Return to search results   -   Start a new search   -   The consultation period for this application has now closed

Planning Application: 6/2019/2431/MAJ


MAJOR DEVELOPMENT

Decided - Granted

Ms Louise Sahlke

l.sahlke@welhat.gov.uk

Link Drive Car Park Link Drive Hatfield AL10 8TY

Erection of a 6 x storey building comprising of 80 x flats, associated works to include undercroft car parking, cycle parking, plant and refuse storage

522603

208496

  • Hatfield East

  • Councillor Larry Crofton
  • Councillor Cathy Watson
  • Councillor Shirley Asare

Hatfield

100080967840
30/09/2019
01/11/2019
10/11/2021
22/11/2019
06/12/2021

Mr C LLoyd

C/O Agent

2 John Street London WC1N 2ES

Council Offices The Campus Wewlyn Garden City AL8 6AE
Description Distance
Parish 0.00
Rights of Way 44.15
Rights of Way 4.74
Rights of Way 0.00
Urban Open Land 0.00
Article 4 HMO Direction 0.00
Cycle Paths 9.17
Flood Zone Surface Water 100mm 0.00
Flood Zone Surface Water 1000mm 0.00
Flood Zone Surface Water 1000mm 0.00
Flood Zone Surface Water 1000mm 0.00
Flood Zone Surface Water 1000mm 0.00
Hertfordshire Ecological Network 0.00
Sand and Gravel Belt 0.00
Hackitt Review - fire safety of high rise buildings 0.00
Hatfield Heritage Assesment Areas 0.00

Granted
23/08/2022
23/08/2022

Committee
20/01/2022

If any documents do not appear to be shown below, please email planning@welhat.gov.uk including the case number. We will endeavour to publish any missing items within 10 working days.

To download a selection of individual documents place a tick alongside each of the relevant rows and then click on Download selected files. To download all of the documents place a tick in the box alongside the header row and all of the files will be selected, then click on Download selected files. To view individual documents click on the File for the required row.

