Return to search results - Start a new search - The consultation period for this application has now closed
Planning Application: 6/2018/2726/MAJ
MAJOR DEVELOPMENT
|
Decided - Granted
|
Mrs Sarah Smith
|
s.smith@welhat.gov.uk
|
The Holdings, Cole Green Lane, Welwyn Garden City AL7 4AL
|
Erection of 4 industrial/commercial buildings within use class B8 with associated landscaping, access and infrastructure works
|
526576
|
211697
|
|
|
|
10091064873
|
17/10/2018
|
05/11/2018
|
28/11/2018
|
|
29/11/2018
|
|
Mr D Caruso
|
Mr K Alder-Barber
|
Durrants House
Durrants Road
Berkhamsted
HP4 3PG
|
Third Floor
Stirling House
Langston Road
Loughton
IG10 3TS
|
Description | Distance |
---|---|
Green Belt | 0.00 |
Landscape Character Area | 0.00 |
Parish | 0.85 |
Rights of Way | 42.43 |
Adjoining Local Authorities | 2.15 |
Cycle Paths | 1.53 |
Cycle Paths | 15.36 |
Flood Zone Surface Water 30mm | 0.00 |
Flood Zone Surface Water 100mm | 0.00 |
Flood Zone Surface Water 100mm | 0.00 |
Flood Zone Surface Water 100mm | 0.00 |
Flood Zone Surface Water 1000mm | 0.00 |
Flood Zone Surface Water 1000mm | 0.00 |
Flood Zone Surface Water 1000mm | 0.00 |
Flood Zone Surface Water 1000mm | 0.00 |
Hertfordshire Ecological Network | 0.00 |
Hertfordshire Ecological Network | 0.00 |
Sand and Gravel Belt | 0.00 |
Granted
|
26/06/2019
|
26/06/2019
|
Committee
|
28/03/2019
|
If any documents do not appear to be shown below, please email planning@welhat.gov.uk including the case number. We will endeavour to publish any missing items within 10 working days.
To download a selection of individual documents place a tick alongside each of the relevant rows and then click on Download selected files. To download all of the documents place a tick in the box alongside the header row and all of the files will be selected, then click on Download selected files. To view individual documents click on the File for the required row.
Organisation | Name | Sent | Reply Due | Reply Received |
---|---|---|---|---|
Herts & Middlesex Wildlife Trust | 07/11/2018 | 28/11/2018 | ||
Welwyn Garden City Chamber of Trade | 07/11/2018 | 28/11/2018 | ||
Herts & Middlesex Wildlife Trust | 20/03/2019 | |||
Welwyn Garden City Chamber of Trade | 20/03/2019 | |||
Herts & Middlesex Wildlife Trust | 26/06/2019 | |||
Welwyn Garden City Chamber of Trade | 26/06/2019 | |||
CPRE Hertfordshire | Chris Berry | 26/06/2019 | ||
CPRE Hertfordshire | Chris Berry | 20/03/2019 | ||
CPRE Hertfordshire | Chris Berry | 28/11/2018 | ||
Welwyn Hatfield Borough Council | Councillor Alan Chesterman | 06/11/2018 | 27/11/2018 | |
Welwyn Hatfield Borough Council | Councillor Alan Chesterman | 20/03/2019 | ||
Welwyn Hatfield Borough Council | Councillor Alan Chesterman | 26/06/2019 | ||
Welwyn Hatfield Borough Council | Councillor Jill Weston | 20/03/2019 | ||
Welwyn Hatfield Borough Council | Councillor Jill Weston | 06/11/2018 | 27/11/2018 | |
Welwyn Hatfield Borough Council | Councillor Jill Weston | 26/06/2019 | ||
Welwyn Hatfield Borough Council | Councillor Max Holloway | 26/06/2019 | ||
Welwyn Hatfield Borough Council | Councillor Max Holloway | 06/11/2018 | 27/11/2018 | |
Welwyn Hatfield Borough Council | Councillor Max Holloway | 20/03/2019 | ||
Hertfordshire County Council - S106 Obligations | Denise Headland | 26/06/2019 | ||
Hertfordshire County Council - S106 Obligations | Denise Headland | 07/11/2018 | 28/11/2018 | 12/11/2018 |
Hertfordshire County Council - S106 Obligations | Denise Headland | 20/03/2019 | ||
East Herts Council | Director of Planning | 20/03/2019 | 27/03/2019 | |
East Herts Council | Director of Planning | 07/11/2018 | 28/11/2018 | 02/04/2019 |
East Herts Council | Director of Planning | 26/06/2019 | ||
Lead Local Flood Authority | Fiona Lai | 26/06/2019 | ||
Lead Local Flood Authority | Fiona Lai | 07/11/2018 | 28/11/2018 | 21/11/2018 |
Lead Local Flood Authority | Fiona Lai | 20/03/2019 | ||
Hertfordshire Constabulary | Gerry Brophy | 20/03/2019 | ||
Hertfordshire Constabulary | Gerry Brophy | 07/11/2018 | 28/11/2018 | 19/11/2018 |
Hertfordshire Constabulary | Gerry Brophy | 26/06/2019 | ||
Hertfordshire County Council | Hertfordshire Transport Programmes & Strategy | 20/03/2019 | ||
