (717 kb) | Existing and Proposed Gate Elevations | 04/08/2021 | |
Elevations | |||
DWG 07 Existing and Proposed Elevations.pdf (306 kb) | Existing And Proposed Elevations | 21/07/2021 | |
Floor Plans | |||
DWG 05 Proposed Floor Plans.pdf (680 kb) | Proposed Floor Plans | 21/07/2021 | |
DWG 06 Existing and Proposed Floor Plans.pdf (367 kb) | Existing And Proposed Floor Plans | 21/07/2021 | |
DWG 04 Existing Floor Plans Rev A.pdf (623 kb) | Existing Floor Plans | 04/08/2021 | |
Location Plan | |||
DWG 01 Hatfield Site Location Plan.pdf (345 kb) | Location Plan | 21/07/2021 | |
Design & Access Statement | |||
Toolbank Hatfield Planning Design Access Statement MASTER.pdf (170 kb) | Design and Access Statement | 21/07/2021 | |
Consultee Response | |||
Comments.pdf (74 kb) | Parking Services - Welwyn Hatfield Borough Council | 31/08/2021 | |
WK126347 - Toolbank.pdf (69 kb) | WK126347 - Toolbank.pdf | 08/09/2021 | |
Comments(1).pdf (75 kb) | Public Health and Protection - WHBC - Public Health and Protection | 08/09/2021 | |
WK126965 - Toolbank Amendments.pdf (67 kb) | No objection - Public Health & Protection- attachment | 24/09/2021 | |
Comments(2).pdf (75 kb) | No objection- WHBC - Public Health and Protection | 24/09/2021 | |
Response_6-2021-2208-FULL.pdf (79 kb) | HCC Highways response | 06/10/2021 | |
Photographs | |||
IMG_1139.jpg (3607 kb) | Existing gate 01 | 04/08/2021 | |
IMG_1140.jpg (3558 kb) | Existing gate 02 | 04/08/2021 | |
Decision Notice PDF | |||
Decision Notice_620212208FULL.pdf (533 kb) | Decision Notice PDF | 07/10/2021 | |
Officer Report PDF | |||
Delegated Report_620212208FULL(2).pdf (31 kb) | Delegated Report | 07/10/2021 | |
Superseded Plans | |||
DWG 03 Proposed Parking Site Plan.pdf (504 kb) | Proposed Parking Site Plan | 21/07/2021 | |
DWG 04 Existing Floor Plans.pdf (623 kb) | Existing Floor Plans | 21/07/2021 | |
Supporting Information | |||
EV Charger Point.pdf (740 kb) | EV Charger Point | 23/09/2021 |
Organisation | Name | Sent | Reply Due | Reply Received |
---|---|---|---|---|
HCC Water Officer | Catherine Gilbert | 23/08/2021 | 13/09/2021 | |
HCC Water Officer | Catherine Gilbert | 23/09/2021 | 03/10/2021 | |
HCC Water Officer | Catherine Gilbert | 07/10/2021 | ||
Welwyn Hatfield Borough Council | Councillor Drew Richardson | 07/10/2021 | ||
Welwyn Hatfield Borough Council | Councillor Drew Richardson | 23/09/2021 | 03/10/2021 | |
Welwyn Hatfield Borough Council | Councillor Drew Richardson | 23/08/2021 | 13/09/2021 | |
Welwyn Hatfield Borough Council | Councillor Duncan Bell | 23/08/2021 | 13/09/2021 | |
Welwyn Hatfield Borough Council | Councillor Duncan Bell | 23/09/2021 | 03/10/2021 | |
Welwyn Hatfield Borough Council | Councillor Duncan Bell | 07/10/2021 | ||
Welwyn Hatfield Borough Council | Councillor Samuel Kasumu | 23/09/2021 | 03/10/2021 | |
Welwyn Hatfield Borough Council | Councillor Samuel Kasumu | 07/10/2021 | ||
Welwyn Hatfield Borough Council | Councillor Samuel Kasumu | 23/08/2021 | 13/09/2021 | |
Welwyn Hatfield Borough Council | Economic Development | 23/08/2021 | 13/09/2021 | |
Welwyn Hatfield Borough Council | Economic Development | 23/09/2021 | 03/10/2021 | |
Welwyn Hatfield Borough Council | Economic Development | 07/10/2021 | ||
Hertfordshire County Council | Hertfordshire Transport Programmes & Strategy | 23/09/2021 | 03/10/2021 | 05/10/2021 |
Hatfield Town Council | Jonah Anthony | 23/09/2021 | 03/10/2021 | |
Hatfield Town Council | Jonah Anthony | 23/08/2021 | 13/09/2021 | |
Hatfield Town Council | Jonah Anthony | 07/10/2021 | ||
Welwyn Hatfield Borough Council | Landscapes Department | 07/10/2021 | ||
Welwyn Hatfield Borough Council | Landscapes Department | 23/08/2021 | 13/09/2021 | |
Welwyn Hatfield Borough Council | Landscapes Department | 23/09/2021 | 03/10/2021 | |
WHBC - Client Services | Lorraine Davis | 23/09/2021 | 03/10/2021 | |
WHBC - Client Services | Lorraine Davis | 23/08/2021 | 13/09/2021 | |
WHBC - Client Services | Lorraine Davis | 07/10/2021 | ||
Welwyn Hatfield Borough Council | Parking Services | 07/10/2021 | ||