Select All File Description Date Uploaded
Block Plan
M9731-HUN-A -03-0005 - Proposed Block Plan.pdf (0 kb) Proposed Block Plan 24/10/2019
L486330-HUN-00-00-GA-A-03-0006.pdf (0 kb) Existing Site Plan 29/06/2020
Elevation and Floor Plans
M9731-HUN-A-01-0002 - Skate Park Elevations & Site Plan.pdf (0 kb) Skate Park Elevations and Site Plan 29/06/2020
Elevations
M9731 LINK DRIVE -11-0003.pdf (0 kb) Proposed Elevation 1 & 2 31/10/2019
Enclosure 9 - Elevation 3 & 4 - black and white.pdf (0 kb) Proposed Elevation 3 & 4 05/02/2020
Enclosure 9 - Proposed Elevation 3 & 4- colourpdf.pdf (0 kb) Proposed Elevation 3 & 4 05/02/2020
L486330-HUN-XX-EL-EL-A-07-0001 (trees omitted).pdf (0 kb) Elevations Sheet 1 22/10/2021
L486330-HUN-XX-EL-EL-A-07-0002 (trees omitted).pdf (0 kb) Elevations Sheet 2 22/10/2021
Floor Plans
M9731-HUN-A-15-0002 - Flat Types Sheet 2.pdf (0 kb) Flat types sheet 2 (Flat types 3 & 4) 01/11/2019
M9731-HUN-A-15-0001 - Flat Types Sheet 1.pdf (0 kb) Flats type sheet 1 (Flat types 1 & 2) 01/11/2019
M9731-HUN-A-05-0001 - Proposed First Floor Plan.pdf (0 kb) Proposed Floor Level 01 29/06/2020
M9731-HUN-A-05-0002 - Proposed Second Floor Plan.pdf (0 kb) Proposed Floor Level 02 29/06/2020
M9731-HUN-A-05-0003 - Proposed Third Floor Plan.pdf (0 kb) Proposed Floor Level 03 29/06/2020
L486330-HUN-00-00-GA-A-03-0003.pdf (0 kb) Proposed Floor Level 04 29/06/2020
L486330-HUN-00-00-GA-A-03-0006.pdf (0 kb) Proposed Roof Plan 29/06/2020
L486330-HUN-XX-03-GA-A-05-0004 - General Arrangement - Third.pdf (0 kb) General Arrangement - Third 12/10/2021
L486330-HUN-XX-04-GA-A-05-0005 - General Arrangement - Fourth.pdf (0 kb) General Arrangement - Fourth 12/10/2021
L486330-HUN-XX-05-GA-A-05-0006 - General Arrangement Fifth.pdf (0 kb) General Arrangement - Fifth 12/10/2021
L486330-HUN-XX-RL-GA-A-05-0007 - General Arrangement - Roof.pdf (0 kb) General Arrangement - Roof 12/10/2021
L486330-HUN-XX-01-GA-A-05-0002 - General Arrangement - First.pdf (0 kb) General Arrangement - First 12/10/2021
L486330-HUN-XX-02-GA-A-05-0003 - General Arrangement - Second.pdf (0 kb) General Arrangement - Second 12/10/2021
L486330-HUN-XX-GF-GA-A-05-0001.pdf (0 kb) General Arrangement - Ground Floor 04/01/2022
Location Plan
L486330-HUN-00-00-GA-A-03-0004 - Proposed Site Location Plan.pdf (0 kb) Site Location Plan Proposed 12/10/2021
Plans
M9731-HUN-A -03-0003 - Existing Elevation 1 & 2.pdf (0 kb) Existing (Streetscene) Elevation 1 & 2 01/10/2019
M9731-HUN-A -03-0005 - Planning & Legal Boundaries.pdf (0 kb) Planning & Legal Boundaries 01/10/2019
M9731-HUN-A-03-0004 - Existing Elevation 3 & 4.pdf (0 kb) Existing (Streetscene) Elevation 3 & 4 01/10/2019
M9731-HUN-ZZ-ZZ-RG Link Drive Drawing Register.pdf (0 kb) Drawing Register 01/10/2019
190223-CON-X-00-DR-C-1000.pdf (0 kb) Drainage Strategy 27/04/2020
2279 11A Link Drive Landscape Masterplan.pdf (0 kb) Landscape Masterplan 29/06/2020
2279 12G Link Drive General Arrangement.pdf (0 kb) General Arrangement 29/06/2020
Landscape Masterplan.pdf (0 kb) Landscape Masterplan 12/10/2021
Site Sections
M9731-HUN-A-10-0001 - Proposed Section.pdf (0 kb) Proposed Section 01/10/2019
Design & Access Statement
2019-09-30 DAS LD.pdf (0 kb) Design and Access Statement (SUPERSEDED) 01/10/2019
Enclosure 10 - 2019-09-30 DAS LD rev a 5 of 7(1).pdf (0 kb) Design and Access Statement p41-51 (Enclosure 10) 05/02/2020
Design and Access Statement.pdf (0 kb) Design and Access Statement (SUPERSEDED) 12/10/2021
Landscape Report
Landscape Addendum.pdf (0 kb) Landscape Addendum 12/10/2021
NMA Documents
ApplicationFormRedacted.pdf (0 kb) NMA Application form redacted 03/10/2023
Link Drive - s96a Covering Letter 250823_Redacted.pdf (0 kb) NMA Covering Letter_redacted 03/10/2023
ApplicationFormRedacted(1).pdf (0 kb) NMA 2 Applicationformredacted 17/10/2023
ApplicationFormRedacted(2).pdf (0 kb) NMA 3 Applicationformredacted 05/12/2023
Link Drive - s96a Covering Letter (Condition 15 - apartments) Rev A (002)_Redacted.pdf (0 kb) NMA 3 Cover Letter redacted 07/12/2023
Hatfield Skatepark Impact Assessment Mitigation Design_Nov 23_02 (002)_Redacted.pdf (0 kb) NMA 3 Noise Impact Assessment & Mitigation Design Redacted 07/12/2023
Link Drive_Apartment Acoustic Compliance Statement_121223_Redacted.pdf (0 kb) NMA 3 Apartment Acoustic Compliance Statement Redacted 14/12/2023
NMA Plans
L486330-HUN-XX-EL-EL-A-07-0002.pdf (0 kb) NMA - ELEVATIONS - SHEET 2 03/10/2023
L486330-HUN-XX-GF-GA-A-05-0001.pdf (0 kb) NMA GENERAL ARRANGEMENT - GROUND 03/10/2023
Planning Statement
Planning Statement - Submission.pdf (0 kb) Planning Statement,and Affordable Housing and CIL (SUPERSEDED) 01/10/2019
Planning Statement Addendum.pdf (0 kb) Planning Statement Addendum 12/10/2021
Transport Statement
ITR-MT-5333.TS.2 - Link Drive.pdf (0 kb) Transport Statement (PLANS NOT UPDATED, PART SUPERSEDED) 01/10/2019
Consultee Response
Comments.pdf (0 kb) Comment - WHBC - Client Services re bins 04/11/2019
620192431MAJ Link Drive Car Park - 80 flats.pdf (0 kb) Comment - NHS 01/11/2019
HCC F&RS Response, 6_2019_2431_MAJ, Link Drive Car Park, Link Drive, Hatfield.pdf (0 kb) Conditional - HCC F&R Services 01/11/2019
3rd Party Planning Application - 6_2019_2431_MAJ.pdf (0 kb) Comments - Thames Water 05/11/2019
FW_ Cadent and National Grid Plant Enquiry Response - Your Ref_ 6_2019_2431_MAJ (TC) Our Ref_ EA_GE4A_3NWP_020804.pdf (0 kb) Comment - Cadent Gas 06/11/2019
Our Ref_ EA_GE4A_3NWP_020804 Your Ref_ 6_2019_2431_MAJ (TC) Site Address_ AL10 8TY Link Drive Car Park Link Drive Hatfield.pdf (0 kb) Comment - Cadent Gas 07/11/2019
Comments(2).pdf (0 kb) Support - Hertfordshire Constabulary 11/11/2019
Comments(3).pdf (0 kb) Conditional - WHBC - Client Services re s106 W&R 18/11/2019
Comments(5).pdf (0 kb) Comment - WHBC - Affordable Housing 18/11/2019
S106 Response - 6_2019_2431_MAJ - Link Drive, Link Drive, Hatfield.pdf (0 kb) Comment - HCC Growth Team 15/11/2019
6-19-2431-1.pdf (0 kb) Conditional - Historic Environment Advisor 18/11/2019
620192431MAJ.pdf (0 kb) Conditional - Affinity Water 18/11/2019
Comments(7).pdf (0 kb) Comment - Parking Services - WHBC 20/11/2019
Link Drive Car Park Link Drive Hatfield AL10 8TY (6 2019 2431 MAJ).pdf (0 kb) Conditional - Spatial Planning 21/11/2019
620192431MAJ - LLFA 22.11.19.pdf (0 kb) Objection - LLFA 22/11/2019
PA 6-2019-2431-MAJ (Link Drive, Hatfield) - Submission.pdf (0 kb) Objection - The Ramblers Association - Attachment 22/11/2019
Comments(11).pdf (0 kb) Objection - The Ramblers Association 22/11/2019
620192431MAJ_HERef_P01123854_L357889.pdf (0 kb) Comment - Historic England 22/11/2019
Comments(12).pdf (0 kb) Objection - The Gardens Trust 27/11/2019
6_2019_2431_MAJ Link Drive Hatfield 28.11.19.pdf (0 kb) Comment - Place Services 28/11/2019
Planning application 6_2019_2431_MAJ - Link Drive Car Park.pdf (0 kb) Conditional - Herts Transport Programmes & Strategy 11/12/2019
Comments(15).pdf (0 kb) Comment - Street Naming & Numbering - WHBC 10/02/2020
Comments(16).pdf (0 kb) Comment - Street Naming & Numbering - WHBC 10/02/2020
SNN Policy Doc.pdf (0 kb) Comment - Street Naming & Numbering - WHBC - SNN Policy 10/02/2020