Hertfordshire County Council | Hertfordshire Transport Programmes & Strategy | 26/06/2019 | ||
Hertfordshire County Council | Hertfordshire Transport Programmes & Strategy | 06/11/2018 | 27/11/2018 | 11/12/2018 |
Hertfordshire County Council | Hertfordshire Transport Programmes & Strategy | 09/01/2019 | 19/01/2019 | 23/01/2019 |
Hertfordshire County Council | Historic Environment Advisor | 07/11/2018 | 28/11/2018 | 27/11/2018 |
Hertfordshire County Council | Historic Environment Advisor | 26/06/2019 | ||
Hertfordshire County Council | Historic Environment Advisor | 20/03/2019 | ||
Welwyn Hatfield Borough Council | Landscapes Department | 20/03/2019 | ||
Welwyn Hatfield Borough Council | Landscapes Department | 06/11/2018 | 27/11/2018 | |
Welwyn Hatfield Borough Council | Landscapes Department | 26/06/2019 | ||
WHBC - Client Services | Lorraine Davis | 06/11/2018 | 27/11/2018 | |
WHBC - Client Services | Lorraine Davis | 20/03/2019 | ||
WHBC - Client Services | Lorraine Davis | 26/06/2019 | ||
Hertfordshire Ecology | Martin Hicks | 26/06/2019 | ||
Hertfordshire Ecology | Martin Hicks | 20/03/2019 | ||
Hertfordshire Ecology | Martin Hicks | 07/11/2018 | 28/11/2018 | |
Welwyn Hatfield Access Group | Mr B Wilson | 07/11/2018 | 28/11/2018 | |
Welwyn Hatfield Access Group | Mr B Wilson | 20/03/2019 | ||
Welwyn Hatfield Access Group | Mr B Wilson | 26/06/2019 | ||
Cadent Gas Limited | Mr S Carter | 20/03/2019 | ||
Cadent Gas Limited | Mr S Carter | 07/11/2018 | 28/11/2018 | |
Cadent Gas Limited | Mr S Carter | 26/06/2019 | ||
Environment Agency | Natasha Smith | 20/03/2019 | ||
Environment Agency | Natasha Smith | 07/11/2018 | 28/11/2018 | 25/03/2019 |
Environment Agency | Natasha Smith | 26/06/2019 | ||
Thames Water, Development Control | Nicky McHugh | 26/06/2019 | ||
Thames Water, Development Control | Nicky McHugh | 07/11/2018 | 28/11/2018 | 21/11/2018 |
Thames Water, Development Control | Nicky McHugh | 20/03/2019 | ||
Welwyn Hatfield Borough Council | Parking Services | 20/03/2019 | ||
Welwyn Hatfield Borough Council | Parking Services | 06/11/2018 | 27/11/2018 | |
Welwyn Hatfield Borough Council | Parking Services | 26/06/2019 | ||
Welwyn Hatfield Borough Council | Planning Policy | 07/11/2018 | 28/11/2018 | |
Welwyn Hatfield Borough Council | Planning Policy | 20/03/2019 | ||
Welwyn Hatfield Borough Council | Planning Policy | 26/06/2019 | ||
Affinity Water Ltd | Planning Team | 26/06/2019 | ||
Affinity Water Ltd | Planning Team | 20/03/2019 | ||
Affinity Water Ltd | Planning Team | 07/11/2018 | 28/11/2018 | |
WHBC - Public Health and Protection | Public Health and Protection | 06/11/2018 | 27/11/2018 | 28/11/2018 |
WHBC - Public Health and Protection | Public Health and Protection | 20/03/2019 | ||
WHBC - Public Health and Protection | Public Health and Protection | 26/06/2019 |
Address | Date Sent | Expiry Date | Date Reconsulted | Reconsult Expiry Date |
---|---|---|---|---|
50 North Thirteenth Street Central Milton Keynes MK9 3BP |
Application Number | Proposal | Decision | Distance |
---|---|---|---|
6/2023/0334/FULL | Proposed extension and installation of additional external doors | Refused | 0 |
6/2022/2424/FULL | External additions for operational purposes - external recycling area. | Refused | 0 |
6/2022/2195/FULL | Use of units 3 and 4 of the industrial / commercial buildings as Class B2, E(g)(iii) and B8 uses | Granted | 0 |
6/2022/2040/FULL | Installation of wall louvres and extraction flues to a unit constructed following the grant of planning permission ref: 6/2019/1851/VAR. | Granted | 0 |
6/2022/2054/VAR | Variation of condition 18 on application ref: 6/2019/1851/VAR | Withdrawn | 0 |
6/2022/1908/FULL | External canopy and recycling area in connection with operational purposes. | Refused | 0 |