Welwyn Hatfield Borough Council | Parking Services | 23/08/2021 | 13/09/2021 | 31/08/2021 |
Welwyn Hatfield Borough Council | Parking Services | 23/09/2021 | 03/10/2021 | |
WHBC - Public Health and Protection | Public Health and Protection | 23/09/2021 | 03/10/2021 | 24/09/2021 |
WHBC - Public Health and Protection | Public Health and Protection | 23/08/2021 | 13/09/2021 | 08/09/2021 |
WHBC - Public Health and Protection | Public Health and Protection | 07/10/2021 |
Address | Date Sent | Expiry Date | Date Reconsulted | Reconsult Expiry Date |
---|---|---|---|---|
University Bus Garage Gypsy Moth Avenue Hatfield AL10 9BS | 23/08/2021 | 14/09/2021 | 23/09/2021 | 03/10/2021 |
D H L Gypsy Moth Avenue Hatfield AL10 9BD | 23/08/2021 | 14/09/2021 | 23/09/2021 | 03/10/2021 |
Building 4000 Mosquito Way Hatfield AL10 9US | 23/08/2021 | 14/09/2021 | 23/09/2021 | 03/10/2021 |
Application Number | Proposal | Decision | Distance |
---|---|---|---|
6/2024/0959/PN24 | Installation of 214 x 435w solar PV panels to the roof of the building | Prior Approval Required and Granted | 0 |
6/2022/2759/FULL | Erection of two industrial units for light industrial processes (E(g)(iii)) / general industrial (B2) / storage & distribution purposes (B8) and ancillary office space, with associated parking, access and supporting infrastructure | Granted | 0 |
6/2018/3255/FULL | Erection of a pre-delivery inspection facility (Use Class B2), together with car storage area (Use Class B8), staff car parking, cycle parking, boundary treatment, landscaping, lighting and access | Granted | 0 |
6/2018/2946/FULL | Erection of temporary secure vehicular storage area with associated security fencing | Granted | 1 |
6/2015/2043/OUTLINE | Redevelopment to provide floorspace equivalent to 537 Units of Development (UD) (as set out in Schedule 1) for Use Classes B1, B2, SG and Hotel use on plots 4100, 5000, 5600 and for Use Classes B1, SG and Hotel use on plot 6000 with all matters reserved except access | Granted | 1 |
S6/2014/0125/AD | Installation of fascia signs and directional signs | Granted | 0 |
S6/2013/1184/FP | Erection of a warehouse (use class B8), totalling 3768 square metres including ancillary office accommodation with car parking, lorry manoeuvring areas, loading and unloading facilities, cycle parking, boundary treatment, landscaping, lighting and access | Approval Subject to s106 | 0 |
S6/2005/0872/FP | Variation of Condition 2 Attached to Outline Planning Permission S6/1999/1064/OP to Allow an Additional 5 Years for Submission of Reserved Matters (Up to 29/12/2015) | Granted | 0 |
S6/2002/0359/AD | NON-ILLUMINATED FASCIA SIGN | Granted | 0 |
S6/2001/1591/DE | NEW BUS GARAGE, COMPRISING BUS PARKING AREA AND SERVICE YARD, WORKSHOP AND ANCILLARY OFFICES AND ASSOCIATED CAR PARKING (RESERVED MATTERS FOLLOWING OUTLINE PERMISSION S6/1999/1064/OP) | Granted | 0 |
S6/2001/0217/DE | CONSTRUCTION OF SPINE ROAD (PHASE 2) AND HIGHWAY WORKS TOGETHER WITH ASSOCIATED SERVICES | Granted | 0 |
S6/2000/1307/DE | ERECTION OF A DISTRIBUTION BUILDING (CLASS B8), TOGETHER WITH ASSOCIATED PARKING, SERVICE YARDS AND LANDSCAPING | Granted | 0 |
S6/1999/1064/OP | DEMOLITION OF EXISTING (UNLISTED) BUILDINGS, REMOVAL OF RUNWAY AND OTHER HARD STANDING AREAS AND REDEVELOPMENT FOR THE FOLLOWING PURPOSES: AS A BUSINESS PARK COMPRISING USES WITHIN USE CLASS B1, B2, B8 AND SUI GENERIS USE; HOUSING; NEW UNIVERSITY CAMPUS (USE CLASS D1 AND D2) TO INCLUDE REPLACEMENT DE HAVILLAND SPORTS AND SOCIAL CLUB AND ASSOCIATED PLAYING FIELDS; TWO HOTELS; PRIMARY SCHOOL AND ASSOCIATED FACILITIES; DISTRICT CENTRE; WORKS OF CONVERSION TO ENABLE RECREATION USE OF EXISTING LISTED HANGAR; AVIATION HERITAGE CENTRE. TOGETHER WITH ASSOCIATED HIGHWAY, TRANSPORT AND SERVICE INFRASTRUCTURE (INCLUDING A STRATEGIC TRANSPORT CORRIDOR), LANDSCAPING AND OPEN SPACE, DIVERSION OF ELLENBROOK. MEANS OF ACCESS TO BE DETERMINED | Approval Subject to s106 | 0 |
S6/1991/0274/FP | Siting of jack-leg portakabin to provide office accommodation | Granted | 0 |
There are no NMAs associated with this application