3rd Party Planning Application - 6_2019_2431_MAJ- Amended.pdf (0 kb) Comment - Thames Water 06/02/2020
Comments(17).pdf (0 kb) Support - Hertfordshire Constabulary 14/02/2020
Planning application 6_2019_2431_MAJ - Link Drive Car Park(1).pdf (0 kb) Conditional - Herts Transport Programme & Strategy 19/02/2020
6-19-2431-2.pdf (0 kb) Comments - Historic Environment Advisor 26/02/2020
620192431MAJ - LLFA 25.02.2020.pdf (0 kb) Objection - LLFA, Hertfordshire County Council 25/02/2020
620192431MAJ_HERef_P01123854_L365823.pdf (0 kb) Comments - Historic England 04/03/2020
620192431MAJ - LLFA 18 05 2020.pdf (0 kb) Comment - LLFA 20/05/2020
Link Drive Car Park June 2020.pdf (0 kb) Conditional - Public Health & Protection 18/06/2020
Comments(18).pdf (0 kb) Conditional - WHBC - Client Services 29/06/2020
Late Reps, item 6 - THames Water.pdf (0 kb) Late Rep- Thames Water 30/06/2020
Comments(20).pdf (0 kb) Late Rep- Hertfordshire Constabulary 01/07/2020
Link Drive Car Park Link Drive.pdf (0 kb) Late Rep - Hertfordshire Growth team 02/07/2020
Comments(21).pdf (0 kb) Late Rep - Public Health and Protection 07/07/2020
Response_6-2019-2431-MAJ.pdf (0 kb) Late Rep - Herts Transport, Programmes & Stratergy 09/07/2020
Hatfield council 1.pdf (0 kb) Late Rep - Hatfield Town Council 16/07/2020
6_2019_2431_MAJ ADDITIONAL Link Drive Hatfield 13.07.20.pdf (0 kb) Conditional - Conservation Officer 13/07/2020
620192431MAJ - LLFA 17.07.2020.pdf (0 kb) Comment - LLFA 17/07/2020
6-19-2431-3.pdf (0 kb) Comment- Historic Environment Advisor 21/07/2020
Comments(22).pdf (0 kb) No objection - Gerry Brophy - Hertfordshire Constabulary 13/10/2021
2019_2431_Cadent Gas.pdf (0 kb) Comment - Cadent Gas- plan 13/10/2021
Comments(23).pdf (0 kb) No comments - Alison Allighan - The Gardens Trust 21/10/2021
WK127342 - Car Park Link Drive.pdf (0 kb) No Objection Public Health and Protection 21/10/2021
Comments(25).pdf (0 kb) Major objection - Carrie Lloyd - Hatfield Town Council 22/10/2021
Response_6-2019-2431-MAJ HCC Highways.pdf (0 kb) No objection - HCC Highways 25/10/2021
Response 2019_2431_MAJ - Historic England.pdf (0 kb) No comment -Historic England 28/10/2021
Response 2019_2431_MAJ - SUDS LLFA - Comment.pdf (0 kb) Comment - SUDS LLFA 29/10/2021
Response 2019-2431-MAJ - HCC Growth and Infrastructure.pdf (0 kb) Comment - HCC Growth and Infrastructure 03/11/2021
FW_ 2019_2431_MAJ_Redacted.pdf (0 kb) Comment - WHBC landscapes - email redacted 08/11/2021
6_2019_2431_MAJ AMENDED Link Drive Hatfield 16.11.21.pdf (0 kb) No objection-Conservation Officer 16/11/2021
Link Drive Planning Consultation_Redacted.pdf (0 kb) Comments - Hertfordshire Building Control - Redacted 03/12/2021
HFRS Fire Protection comments_Redacted.pdf (0 kb) Comments - HFRS Fire Protection - Redacted 03/12/2021
Health and Safety Executive comments_Redacted.pdf (0 kb) Comments - Health and Safety Executive - Redacted 03/12/2021
WHBC Affordable Housing_Redacted.pdf (0 kb) Comments - WHBC Affordable Housing - Redacted 03/12/2021
24381450_CadentGas.pdf (0 kb) Comment - Cadent Gas Attachment 25/09/2024
Cadent Gas Comment maj.pdf (0 kb) Comment - Cadent Gas 25/09/2024
Neighbour Representation - Without Personal Information
Comments-Redacted.pdf (0 kb) Objection - 11 Market Place - Redacted 07/11/2019
Comments-Redacted(1).pdf (0 kb) Objection - 2 Cotton Field - Redacted 18/11/2019
Comments-Redacted(2).pdf (0 kb) Objection - 13 Market Place - Redacted 20/11/2019
Comments-Redacted(3).pdf (0 kb) Objection - Herts Young And Homeless - Redacted 21/11/2019
Comments-Redacted(4).pdf (0 kb) Objection - City Church Gracemead House - Redacted 21/11/2019
Comments-Redacted(5).pdf (0 kb) Objection - ELIM Trust Gracemead House - Redacted 22/11/2019
Comments-Redacted(7).pdf (0 kb) Comment - Paradigm Housing Group - Redacted 23/12/2019
Hatfield Town Centre Planning_Redacted.pdf (0 kb) Support - University Of Hertfordshire - Redacted 06/01/2020
Comments-Redacted(8).pdf (0 kb) Objection - 28-30 Market Place - Redacted 08/02/2020
81 Crawford Road, Hatfield, AL10 0PF Objection 21-10-2021-Redacted.pdf (0 kb) Objection - 81 Crawford Road Hatfield -Redacted 21/10/2021
107 Birchwood Avenue, Hatfield, AL10 0PT Objection 26-10-2021-Redacted.pdf (0 kb) Objection - 107 Birchwood Avenue Hatfield AL10 0PT -Redacted 26/10/2021
FW_ 6_2019_2431_MAJ - speaking invitation as Objector_Redacted.pdf (0 kb) Late representation - WelHatCycling redacted 18/01/2022
Link Drive flats objection and proposal from WelHatCycling (002).pdf (0 kb) Late representation - WelHatCycling attachment 18/01/2022
Photographs
Enclosure 11 - 190601_Finsbury-Park-Skatepark-1(1).jpg (0 kb) Skatepark photo 1 (Enclosure 11) 05/02/2020
Enclosure 11 - 190601_Finsbury-Park-Skatepark-2(1).jpg (0 kb) Skatepark photo 2 (Enclosure 11) 05/02/2020
Legal Agreement
Section 106 Agreement 23 August 2022_Redacted.pdf (0 kb) S106 Agreement 23 August 2022 redacted 23/08/2022
Side Agreement 23 August 2022_Redacted.pdf (0 kb) S106 Side Agreement 23 August 2022 redacted 23/08/2022
Decision Notice PDF
Decision Notice_620192431MAJ.pdf (0 kb) Decision Notice PDF 23/08/2022
One-off letter_620192431MAJ.pdf (0 kb) NMA 26/10/2023
One-off letter_620192431MAJ(1).pdf (0 kb) NMA2 26/10/2023
Officer Report
6-2019-2431-MAJ Link Drive Car Park.pdf (0 kb) Committee report 24/07/2022
Officer Report PDF
2019-2431-MAJ Link Drive Car Park.pdf (0 kb) case officer report 15/07/2020
Application Documents
Welhat Link Road W.pdf (0 kb) Comment - Historic England 08/07/2020
Administration Documents
Completed notice form.pdf (0 kb) Notice 13 01/10/2019
Amended Plans
Appendix 16 - Highways Plan.PDF (0 kb) plan demonstrating R of W 08/12/2021
Correspondence
LD- Rebuttal 29(1).pdf (0 kb) Agents Response to Objection 30/01/2020
Cover Letter_Redacted.pdf (0 kb) Cover letter from Boyer redacted 12/10/2021
Cover Letter.pdf (0 kb) Cover letter from Boyer 12/10/2021
Daylight & Sunlight Assessment
19-5784 - Hatfield Sites (Link Drive) - Internal Daylight Result (Phase 2)(1).pdf (0 kb) Internal Daylight Analysis Report (SUPERSEDED) 09/10/2019
19-5784 - Hatfield Sites (Link Drive) - Daylight, Sunlight and Overshadowing Report (Phase 2)_v2.pdf (0 kb) Daylight, Sunlight & Overshadowing Report (SUPERSEDED) 09/10/2019
Daylight and Sunlight Assessment.pdf (0 kb) Daylight and Sunlight Assessment (SUPERSEDED) 12/10/2021
Documents
P19-110-R02v1 Skate Park Noise Link Drive, Hatfield_Redacted.pdf (0 kb) Further Noise Assessment - redacted (SUPERSEDED) 29/06/2020
Energy Statement
Link Drive Energy Strategy 190930.pdf (0 kb) Energy Statement (SUPERSEDED) 01/10/2019
Energy Statement.pdf (0 kb) Energy Statement (SUPERSEDED) 12/10/2021
Flood Impact Assessment
Link Drive FRA & Drainage Strategy_2.pdf (0 kb) Flood Risk Assessment and Drainage Strategy (PLANS NOT UPDATED PART SUPERSEDED) 01/10/2019
Heritage Statement
Heritage Addendum.pdf (0 kb) Heritage Addendum 12/10/2021
Neighbour Representation
Link Drive .pdf (0 kb) Objection - City Church Gracemead House - Attachment 22/11/2019
Hatfield - Link Drive - Response to planning application.pdf (0 kb) Comment - Paradigm Housing Group - Attachment 23/12/2019