6/2022/1395/OUTLINE | Outline planning application with all Matters reserved except Access (apart from internal circulation) for the Proposed Development as shown on the Parameter Plan, Land Use Budget, Access Arrangements Plans and Mineral Extraction Plans, comprising: 2,650 new homes; sites for two primary schools and one secondary school, including associated sports facilities; two mixed use local centres, which could include land uses within the following Use Classes: C1 (hotels); C2 (residential institutions); C3 (dwellinghouses); E (commercial, business and service); F1 (learning and non-residential institutions); and F2 (local community); a gypsy/traveller site, accommodating 15 pitches; a network of green infrastructure complementing that in the site’s environs and including extensive informal open space, as well as allotments / community orchards and play areas; vehicular access via the A414, B195 and Cole Green Lane, including the re-alignment of the B195; internal roads, footpaths, cycleways and bridleways; sustainable drainage and utilities infrastructure, including drainage basins, foul water pumping stations and electricity sub-stations; prior extraction of circa 162,000 tonnes of sands and gravels from that part of the site to the north of public footpath Hertingfordbury 023 and to the west of Birchall Wood; and management and control of the historic landfill in the central part of the site, including measures to ensure the safety of site users. | 0 | |
6/2021/3547/COND | Submission of details pursuant to condition 2 (contamination remediation scheme) on planning permission 6/2019/1851/VAR | Granted | 0 |
6/2021/2983/COND | Submission of details pursuant to condition 8 (SuDS features and drainage network) attached to planning application 6/2019/1851/VAR (a variation of application ref: 6/2018/2726/MAJ) | Granted | 0 |
6/2021/2840/COND | Submission of details pursuant to condition 3 (surface water drainage) on planning permission 6/2019/1851/VAR | Granted | 0 |
6/2021/2107/COND | Submission of details pursuant to condition 12 (schemes for signs), on planning permission 6/2019/1851/VAR | Granted | 0 |
6/2021/1837/COND | Submission of details pursuant to condition number 16 (external lighting) on planning permission 6/2019/1851/VAR | Granted | 0 |
6/2021/1650/COND | Submission of details pursuant to condition number 19 (acoustic fencing), on planning permission 6/2019/1851/VAR | Granted | 0 |
6/2020/3009/COND | Submission of details pursuant to condition 7 (external materials) on planning permission 6/2019/1851/VAR | Granted | 0 |
6/2020/2631/VAR | Variation of condition 18 of planning application ref: 6/2019/1851/VAR (Removal of conditions 19 (hours of operation of machinery) and 20 (times of deliveries) on planning permission 6/2018/2726/MAJ) in order to use the entire site for B2/B8 Class only. | Withdrawn | 0 |
6/2020/1905/VAR | Variation of condition number 23 (Approved Plans) of planning permission 6/2019/1851/VAR | Withdrawn | 0 |
6/2020/2274/COND | Submission of details pursuant to condition 2 (contamination remediation scheme) on planning permission 6/2019/1851/VAR | Granted | 0 |
6/2020/0901/COND | Submission of details pursuant to conditions 3 (Flood Risk Assessment), 4 (Surface Water Drainage Scheme), 6 (Demolition of Buildings) and 19 (Acoustic Fence) on planning permission 6/2019/1851/VAR, dated 09/01/2020 | Withdrawn | 0 |
6/2020/0871/COND | Submission of details pursuant to condition 14 (details of penetrative groundworks methods) on planning permission 6/2019/1851/VAR | Granted | 0 |
6/2019/1851/VAR | Removal of conditions 19 (hours of operation of machinery) and 20 (times of deliveries) on planning permission 6/2018/2726/MAJ | Granted | |
691 (2017) | for the continued amenity of the land. | 0 | |
6/2015/2416/MAJ | Proposed two storey office (B1a) use and general industrial (B2) use and storage and distribution (B8) use on former equestrian land as permitted and commenced under planning permission N6/1993/0244/OP | Granted | 0 |
N6/2012/2261/CD | Variation of condition 4 (Time Limit for Completion), 5 (Limit of Operations), 6 (Landscaping) and 13 (Phased restorations plan) of planning permission 3/1974-07 | Refused | 1 |
N6/2012/2035/CD | Variation of condition 4C (Time Limit for Completion) of planning permission 3/1974-07 | Objection | 0 |
2011/0361 | Change Of Use - storage of skips | Closed | 0 |
N6/2007/1391/CD | SECTION 73 APPLICATION FOR THE DELETION OF CONDITION 10 WITH PROPOSED REWORDING TO ENABLE MAINTENANCE WORKING BETWEEN 13:00 AND 17:00 ON SATURDAYS | 0 | |
