Return to search results   -   Start a new search   -   The consultation period for this application has now closed

Planning Application: N6/1997/0102/CD


COUNTY COUNCIL CONS

Decided



Burnside Hertford Road Hatfield AL9 5RB

Application for a waste recycling and reclamation centre, by change of use from existing contractor's yard and existing crushing of concrete and screening of soil



  • Hatfield East

  • Councillor Larry Crofton
  • Councillor Cathy Watson
  • Councillor Shirley Asare

Essendon

200003858856
01/01/1997
10/02/1997

Prospect Planning, FAO Mr M Ledger,

Bedwell Park Limited,

7 Huntingdon Road Stevenage

Bedwell Avenue Hatfield

There are no constraints associated with this application


Objection
28/08/1997
28/08/1997

Delegated

There are no documents associated with this application

There are no consultees associated with this application

There are no neighbours associated with this application

Application Number Proposal Decision Distance
6/2023/2494/FULL Erection of an ancillary storage shed to protect the waste-related HGVs currently stored on concrete slab 0
6/2022/1395/OUTLINE Outline planning application with all Matters reserved except Access (apart from internal circulation) for the Proposed Development as shown on the Parameter Plan, Land Use Budget, Access Arrangements Plans and Mineral Extraction Plans, comprising: 2,650 new homes; sites for two primary schools and one secondary school, including associated sports facilities; two mixed use local centres, which could include land uses within the following Use Classes: C1 (hotels); C2 (residential institutions); C3 (dwellinghouses); E (commercial, business and service); F1 (learning and non-residential institutions); and F2 (local community); a gypsy/traveller site, accommodating 15 pitches; a network of green infrastructure complementing that in the site’s environs and including extensive informal open space, as well as allotments / community orchards and play areas; vehicular access via the A414, B195 and Cole Green Lane, including the re-alignment of the B195; internal roads, footpaths, cycleways and bridleways; sustainable drainage and utilities infrastructure, including drainage basins, foul water pumping stations and electricity sub-stations; prior extraction of circa 162,000 tonnes of sands and gravels from that part of the site to the north of public footpath Hertingfordbury 023 and to the west of Birchall Wood; and management and control of the historic landfill in the central part of the site, including measures to ensure the safety of site users. 0
6/2017/2882/FULL Erection of a side extension for use as a biomass boiler house (retrospective) Withdrawn 0
N6/2008/0734/CD APPLICATION FOR USE OF LAND FOR RECYCLING OF BUILDERS WASTE AND CONCRETE BATCHING, CHANGE OF USE OF EXISTING HOUSE FOR USE AS COMPANY OFFICES, LOWERING OF GROUND LEVELS, PROVISION OF 2 METRE HIGH SECURITY FENCING AND SCREEN PLANTING Objection
2000/0089 Storage of plant and machinery Closed
N6/1999/0526/CD Change of use from contractors yard to waste recycling and reclamation centre, including tyre shredding Granted
2000/0214 Material change in the use of the Land from the use for a contractor' yard and waste transfer station to a mixed use for both a contractor's yard and waste transfer station and a composting facility without the benefit of planning permission. the term 'composting facility' throughout this notice means the importation and deposit of unprocessed and processed green and organic waste material and the use of shredders and screeners to process that material or the burning of that material Closed 0

There are no NMAs associated with this application