Noise Impact Assessment
P19-110-R01v1 Link Drive, Hatfield_Redacted.pdf (0 kb) Noise Assessment Impact-Redacted (SUPERSEDED) 08/10/2019
Noise Impact Assessment.pdf (0 kb) Noise Impact Assessment (SUPERSEDED) 12/10/2021
Report
Redacted(1).pdf (0 kb) Abrocultural-Redacted (SUPERSEDED) 05/11/2019
HTVA Link Drive Hatfield LR_Redacted.pdf (0 kb) Heritage, Townscape and Visual Assessment-Redacted 08/10/2019
Redacted_Redacted.pdf (0 kb) Ecology Redacted 24/10/2019
Archaeological Desk-Based Assessment_Redacted.pdf (0 kb) Arcaeological Report-Redacted 09/01/2020
UK19.4673 Phase I II Geo-Environmental Assessment - Link Drive Car Par..__Redacted.pdf (0 kb) Geo Enviroment Report-Redacted 09/01/2020
Enclosure 8 - Daylight and Sunlight_Addendum report(1).pdf (0 kb) Daylight and Sunlight Addendum Report (Enclosure 8) 05/02/2020
Enclosure 5 - Drainage(1).pdf (0 kb) Drainage Strategy 190223-CON-X-00-DR-C-1000 Rev P4 (Enclosure 5) 05/02/2020
Accessibility Strategy.pdf (0 kb) Accessibility Strategy (SUPERSEDED) 12/10/2021
Arboricultural Impact Assessment.pdf (0 kb) Arboricultural Impact Assessment 12/10/2021
Fire Safety Statement.pdf (0 kb) Fire Safety Statement 12/10/2021
Overheating Assessment.pdf (0 kb) Overheating Assessment (SUPERSEDED) 12/10/2021
Transport Technical Note.pdf (0 kb) Transport Technical Note (PLAN NOT UPDATED) 12/10/2021
Vehicle Tracking Sheet.pdf (0 kb) Vehicle Tracking Sheet 12/10/2021
Daylight and Sunlight Assessment(2).pdf (0 kb) 03/12/2021 Daylight and Sunlight assessment 03/12/2021
Overheating Report(1).pdf (0 kb) 03/12/2021 Summer Overheating Report 03/12/2021
Noise Impact Assessment(2).pdf (0 kb) 03/12/2021 Noise Impact Assessment 03/12/2021
Energy Report(1).pdf (0 kb) 03/12/2021 Energy Report 03/12/2021
Design and Access Statement - Redacted.pdf (0 kb) 03/12/2021 Design & Access Statement 03/12/2021
L486330-HUN-XX-XX-RP-A-02-0004(1).pdf (0 kb) Accessibility housing report 22/10/2021
Site Notice
Site Notice_620192431MAJ.pdf (0 kb) Site Notice 11/11/2019
Site Notice_620192431MAJ(1).pdf (0 kb) Site Notice 15/11/2021
Site Plan
L486330-HUN-XX-00-GA-A-03-0001 - Site Plan.pdf (0 kb) Site Plan 12/10/2021
L486330-HUN-00-00-GA-A-03-0006.pdf (0 kb) Existing site plan 14/01/2022
L486330-HUN-00-00-GA-A-03-0003.pdf (0 kb) Site location plan existing 12/01/2022
L486330-HUN-XX-EL-A-03-0010.pdf (0 kb) (Skate Park) Elevations and Site Plan 12/01/2022
L486330-HUN-00-00-GA-A-03-0004.pdf (0 kb) Site location plan proposed 12/01/2022
L486330-HUN-XX-00-GA-A-03-0001.pdf (0 kb) Site Plan 12/01/2022
Superseded Plans
2279 11 Link Drive Landscape Masterplan.pdf (0 kb) Landscape Masterplan 01/10/2019
2279 12F Link Drive General Arrangement.pdf (0 kb) General Arrangement 01/10/2019
2279 15 Link Drive Tree planting proposals.pdf (0 kb) Tree Planting Proposals 01/10/2019
M9731-HUN-A -03-0002 - Existing Site Plan.pdf (0 kb) Existing Block Plan 01/10/2019
M9731-HUN-A -03-0001 - Existing Site Location Plan.pdf (0 kb) Existing Site Location Plan 24/10/2019
M9731-HUN-A -05-0002 - Proposed Level 02.pdf (0 kb) Proposed Floor Level 02 24/10/2019
M9731-HUN-A -05-0003 - Proposed Level 03.pdf (0 kb) Proposed Floor Level 03 24/10/2019
M9731-HUN-A -05-0004 - Proposed Level 04.pdf (0 kb) Proposed Floor Level 04 24/10/2019
M9731-HUN-A -05-0005 - Proposed Level 05.pdf (0 kb) Proposed Floor Level 05 24/10/2019
M9731-HUN-A -05-0006 - Proposed Level 06.pdf (0 kb) Proposed Roof Plan 24/10/2019
Enclosure 4 - Link Drive refuse.pdf (0 kb) Proposed Floor 00 05/02/2020
L486330-HUN-00-00-GA-A-03-0006.pdf (0 kb) Existing Site Location Plan 29/06/2020
M9731-HUN-A-05-0000 - Proposed Ground Floor Plan.pdf (0 kb) Proposed Floor 00 29/06/2020
M9731-HUN-A-05-0005 - Proposed Fifth Floor Plan.pdf (0 kb) Proposed Floor Level 05 29/06/2020
2279 15A Link Drive Tree planting proposals.pdf (0 kb) Tree Planting Proposals 29/06/2020
L486330-HUN-XX-EL-EL-A-07-0001 - Proposed Elevations Sheet 1.pdf (0 kb) Elevations Sheet 1 12/10/2021
L486330-HUN-XX-EL-EL-A-07-0002 - Proposed Elevations Sheet 2.pdf (0 kb) Proposed Elevations Sheet 2 12/10/2021
L486330-HUN-XX-GF-GA-A-05-0001 - General Arrangement - Ground Floor.pdf (0 kb) General Arrangement - Ground Floor 12/10/2021
Supporting Information
Enclosure 2 - Link Drive Accom Schedule 16th Dec 2019(1).pdf (0 kb) Accommodation Schedule (Enclosure 2) 05/02/2020
Enclosure 3 - Cadent gas ltd mapping(1).pdf (0 kb) Cadent Gas Map (Enclosure 3) 05/02/2020
Enclosure 6- Link Drive Flow Results (002)(1).pdf (0 kb) Drainage Flow Rates (Enclosure 6) 05/02/2020
Enclosure 7 - Rev-2 Pre-dev letter for Al10 8TY(1.0) (002)(1).pdf (0 kb) Pre Development Letter Thames Water (Enclosure 7) 05/02/2020
Enclosure 1 - Existing Fire Hydrants 191007(1).pdf (0 kb) Fire hydrants (Enclosure 1) 05/02/2020
Travel Plan
ITR-MT-5333.FTP.2 - Link Drive.pdf (0 kb) Travel Plan 01/10/2019
Organisation Name Sent Reply Due Reply Received
Health and Safety Executive (Hazard Substances) 28/10/2021 18/11/2021 03/12/2021
Health and Safety Executive (Hazard Substances) 23/08/2022
Health and Safety Executive (Hazard Substances) 12/01/2022
Hertfordshire Building Control Limited 23/08/2022
Hertfordshire Building Control Limited 12/01/2022
Hertfordshire Building Control Limited 26/10/2021 16/11/2021 22/11/2019
Hertfordshire Building Control Limited 26/10/2021 16/11/2021 03/12/2021
Herts & Middlesex Wildlife Trust 29/06/2020 13/07/2020
Herts & Middlesex Wildlife Trust 01/11/2019 22/11/2019
Herts & Middlesex Wildlife Trust 23/08/2022
Herts & Middlesex Wildlife Trust 09/07/2020
Herts & Middlesex Wildlife Trust 12/10/2021 02/11/2021
Herts & Middlesex Wildlife Trust 12/01/2022
Place Services Conservation Officer 09/07/2020
Place Services Conservation Officer 12/10/2021 02/11/2021
Place Services Conservation Officer 12/01/2022
Place Services Conservation Officer 29/06/2020 13/07/2020 13/07/2020
Place Services Conservation Officer 23/08/2022
Place Services Conservation Officer 05/11/2019 26/11/2019 28/11/2019
The Gardens Trust Conservation Team 01/11/2019 22/11/2019 27/11/2019
The Gardens Trust Conservation Team 29/06/2020 13/07/2020 29/06/2020
The Gardens Trust Conservation Team 23/08/2022
The Gardens Trust Conservation Team 09/07/2020
The Gardens Trust Conservation Team 12/10/2021 02/11/2021 21/10/2021
The Gardens Trust Conservation Team 12/01/2022
Welwyn Hatfield Borough Council Councillor Caron Anne Juggins 09/07/2020
Welwyn Hatfield Borough Council Councillor Caron Anne Juggins 12/10/2021 02/11/2021
Welwyn Hatfield Borough Council Councillor Caron Anne Juggins 12/01/2022
Welwyn Hatfield Borough Council Councillor Caron Anne Juggins 29/06/2020 13/07/2020
Welwyn Hatfield Borough Council Councillor Caron Anne Juggins 23/08/2022
Welwyn Hatfield Borough Council Councillor Caron Anne Juggins 06/11/2019 27/11/2019
Welwyn Hatfield Borough Council Councillor Edward Boulton 06/11/2019 27/11/2019
Welwyn Hatfield Borough Council Councillor Edward Boulton 23/08/2022
Welwyn Hatfield Borough Council Councillor Edward Boulton 29/06/2020 13/07/2020
Welwyn Hatfield Borough Council Councillor Edward Boulton 12/01/2022