N6/2005/1021/CD | PROPOSED INERT WASTE RECYCLING OPERATION TO PRODUCE SECONDARY AGGREGATES AND SOILS FOR EXPORATION, INCORPORATING RECLAMATION OF EXISTING DERELICT LAND | Granted | 0 |
N6/2003/1078/FP | GARDEN CENTRE TO INCLUDE INDOOR AND OUTDOOR SALES AREA, CAFÉ, STORAGE AREA, CAR PARKING, SERVICING AND LANDSCAPING | Deemed Refusal | 0 |
N6/1996/0562/FP | Erection of a detached house and double garage | Granted | 0 |
N6/1996/0496/DE | Application for approval of the reserved matters relating solely to landscaping, in connection with outline planning permission N6/0244/93/OP | Granted | 0 |
N6/1995/0554/FP | Construction of new access road and additional fencing | Withdrawn | 0 |
N6/1995/0393/DE | Equestrian centre with club facilities. (Approval of reserved matters covering siting, layout, design, external appearance and means of access) (Excluding staff house and garage) | Granted | 0 |
N6/1995/0694/DE | The compaction and capping of the site with clay, including alterations to the existing ground levels, to form new ground levels in preperation for the commencement of the development granted ouline permission under Ref: | Granted | 0 |
N6/1993/0244/FP | Renewal of outline planning permission for Equestrian centre with club facilities, staff house and garage | Granted | 0 |
N6/1991/0406/FP | Deposit of waste materials to raise levels of land | Granted | 0 |
N6/1990/0846/FP | Deposit of waste materials to raise levels of land | Withdrawn | 0 |
C6/1988/0102/OP | Site for Equestrian Centre, with club facilities, staff house and garage | Approval Subject to s106 | 0 |
C6/1985/0651/FP | Application to extend landfill operations and amend the contours | Refused | 0 |
S6/1984/0460/ | Raise the height by 3 metres of part of the existing landfill site and carry out a comprehensive restoration scheme | Granted | 0 |
N6/1978/0042/ | Excavation of sand and restoration using putrescible and non-putrescible fill to agricultural use | Granted | 1 |
1997/0191 | Material change of use of the land from land used for the importation and deposit of waste materials to raise the existing land levels in accordance with planning permissions reference numbers 6/0406-91 and 3/0815-91, to land used for a mixed use of both the importation and deposit of waste materials to raise the existing land levles and a recycling operation without the benefit of planning permission. The recycling operation refered to throughout this notice means the importation, crushing, grading, screening and sorting of inert waste materials(including soils, bricks and concrete) together with the storage, distribution and exportation of unprocessed and processed inert materialUsing waste materials to raise land levels | Closed | 0 |
2000/0212 | Material change in the use of the Land from the use as agriculture and the importation and deposit of waste materials to raise the existing land levels (in accordance with the planning permissions reference numbers 3/0815-91 and 6/0406-91), to a mixed use for both agriculture, the importation and deposit of waste materials to raise the existing land levels (in accordance with planning permission reference numbers 3/0815-91 and 6/0406-91) and a waste transfer station without the benefit of planning permission. The term 'waste transfer station' throughout this notice means the importation of assorted waste to the site, the storage of this waste, its sorting and processing, and its ultimate exportation from the site, and skip hire and skip storage | Notice complied with | 0 |
1996/0231 | Deposit of waste which includes timber, plastic and rubble | Closed | 0 |
Reference Number | Description | Validated Date | Expiry Date | Reason For Change | Officer | Decision | Decision Date |
---|---|---|---|---|---|---|---|
6/2018/2726/NMA | Non material amendment for splitting of 1no building into 2, retaining same overall footprint size on planning permission 6/2018/2726/MAJ | 02/11/2020 | 30/11/2020 | Splitting 1no building into 2no buildings to comply with Part B of building regs. | Mrs Sarah Madyausiku | Granted | 10/11/2020 |