Welwyn Hatfield Borough Council Councillor Edward Boulton 09/07/2020
Welwyn Hatfield Borough Council Councillor James Lake 12/01/2022
Welwyn Hatfield Borough Council Councillor James Lake 12/10/2021 02/11/2021
Welwyn Hatfield Borough Council Councillor James Lake 23/08/2022
Welwyn Hatfield Borough Council Councillor Larry Crofton 23/08/2022
Welwyn Hatfield Borough Council Councillor Peter Hebden 09/07/2020
Welwyn Hatfield Borough Council Councillor Peter Hebden 12/10/2021 02/11/2021
Welwyn Hatfield Borough Council Councillor Peter Hebden 12/01/2022
Welwyn Hatfield Borough Council Councillor Peter Hebden 29/06/2020 13/07/2020
Welwyn Hatfield Borough Council Councillor Peter Hebden 23/08/2022
Welwyn Hatfield Borough Council Councillor Peter Hebden 06/11/2019 27/11/2019
Hertfordshire County Council - S106 Obligations Denise Headland 12/01/2022
Hertfordshire County Council - S106 Obligations Denise Headland 12/10/2021 02/11/2021
Hertfordshire County Council - S106 Obligations Denise Headland 09/07/2020
Hertfordshire County Council - S106 Obligations Denise Headland 23/08/2022
Hertfordshire County Council - S106 Obligations Denise Headland 01/11/2019 22/11/2019
Hertfordshire County Council Emma Chapman - Spatial Planning & Economy Team 12/01/2022
Hertfordshire County Council Emma Chapman - Spatial Planning & Economy Team 12/10/2021 02/11/2021
Hertfordshire County Council Emma Chapman - Spatial Planning & Economy Team 09/07/2020
Hertfordshire County Council Emma Chapman - Spatial Planning & Economy Team 23/08/2022
Hertfordshire County Council Emma Chapman - Spatial Planning & Economy Team 01/11/2019 22/11/2019 21/11/2019
Hertfordshire County Council Emma Chapman - Spatial Planning & Economy Team 29/06/2020 13/07/2020
Lead Local Flood Authority Fiona Lai 12/01/2022
Lead Local Flood Authority Fiona Lai 29/06/2020 13/07/2020 17/07/2020
Lead Local Flood Authority Fiona Lai 12/10/2021 02/11/2021 29/10/2021
Lead Local Flood Authority Fiona Lai 09/07/2020
Lead Local Flood Authority Fiona Lai 23/08/2022
Lead Local Flood Authority Fiona Lai 01/11/2019 22/11/2019 22/11/2019
Hertfordshire Constabulary Gerry Brophy 01/11/2019 22/11/2019 11/11/2019
Hertfordshire Constabulary Gerry Brophy 23/08/2022
Hertfordshire Constabulary Gerry Brophy 09/07/2020 01/07/2020
Hertfordshire Constabulary Gerry Brophy 12/10/2021 02/11/2021 13/10/2021
Hertfordshire Constabulary Gerry Brophy 12/01/2022
Hertfordshire County Council HCC Growth Team 23/08/2022
Hertfordshire County Council HCC Growth Team 29/06/2020 13/07/2020 06/02/2020
Hertfordshire County Council HCC Growth Team 01/11/2019 22/11/2019 15/11/2019
Hertfordshire County Council HCC Growth Team 12/01/2022
Hertfordshire County Council HCC Growth Team 12/10/2021 02/11/2021 02/11/2021
Hertfordshire County Council HCC Growth Team 09/07/2020 02/07/2020
Hertfordshire County Council Hertfordshire Transport Programmes & Strategy 12/01/2022
Hertfordshire County Council Hertfordshire Transport Programmes & Strategy 12/10/2021 02/11/2021
Hertfordshire County Council Hertfordshire Transport Programmes & Strategy 09/07/2020 25/10/2021
Hertfordshire County Council Hertfordshire Transport Programmes & Strategy 23/08/2022
Hertfordshire County Council Hertfordshire Transport Programmes & Strategy 29/06/2020 13/07/2020 19/02/2020
Hertfordshire County Council Hertfordshire Transport Programmes & Strategy 01/11/2019 22/11/2019 22/11/2019
Hertfordshire County Council Historic Environment Advisor 12/01/2022
Hertfordshire County Council Historic Environment Advisor 12/10/2021 02/11/2021
Hertfordshire County Council Historic Environment Advisor 09/07/2020
Hertfordshire County Council Historic Environment Advisor 23/08/2022
Hertfordshire County Council Historic Environment Advisor 01/11/2019 22/11/2019 18/11/2019
Hertfordshire County Council Historic Environment Advisor 29/06/2020 13/07/2020 26/02/2020
The Ramblers' Association Ian Hardy 29/06/2020 13/07/2020
The Ramblers' Association Ian Hardy 09/07/2020
The Ramblers' Association Ian Hardy 12/10/2021 02/11/2021
Hatfield Town Council Jonah Anthony 12/01/2022
Hatfield Town Council Jonah Anthony 12/10/2021 02/11/2021 22/10/2021
Hatfield Town Council Jonah Anthony 09/07/2020
Hatfield Town Council Jonah Anthony 23/08/2022
Hatfield Town Council Jonah Anthony 29/06/2020 13/07/2020 16/07/2020
Hatfield Town Council Jonah Anthony 06/11/2019 27/11/2019
HFRS Fire Protection Kathleen Montgomery 12/01/2022
HFRS Fire Protection Kathleen Montgomery 23/08/2022
HFRS Fire Protection Kathleen Montgomery 26/10/2021 16/11/2021 03/12/2021
Welwyn Hatfield Borough Council Landscapes Department 01/11/2019 22/11/2019
Welwyn Hatfield Borough Council Landscapes Department 29/06/2020 13/07/2020
Welwyn Hatfield Borough Council Landscapes Department 23/08/2022
Welwyn Hatfield Borough Council Landscapes Department 09/07/2020
Welwyn Hatfield Borough Council Landscapes Department 12/10/2021 02/11/2021 05/11/2021
Welwyn Hatfield Borough Council Landscapes Department 12/01/2022
WHBC - Client Services Lorraine Davis 01/11/2019 22/11/2019 18/11/2019
WHBC - Client Services Lorraine Davis 29/06/2020 13/07/2020 29/06/2020
WHBC - Client Services Lorraine Davis 23/08/2022
WHBC - Client Services Lorraine Davis 09/07/2020
WHBC - Client Services Lorraine Davis 12/10/2021 02/11/2021
WHBC - Client Services Lorraine Davis 12/01/2022
Welwyn Hatfield Borough Council Lorraine Davis - Street Naming & Numbering 29/06/2020 13/07/2020 10/02/2020
Welwyn Hatfield Borough Council Lorraine Davis - Street Naming & Numbering 01/11/2019 22/11/2019
Welwyn Hatfield Borough Council Lorraine Davis - Street Naming & Numbering 23/08/2022
Welwyn Hatfield Borough Council Lorraine Davis - Street Naming & Numbering 09/07/2020
Welwyn Hatfield Borough Council Lorraine Davis - Street Naming & Numbering 12/10/2021 02/11/2021
Welwyn Hatfield Borough Council Lorraine Davis - Street Naming & Numbering 12/01/2022
Hertfordshire Ecology Martin Hicks 12/01/2022
Hertfordshire Ecology Martin Hicks 12/10/2021 02/11/2021
Hertfordshire Ecology Martin Hicks 09/07/2020
Hertfordshire Ecology Martin Hicks 23/08/2022
Hertfordshire Ecology Martin Hicks 29/06/2020 13/07/2020 26/02/2020
Hertfordshire Ecology Martin Hicks 01/11/2019 22/11/2019
Welwyn Hatfield Borough Council Milan Johnston 29/06/2020 13/07/2020
Welwyn Hatfield Borough Council Milan Johnston 23/08/2022
Welwyn Hatfield Borough Council Milan Johnston 09/07/2020
Welwyn Hatfield Borough Council Milan Johnston 12/10/2021 02/11/2021
Welwyn Hatfield Borough Council Milan Johnston 12/01/2022
Welwyn Hatfield Borough Council Milan Johnston 01/11/2019 22/11/2019
WHBC - Affordable Housing Mr Jeremy Morton 01/11/2019 22/11/2019 18/11/2019
WHBC - Affordable Housing Mr Jeremy Morton 29/06/2020 13/07/2020 09/11/2021
WHBC - Affordable Housing Mr Jeremy Morton 23/08/2022
WHBC - Affordable Housing Mr Jeremy Morton 09/07/2020
WHBC - Affordable Housing Mr Jeremy Morton 12/10/2021 02/11/2021
WHBC - Affordable Housing Mr Jeremy Morton 12/01/2022
Cadent Gas Limited Mr S Carter 12/01/2022
Cadent Gas Limited Mr S Carter 12/10/2021 02/11/2021 13/10/2021
Cadent Gas Limited Mr S Carter 09/07/2020
Cadent Gas Limited Mr S Carter 23/08/2022 22/09/2024
Cadent Gas Limited Mr S Carter 29/06/2020 13/07/2020
Cadent Gas Limited Mr S Carter 01/11/2019 22/11/2019 06/11/2019
Environment Agency Natasha Smith 12/01/2022
Environment Agency Natasha Smith 12/10/2021 02/11/2021
Environment Agency Natasha Smith 09/07/2020
Environment Agency Natasha Smith 23/08/2022
Environment Agency Natasha Smith 01/11/2019 22/11/2019
Environment Agency Natasha Smith 29/06/2020 13/07/2020
Thames Water, Development Control Nicky McHugh 01/11/2019 22/11/2019 05/11/2019
Thames Water, Development Control Nicky McHugh 29/06/2020 13/07/2020 06/02/2020
Thames Water, Development Control Nicky McHugh 23/08/2022
Thames Water, Development Control Nicky McHugh 09/07/2020 30/06/2020
Thames Water, Development Control Nicky McHugh 12/10/2021 02/11/2021
Thames Water, Development Control Nicky McHugh 12/01/2022
Welwyn Hatfield Borough Council Parking Services 12/01/2022
Welwyn Hatfield Borough Council Parking Services 12/10/2021 02/11/2021
Welwyn Hatfield Borough Council Parking Services 09/07/2020
Welwyn Hatfield Borough Council Parking Services 23/08/2022
Welwyn Hatfield Borough Council Parking Services 29/06/2020 13/07/2020
Welwyn Hatfield Borough Council Parking Services 01/11/2019 22/11/2019 20/11/2019
Welwyn Hatfield Borough Council Planning Policy 29/06/2020 13/07/2020
Welwyn Hatfield Borough Council Planning Policy 23/08/2022
Welwyn Hatfield Borough Council Planning Policy 09/07/2020
Welwyn Hatfield Borough Council Planning Policy 12/10/2021 02/11/2021
Welwyn Hatfield Borough Council Planning Policy 12/01/2022
Welwyn Hatfield Borough Council Planning Policy 06/11/2019 27/11/2019 04/12/2019
Affinity Water Ltd Planning Team 12/01/2022
Affinity Water Ltd Planning Team 12/10/2021 02/11/2021
Affinity Water Ltd Planning Team 09/07/2020
Affinity Water Ltd Planning Team 23/08/2022
Affinity Water Ltd Planning Team 29/06/2020 13/07/2020
Affinity Water Ltd Planning Team 01/11/2019 22/11/2019 18/11/2019
WHBC - Public Health and Protection Public Health and Protection 29/06/2020 13/07/2020 07/07/2020
WHBC - Public Health and Protection Public Health and Protection 01/11/2019 22/11/2019 18/06/2020
WHBC - Public Health and Protection Public Health and Protection 23/08/2022
WHBC - Public Health and Protection Public Health and Protection 09/07/2020
WHBC - Public Health and Protection Public Health and Protection 12/10/2021 02/11/2021 21/10/2021
WHBC - Public Health and Protection Public Health and Protection 12/01/2022
NHS Sheila Addison 23/08/2022
NHS Sheila Addison 29/06/2020 13/07/2020
NHS Sheila Addison 01/11/2019 22/11/2019 01/11/2019
NHS Sheila Addison 12/01/2022
NHS Sheila Addison 12/10/2021 02/11/2021
NHS Sheila Addison 09/07/2020
Historic England Tom Goodman 12/01/2022
Historic England Tom Goodman 12/10/2021 02/11/2021 28/10/2021
Historic England Tom Goodman 09/07/2020
Historic England Tom Goodman 23/08/2022
Historic England Tom Goodman 29/06/2020 13/07/2020 04/03/2020
Historic England Tom Goodman 01/11/2019 22/11/2019 22/11/2019
Address Date Sent Expiry Date Date Reconsulted Reconsult Expiry Date
Paradigm Housing Group 1 Glory Park Avenue Wooburn Green Buckinghamshire HP10 0DF 12/10/2021 02/11/2021
1 Wood Close Hatfield AL10 8TY 01/11/2019 22/11/2019 12/10/2021 02/11/2021
30 Market Place Hatfield AL10 0LJ 01/11/2019 22/11/2019 12/10/2021 02/11/2021
Homes England Arpley House 110 Birchwood Boulevard Birchwood Warrington WA3 7QH 01/11/2019 22/11/2019 12/10/2021 02/11/2021
Homes England Arpley House 110 Birchwood Boulevard Birchwood Warrington WA3 7QH 01/11/2019 22/11/2019 12/10/2021 02/11/2021
Market Place Hatfield AL10 0LN 01/11/2019 22/11/2019 12/10/2021 02/11/2021
5 Market Place Hatfield AL10 0LJ 01/11/2019 22/11/2019 12/10/2021 02/11/2021
7 Market Place Hatfield AL10 0LJ 01/11/2019 22/11/2019 12/10/2021 02/11/2021
8 Market Place Hatfield AL10 0LN 01/11/2019 22/11/2019 12/10/2021 02/11/2021
9 Market Place Hatfield AL10 0LJ 01/11/2019 22/11/2019 12/10/2021 02/11/2021
10 Market Place Hatfield AL10 0LN 01/11/2019 22/11/2019 12/10/2021 02/11/2021
11 Market Place Hatfield AL10 0LJ 01/11/2019 22/11/2019 12/10/2021 02/11/2021
12 Market Place Hatfield AL10 0LN 01/11/2019 22/11/2019 12/10/2021 02/11/2021
13 Market Place Hatfield AL10 0LJ 01/11/2019 22/11/2019 12/10/2021 02/11/2021
14 Market Place Hatfield AL10 0LN 01/11/2019 22/11/2019 12/10/2021 02/11/2021
15 Market Place Hatfield AL10 0LJ 01/11/2019 22/11/2019 12/10/2021 02/11/2021
Market Place Hatfield AL10 0LN 01/11/2019 22/11/2019 12/10/2021 02/11/2021
17 Market Place Hatfield AL10 0LJ 01/11/2019 22/11/2019 12/10/2021 02/11/2021
19 Market Place Hatfield AL10 0LJ 01/11/2019 22/11/2019 12/10/2021 02/11/2021
20 Market Place Hatfield AL10 0LN 01/11/2019 22/11/2019 12/10/2021 02/11/2021
21 Market Place Hatfield AL10 0LJ 01/11/2019 22/11/2019 12/10/2021 02/11/2021
22 Market Place Hatfield AL10 0LN 01/11/2019 22/11/2019 12/10/2021 02/11/2021
24 Market Place Hatfield AL10 0LN 01/11/2019 22/11/2019 12/10/2021 02/11/2021
25 Market Place Hatfield AL10 0LJ 01/11/2019 22/11/2019 12/10/2021 02/11/2021
26 Market Place Hatfield AL10 0LN 01/11/2019 22/11/2019 12/10/2021 02/11/2021
27 Market Place Hatfield AL10 0LJ 01/11/2019 22/11/2019 12/10/2021 02/11/2021
29 Market Place Hatfield AL10 0LJ 01/11/2019 22/11/2019 12/10/2021 02/11/2021
37 Goldings House Goldings Crescent Hatfield AL10 8UA 01/11/2019 22/11/2019 12/10/2021 02/11/2021
38 Goldings House Goldings Crescent Hatfield AL10 8UA 01/11/2019 22/11/2019 12/10/2021 02/11/2021
39 Goldings House Goldings Crescent Hatfield AL10 8UA 01/11/2019 22/11/2019 12/10/2021 02/11/2021
40 Goldings House Goldings Crescent Hatfield AL10 8UA 01/11/2019 22/11/2019 12/10/2021 02/11/2021
41 Goldings House Goldings Crescent Hatfield AL10 8UA 01/11/2019 22/11/2019 12/10/2021 02/11/2021
42 Goldings House Goldings Crescent Hatfield AL10 8UA 01/11/2019 22/11/2019 12/10/2021 02/11/2021
43 Goldings House Goldings Crescent Hatfield AL10 8UA 01/11/2019 22/11/2019 12/10/2021 02/11/2021
44 Goldings House Goldings Crescent Hatfield AL10 8UA 01/11/2019 22/11/2019 12/10/2021 02/11/2021
45 Goldings House Goldings Crescent Hatfield AL10 8UA 01/11/2019 22/11/2019 12/10/2021 02/11/2021
46 Goldings House Goldings Crescent Hatfield AL10 8UA 01/11/2019 22/11/2019 12/10/2021 02/11/2021
47 Goldings House Goldings Crescent Hatfield AL10 8UA 01/11/2019 22/11/2019 12/10/2021 02/11/2021
48 Goldings House Goldings Crescent Hatfield AL10 8UA 01/11/2019 22/11/2019 12/10/2021 02/11/2021
49 Goldings House Goldings Crescent Hatfield AL10 8UA 01/11/2019 22/11/2019 12/10/2021 02/11/2021
50 Goldings House Goldings Crescent Hatfield AL10 8UA 01/11/2019 22/11/2019 12/10/2021 02/11/2021
51 Goldings House Goldings Crescent Hatfield AL10 8UA 01/11/2019 22/11/2019 12/10/2021 02/11/2021
52 Goldings House Goldings Crescent Hatfield AL10 8UA 01/11/2019 22/11/2019 12/10/2021 02/11/2021
53 Goldings House Goldings Crescent Hatfield AL10 8UA 01/11/2019 22/11/2019 12/10/2021 02/11/2021
54 Goldings House Goldings Crescent Hatfield AL10 8UA 01/11/2019 22/11/2019 12/10/2021 02/11/2021
55 Goldings House Goldings Crescent Hatfield AL10 8UA 01/11/2019 22/11/2019 12/10/2021 02/11/2021
56 Goldings House Goldings Crescent Hatfield AL10 8UA 01/11/2019 22/11/2019 12/10/2021 02/11/2021
57 Goldings House Goldings Crescent Hatfield AL10 8UA 01/11/2019 22/11/2019 12/10/2021 02/11/2021
58 Goldings House Goldings Crescent Hatfield AL10 8UA 01/11/2019 22/11/2019 12/10/2021 02/11/2021
59 Goldings House Goldings Crescent Hatfield AL10 8UA 01/11/2019 22/11/2019 12/10/2021 02/11/2021
60 Goldings House Goldings Crescent Hatfield AL10 8UA 01/11/2019 22/11/2019 12/10/2021 02/11/2021
61 Goldings House Goldings Crescent Hatfield AL10 8UA 01/11/2019 22/11/2019 12/10/2021 02/11/2021
62 Goldings House Goldings Crescent Hatfield AL10 8UA 01/11/2019 22/11/2019 12/10/2021 02/11/2021
63 Goldings House Goldings Crescent Hatfield AL10 8UA 01/11/2019 22/11/2019 12/10/2021 02/11/2021
64 Goldings House Goldings Crescent Hatfield AL10 8UA 01/11/2019 22/11/2019 12/10/2021 02/11/2021
65 Goldings House Goldings Crescent Hatfield AL10 8UA 01/11/2019 22/11/2019 12/10/2021 02/11/2021
66 Goldings House Goldings Crescent Hatfield AL10 8UA 01/11/2019 22/11/2019 12/10/2021 02/11/2021
67 Goldings House Goldings Crescent Hatfield AL10 8UA 01/11/2019 22/11/2019 12/10/2021 02/11/2021
68 Goldings House Goldings Crescent Hatfield AL10 8UA 01/11/2019 22/11/2019 12/10/2021 02/11/2021
69 Goldings House Goldings Crescent Hatfield AL10 8UA 01/11/2019 22/11/2019 12/10/2021 02/11/2021
70 Goldings House Goldings Crescent Hatfield AL10 8UA 01/11/2019 22/11/2019 12/10/2021 02/11/2021
71 Goldings House Goldings Crescent Hatfield AL10 8UA 01/11/2019 22/11/2019 12/10/2021 02/11/2021
72 Goldings House Goldings Crescent Hatfield AL10 8UA 01/11/2019 22/11/2019 12/10/2021 02/11/2021
73 Goldings House Goldings Crescent Hatfield AL10 8UA 01/11/2019 22/11/2019 12/10/2021 02/11/2021
74 Goldings House Goldings Crescent Hatfield AL10 8UA 01/11/2019 22/11/2019 12/10/2021 02/11/2021
75 Goldings House Goldings Crescent Hatfield AL10 8UA 01/11/2019 22/11/2019 12/10/2021 02/11/2021
76 Goldings House Goldings Crescent Hatfield AL10 8UA 01/11/2019 22/11/2019 12/10/2021 02/11/2021
77 Goldings House Goldings Crescent Hatfield AL10 8UA 01/11/2019 22/11/2019 12/10/2021 02/11/2021
78 Goldings House Goldings Crescent Hatfield AL10 8UA 01/11/2019 22/11/2019 12/10/2021 02/11/2021
107 Birchwood Avenue Hatfield AL10 0PT
2 Cotton Field Hatfield AL10 0DQ 12/10/2021 02/11/2021
81 Crawford Road Hatfield AL10 0PF
1 Link Close Hatfield AL10 8EN 01/11/2019 22/11/2019 12/10/2021 02/11/2021
2 Link Close Hatfield AL10 8EN 01/11/2019 22/11/2019 12/10/2021 02/11/2021
2 Wood Close Hatfield AL10 8TY 01/11/2019 22/11/2019 12/10/2021 02/11/2021
1 Wood Vale Hatfield AL10 8TT 01/11/2019 22/11/2019 12/10/2021 02/11/2021
2 Wood Vale Hatfield AL10 8TT 01/11/2019 22/11/2019 12/10/2021 02/11/2021
The Town Inn Queensway Hatfield AL10 0LQ 01/11/2019 22/11/2019 12/10/2021 02/11/2021
University Of Hertfordshire College Lane Hatfield AL10 9AB 12/10/2021 02/11/2021
Welwyn Hatfield Foyer Goldings House Goldings Crescent Hatfield AL10 8TZ 01/11/2019 22/11/2019 12/10/2021 02/11/2021
28-30 Market Place Hatfield AL10 0LN 01/11/2019 22/11/2019 12/10/2021 02/11/2021
33- Market Place Hatfield AL10 0LJ 01/11/2019 22/11/2019 12/10/2021 02/11/2021
32 Market Place Hatfield AL10 0LN 01/11/2019 22/11/2019 12/10/2021 02/11/2021
34 Market Place Hatfield AL10 0LN 01/11/2019 22/11/2019 12/10/2021 02/11/2021
31 Market Place Hatfield AL10 0LJ 01/11/2019 22/11/2019 12/10/2021 02/11/2021
1 Market Place Hatfield AL10 0LJ 01/11/2019 22/11/2019 12/10/2021 02/11/2021
3 Market Place Hatfield AL10 0JL 01/11/2019 22/11/2019 12/10/2021 02/11/2021
City Church Gracemead House Woods Avenue Hatfield AL10 8HX 01/11/2019 22/11/2019 12/10/2021 02/11/2021
Burville House Surgery Gracemead House Woods Avenue Hatfield AL10 8HX 01/11/2019 22/11/2019 12/10/2021 02/11/2021
Herts Young And Homeless Gracemead House Woods Avenue Hatfield AL10 8HX 01/11/2019 22/11/2019 12/10/2021 02/11/2021
ELIM Trust Gracemead House Woods Avenue Hatfield AL10 8HX 01/11/2019 22/11/2019 12/10/2021 02/11/2021
Application Number Proposal Decision Distance
6/2024/1083/COND Submission of details pursuant to condition 19 (Contamination) on Planning Permission 6/2019/2431/MAJ Granted 0
6/2024/0329/COND Submission of details pursuant to condition 16 (Noise Impact Report) on planning permission 6/2019/2431/MAJ Granted 0
6/2024/0155/COND Submission of details pursuant of condition 15 (windows and ventilation) on planning permission 6/2019/2431/MAJ Granted 0
6/2024/0060/COND Submission of details pursuant to condition 17 (car parking management plan) on planning permission 6/2019/2431/MAJ Granted 0
6/2023/2430/COND Submission of details pursuant to Condition 15 (Skate Park screen design) on planning permission 6/2019/2431/MAJ Granted 0
6/2023/2406/VAR Variation of condition 15 (reference to skate park screen) on planning permission 6/2019/2431/MAJ Withdrawn 0
6/2023/1979/VAR Variation of condition 15 (acoustic screening) on planning permission 6/2019/2431/MAJ Withdrawn 0
6/2023/1436/COND Submission of details pursuant of condition 2, parts B and C (Archaeological Written Scheme of Investigation) on planning permission 6/2019/2431/MAJ Granted 0
6/2023/1003/COND Submission of details pursuant to the discharge of condition 13 (Hard Landscaping) on planning permission 6/2019/2431/MAJ Granted 0
6/2023/0325/COND Submission of details pursuant to condition 2 PART A (Archaeological Written Scheme of Investigation) on planning permission 6/2019/2431/MAJ Granted 0
6/2023/0326/COND Submission of details pursuant to condition 7 (details of the demountable barrier) on planning permission 6/2019/2431/MAJ Granted 0
6/2023/0230/COND Submission of details pursuant to condition 19 (PART 1 - Land Contamination and PART 2 - Risk Assessment Report) on planning permission 6/2019/2431/MAJ Granted 0
6/2023/0124/COND Submission of details pursuant to condition 4 (Surface Water Drainage Scheme) on planning permission 6/2019/2431/MAJ Granted 0
6/2023/0126/COND Submission of details pursuant to condition 6 (soft landscaping) on planning permission 6/2019/2431/MAJ Granted 0
6/2023/0123/COND Submission of details pursuant to condition 1 (Construction Management Plan) on planning permission 6/2019/2431/MAJ Granted 0
6/2023/0125/COND Submission of details pursuant to condition 8 (external materials) on planning permission 6/2019/2431/MAJ Granted 0
6/2022/2133/COND Submission of details pursuant of condition 1 (construction management plan) on planning permission 6/2019/2431/MAJ Refused 0
6/2022/2318/COND Submission of details pursuant of condition 5 (Electric Car Charging Points) on planning permission 6/2019/2431/MAJ Granted 0
6/2022/2319/COND Submission of details pursuant of condition 8 (external materials) on planning permission 6/2019/2431/MAJ Refused 0
6/2022/2134/COND Submission of details pursuant of condition 2 (archaeological evaluation) on planning permission 6/2019/2431/MAJ Refused 0
6/2022/2135/COND Submission of details pursuant of condition 3 (waste management plan) on planning permission 6/2019/2431/MAJ Granted 0
6/2022/2136/COND Submission of details pursuant of condition 4 (SUDs) on planning permission 6/2019/2431/MAJ Refused 0
6/2022/2137/COND Submission of details pursuant of condition 19 (contamination) on planning permission 6/2019/2431/MAJ Part Discharged 0
6/2021/1989/VAR Variation of condition 30 (energy and ventilation strategy), on planning permission 6/2021/2431/MAJ Withdrawn 0
S6/2010/0709/FP CONVERSION OF EXISTING OFFICE ACCOMMODATION TO GROUND FLOOR AND FIRST FLOOR WING A, TO PROVIDE 5 BEDSIT UNITS AND CONVERSION OF 3No EXISTING SIXTH FLOOR ONE BED FLATS TO 2 BEDSIT UNITS FOR FOYER ACCOMMODATION AND SUPPORT FOR YOUNG PEOPLE Granted
S6/2010/0136/MA Redevelopment of Eastern End of Hatfield Town Centre, comprising demolition of existing buildings and provision of new mixed use development including new retail (A1, A2, A3, A4, A5), community meeting rooms (D2), office use (B1) or health use (D1), 94 residential units, 3 live/work units, new public realm, public toilets, taxi rank and bus interchange, together with associated provision for access, servicing, parking and landscaping Approval Subject to s106 0
S6/2005/0403/FP ERECTION OF A FOUR STOREY BLOCK TO PROVIDE TWENTY FIVE FLATS AND ASSOCIATED OFFICE ACCOMMODATION Withdrawn
S6/2004/0001/FP REDEVELOPMENT OF EASTERN END OF HATFIELD TOWN CENTRE, COMPRISING DEMOLITION OF EXISTING BUILDINGS AND PROVISION OF NEW MIXED USE DEVELOPMENT INCLUDING NEW RETAIL (A1, A2, A3, A4, A5), NON RESIDENT INSTITUTION USES (D1), 275 RESIDENTIAL UNITS, NEW ‘MARKET HALL’, PUBLIC REALM AND BUS INTERCHANGE, TOGETHER WITH ASSOCIATED PROVISION FOR ACCESS, SERVICING, PARKING (INCLUDING MULTI STOREY CAR PARK) AND LANDSCAPING. PARTIAL RETENTION OF WHITE LION HOUSE AND RETENTION, ALTERATION AND CHANGE OF USE OF KENNELWOOD HOUSE. TEMPORARY USES OF SITE INCLUDING; CONTRACTORS COMPOUND, PUBLIC CAR PARK, SITE ACCESSES, AND ASSOCIATED SECURITY FENCING. Approval Subject to s106 1
S6/1999/0180/FP Installation of eight CCTV cameras and two transmitters on eight columns to existing car parks Granted 0
Reference Number Description Validated Date Expiry Date Reason For Change Officer Decision Decision Date
6/2019/2431/NMA Non material amendment following approval of planning permission 6/2019/2431/MAJ (1) two additional mesh grilles and the change of an existing louvred grille to mesh, on the west elevation to north side of the car park (2) introduction of two flues, one to the west elevation and one to the south, both are serving generators required for life safety back-up power supply to the sprinkler system to the car park (3) introduction of some additional doors where the cycle store has been divided and the replacement of two louvres for double doors (to reduce travel distance for fire egress from the plant room and for access to the sprinkler plant room on the west elevation) 03/10/2023 31/10/2023 To provide a compliant fire strategy solution Mr Mark Peacock Granted 25/10/2023
6/2019/2431/NMA2 Non material amendment following approval of planning permission 6/2019/2431/MAJ An additional wording added to condition 15 so the condition reads: 15. Prior to the first occupation of the development, a verification report must be submitted and approved in writing by the Local Planning Authority. The report must provide evidence of the following: • Confirmation that the installed glazing meets the required attenuation performance as specified in the noise report by (Ref: MLM Consulting Engineers Ltd SL/103145/SL Revision 04) table 9 page 19. • Confirmation that the acoustic screen around the skatepark has been installed as per the noise report by (Ref: MLM Consulting Engineers Ltd SL/103145/SL Revision 04) – section 7.4 figure 6 page 20. • Confirmation that the windows serving the development on the façade closest to and directly facing the skate park are sealed shut and non-openable. In addition, confirmation must be provided that all other doors (serving the balconies) and windows (serving the bedrooms) remain openable. • Provide details of the mechanical ventilation systems that have been installed in all habitable rooms (living rooms and bedrooms), provide confirmation that the units meet the ventilation rates required as stated in the TM59 overheating assessment. If an alternative acoustic screen is proposed, full details of this are to be submitted and approved in writing by the local planning authority prior to the installation. The works shall then be carried out in accordance with the approved detail. 17/11/2023 15/12/2023 The wording of the condition constrains the applicant to a particular design and specification of skate park screen. We would like the option to amend the screen design and specification whilst still meeting the acoustic requirements for the site. Therefore, we are proposing to include the additional wording (noted above) to allow this flexibility whilst still ensuring that any revised designs are submitted for Council approval prior to installation. Mr Mark Peacock Granted 26/10/2023
6/2019/2431/NMA3 Non material amendment following approval of planning permission 6/2019/2431/MAJ To make a minor amendment to the wording to condition 15 so the condition reads: 15. Prior to the first occupation of the development, a verification report must be submitted and approved in writing by the Local Planning Authority. The report must provide evidence of the following: • Confirmation that the installed glazing meets the required attenuation performance as specified in the noise report by (Ref: MLM Consulting Engineers Ltd SL/103145/SL Revision 04) table 9 page 19. • Confirmation that the windows serving the development on the façade closest to and directly facing the skate park are sealed shut and non-openable. In addition, confirmation must be provided that all other doors (serving the balconies) and windows (serving the bedrooms) remain openable. • Provide details of the mechanical ventilation systems that have been installed in all habitable rooms (living rooms and bedrooms), provide confirmation that the units meet the ventilation rates required as stated in the TM59 overheating assessment. If an alternative acoustic screen is proposed, full details of this are to be submitted and approved in writing by the local planning authority prior to the installation. The works shall then be carried out in accordance with the approved detail or as per the original screen as per the noise report by (Ref: MLM Consulting Engineers Ltd SL/103145/SL Revision 04) – section 7.4 figure 6 page 20. The approved screen or original screen should be installed prior to the occupation of the following dwellings which require the screen installation to achieve acceptable noise levels: 48 units: 1-4, 11-13, 15-20, 27-29, 31-36, 43-52, 59-68, 75-80 05/12/2023 02/01/2024 To protect the occupants of nearby residential properties from noise disturbance in accordance with the requirements of Policies D1 and R19 of the Welwyn Hatfield District Plan 2005. Mr Mark Peacock Withdrawn 10/06/2024